X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485070911000

Well Details

Well ID: 0485070911000
Loading map...
Location: 00/11-09-048-07W5/0
Location Alias: 00/11-09-48-07 W5M
Location Alias 2: 00/11-09-048-07 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 07
Section: 09
County/Municipality: Brazeau County
Well Name: ARC PEMBINA 11-9-48-7
Operator Name: ARC Resources Ltd.
License Number: 0203058
License Date: 1997-06-30
License Status: Suspension
Spud Date: 1997-07-01
Final Drill Date: 1997-07-14
Well Total Depth: 2124.00 m
Surface Hole Latitude: 53.127903
Surface Hole Longitude: -114.971108

For data sources see[1][2]

Well History

Date Event
1997-06-30 Obtained License
1997-07-03 Surface Casing Operation Performed
1997-07-05 Direction Drilling Operation Performed - Deviate
1997-07-14 Finished Drilling
1997-07-14 Well Log Performed
1997-07-18 Production Casing Operation Performed
1997-07-18 Rig Released
1997-07-29 Well Log Performed
1997-08-02 Well Log Performed
1997-08-12 Well Log Performed
1997-08-13 Perforation Treatment Performed - Jet Perforation
1997-08-13 Well Log Performed
1997-08-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-08-15 Perforation Treatment Performed - Jet Perforation
1997-08-15 Well Log Performed
1997-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-01 Well Mode changed to Drilled and Cased
1998-11-07 Well Log Performed
1998-11-08 Perforation Treatment Performed - Jet Perforation
1998-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-11-10 Well Log Performed
1998-11-11 Perforation Treatment Performed - Jet Perforation
1998-11-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-11-07 Well Log Performed
2012-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-07-05 1182.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-08-13 Perforation 2039.00 2041.00 17
1998-11-11 Perforation 2060.00 2065.00 18
1998-11-12 Acid Treatment 2039.00 2065.00 0
2012-11-07 Packing Device Capped w/Cement 2047.00 2055.00 0
2012-11-09 Packing Device Capped w/Cement 1925.40 2035.00 0
1997-08-14 Acid Treatment 2039.00 2041.00 0
1997-08-15 Perforation 2039.00 2044.00 17
1997-08-16 Acid Treatment 2039.00 2044.00 0
1998-11-08 Perforation 2039.00 2044.00 18
1998-11-08 Perforation 2044.00 2049.00 18
1998-11-09 Acid Treatment 2039.00 2049.00 0
1998-11-10 Acid Treatment 2039.00 2049.00 0
1998-11-11 Perforation 2057.00 2059.00 18

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References