X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485063210002

Well Details

Well ID: 0485063210002
Loading map...
Location: 00/10-32-048-06W5/2
Location Alias: 00/10-32-48-06 W5M
Location Alias 2: 00/10-32-048-06 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 32
County/Municipality: Brazeau County
Well Name: ESSO CDN-SUP PEMBINA 10-32-48-6
Operator Name: ARC Resources Ltd.
License Number: 0087187
License Date: 1980-11-20
License Status: Issued
Spud Date: 1980-11-30
Final Drill Date: 1981-01-20
Well Total Depth: 1953.00 m
Surface Hole Latitude: 53.185806
Surface Hole Longitude: -114.841932

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-20 Obtained License
1980-12-09 Kick Occurred
1980-12-22 Lost Circulation Occurred
1980-12-26 Lost Circulation Occurred
1981-01-01 Lost Circulation Occurred
1981-01-04 Lost Circulation Occurred
1981-01-07 Lost Circulation Occurred
1981-01-20 Finished Drilling
1981-01-20 Well Mode changed to Drilled and Cased
1981-01-22 Well Log Performed
1981-01-23 Liner Casing Operation Performed
1981-02-21 Perforation Treatment Performed - Jet Perforation
1981-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-02-27 Perforation Treatment Performed - Jet Perforation
1981-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-03 Perforation Treatment Performed - Jet Perforation
1981-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-08 Perforation Treatment Performed - Jet Perforation
1981-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-01 Well Log Performed
1985-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-02 Perforation Treatment Performed - Jet Perforation
1985-03-02 Plug Back Performed
1985-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-07 Well Log Performed
1985-03-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-03-08 Plug Back Performed
1985-03-08 Well Log Performed
1985-03-09 Perforation Treatment Performed - Jet Perforation
1985-03-10 Perforation Treatment Performed - Fractured
1985-06-01 Well Began Production
1985-06-01 Well Fluid changed to Crude Oil
1985-06-01 Well Mode changed to Pumping
2002-07-01 Well Fluid changed to Crude Oil
2002-07-01 Well Mode changed to Suspended
2009-11-12 Well Fluid changed to Crude Oil
2009-11-12 Well Mode changed to Pumping
2014-10-07 Well Fluid changed to Crude Oil
2014-10-07 Well Mode changed to Suspended
2015-10-16 Well Log Performed
2015-10-19 Well Log Performed
2015-10-20 Perforation Treatment Performed - Jet Perforation
2015-10-20 Well Log Performed
2015-10-21 Well Log Performed
2016-01-22 Well Began Injection
2016-01-22 Well Fluid changed to Water
2016-01-22 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-21 Perforation 1918.00 1919.00 7
1981-03-08 Perforation 1721.00 1727.00 7
1981-03-10 Acid Treatment 1721.00 1727.00 0
1985-03-02 Packing Device Capped w/Cement 1707.00 1715.00 0
1985-03-02 Perforation 1674.00 1676.00 7
1985-03-06 Acid Treatment 1674.00 1676.00 0
1985-03-08 Packing Device Capped w/Cement 1650.00 1658.00 0
1985-03-09 Perforation 1399.00 1410.00 7
1985-03-10 Fracture 1399.00 1410.00 0
2015-10-20 Perforation 1404.00 1410.00 17
1981-02-22 Acid Treatment 1918.00 1919.00 0
1981-02-26 Packing Device Capped w/Cement 1894.00 1902.00 0
1981-02-27 Perforation 1857.00 1860.00 7
1981-02-28 Acid Treatment 1857.00 1860.00 0
1981-03-02 Acid Treatment 1857.00 1860.00 0
1981-03-03 Perforation 1860.00 1865.00 7
1981-03-04 Acid Treatment 1857.00 1865.00 0
1981-03-07 Packing Device Capped w/Cement 1761.50 1769.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 5004 0.0 0.0 0.0
1986 8579 0.0 0.0 0.0
1987 6576 0.0 0.0 0.0
1988 7204 0.0 0.0 0.0
1989 7808 0.0 0.0 0.0
1990 7781 0.0 0.0 0.0
1991 8145 0.0 0.0 0.0
1992 8573 0.0 0.0 0.0
1993 8420 0.0 0.0 0.0
1994 8402 0.0 0.0 0.0
1995 8647 0.0 0.0 0.0
1996 8372 0.0 0.0 0.0
1997 8590 0.0 0.0 0.0
1998 7622 0.0 0.0 0.0
1999 8468 0.0 0.0 0.0
2000 1752 0.0 0.0 0.0
2009 1204 0.0 0.0 0.0
2010 6330 0.0 0.0 0.0
2011 5915 0.0 0.0 0.0
2012 1680 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-12-09 Kick 1119.00 1119.00
1980-12-22 Lost Circulation 1685.00 1685.00
1980-12-26 Lost Circulation 1724.00 1724.00
1981-01-01 Lost Circulation 1769.00 1803.00
1981-01-04 Lost Circulation 1803.00 1803.00
1981-01-07 Lost Circulation 1803.00 1803.00
2015-10-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References