X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485071314000

Well Details

Well ID: 0485071314000
Loading map...
Location: 00/14-13-048-07W5/0
Location Alias: 00/14-13-48-07 W5M
Location Alias 2: 00/14-13-048-07 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 07
Section: 13
County/Municipality: Brazeau County
Well Name: ARC PEM 14-13-48-7
Operator Name: ARC Resources Ltd.
License Number: 0007596
License Date: 1954-01-14
License Status: RecCertified
Spud Date: 1954-01-26
Final Drill Date: 1954-03-19
Well Total Depth: 2042.20 m
Surface Hole Latitude: 53.146957
Surface Hole Longitude: -114.894469

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-01-14 Obtained License
1954-02-06 Drill Stem Test Performed
1954-02-07 Drill Stem Test Performed
1954-02-08 Drill Stem Test Performed
1954-02-09 Drill Stem Test Performed
1954-02-13 Drill Stem Test Performed
1954-02-14 Drill Stem Test Performed
1954-02-20 Drill Stem Test Performed
1954-02-22 Drill Stem Test Performed
1954-02-28 Drill Stem Test Performed
1954-03-08 Drill Stem Test Performed
1954-03-09 Drill Stem Test Performed
1954-03-10 Drill Stem Test Performed
1954-03-14 Drill Stem Test Performed
1954-03-18 Drill Stem Test Performed
1954-03-19 Finished Drilling
1954-03-19 Well Mode changed to Drilled and Cased
1954-03-21 Production Casing Operation Performed
1954-07-23 Perforation Treatment Performed - Bullet Perforation
1954-07-23 Perforation Treatment Performed - Jet Perforation
1954-07-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-09-16 Perforation Treatment Performed - Bullet Perforation
1954-09-16 Perforation Treatment Performed - Jet Perforation
1954-09-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-09-27 Perforation Treatment Performed - Bullet Perforation
1954-09-27 Perforation Treatment Performed - Jet Perforation
1954-09-29 Perforation Treatment Performed - Acid Wash - No Pressure
1954-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-10-13 Perforation Treatment Performed - Bullet Perforation
1954-10-13 Perforation Treatment Performed - Jet Perforation
1954-10-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-10-18 Perforation Treatment Performed - Fractured
1954-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1954-10-23 Perforation Treatment Performed - Jet Perforation
1954-10-27 Perforation Treatment Performed - Fractured
1954-11-15 Well Began Production
1954-11-15 Well Fluid changed to Crude Oil
1954-11-15 Well Mode changed to Flowing
1956-05-03 Well Fluid changed to Crude Oil
1956-05-03 Well Mode changed to Pumping
1975-12-01 Well Fluid changed to Crude Oil
1975-12-01 Well Mode changed to Suspended
1979-06-15 Well Fluid changed to Crude Oil
1979-06-15 Well Mode changed to Pumping
1988-01-09 Well Fluid changed to Crude Oil
1988-01-09 Well Mode changed to Suspended
1988-04-11 Well Fluid changed to Crude Oil
1988-04-11 Well Mode changed to Pumping
1994-04-01 Well Fluid changed to Crude Oil
1994-04-01 Well Mode changed to Suspended
2000-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-11-29 Perforation Treatment Performed - Jet Perforation
2000-11-29 Plug Back Performed
2000-11-29 Well Fluid changed to Crude Oil
2000-11-29 Well Mode changed to Abandoned Zone
2000-11-30 Perforation Treatment Performed - Cement Plug
2000-11-30 Perforation Treatment Performed - Remedial Casing
2001-05-25 Well Abandoned
2001-05-25 Well Fluid changed to Crude Oil
2001-05-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-07-23 Perforation 2012.90 2018.40 13
1954-09-27 Bullet Perforation 1903.80 1910.50 13
1954-09-29 Acid Wash 1903.80 1910.50 0
1954-10-12 Packing Device Capped w/Cement 1889.80 1889.80 0
1954-10-13 Perforation 1728.20 1735.50 13
1954-10-13 Bullet Perforation 1728.20 1735.50 13
1954-10-17 Acid Treatment 1728.20 1735.50 0
1954-10-18 Fracture 1728.20 1735.50 0
1954-10-19 Packing Device Capped w/Cement 1493.50 1493.50 0
1954-10-23 Perforation 1446.90 1456.90 13
1954-10-27 Fracture 1446.90 1456.90 0
1954-07-23 Bullet Perforation 2012.90 2018.40 13
2000-11-29 Packing Device Capped w/Cement 1431.00 1439.00 0
2000-11-29 Perforation 365.00 365.00 13
2000-11-30 Remedial Casing Cementing 365.00 365.00 0
2000-11-30 Cement Plug 338.70 366.00 0
1954-07-25 Acid Treatment 2012.90 2018.40 0
1954-09-16 Packing Device Capped w/Cement 2002.50 2002.50 0
1954-09-16 Perforation 1981.20 1985.50 13
1954-09-16 Bullet Perforation 1981.20 1985.50 13
1954-09-23 Acid Treatment 1981.20 1985.50 0
1954-09-27 Packing Device Capped w/Cement 1966.00 1966.00 0
1954-09-27 Perforation 1903.80 1910.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 2016 0.0 0.0 0.0
1968 2256 0.0 0.0 0.0
1975 2952 0.0 0.0 0.0
1979 2573 0.0 0.0 0.0
1981 2028 0.0 0.0 0.0
1987 3592 0.0 0.0 0.0
1988 5311 0.0 0.0 0.0

For data sources see[5]

References