X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485062906020

Well Details

Well ID: 0485062906020
Loading map...
Location: 02/06-29-048-06W5/0
Location Alias: 02/06-29-48-06 W5M
Location Alias 2: 02/06-29-048-06 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 29
County/Municipality: Brazeau County
Well Name: IMP CDN-SUP PEMBINA 6-29-48-6
Operator Name: ARC Resources Ltd.
License Number: 0010207
License Date: 1955-09-16
License Status: Abandoned
Spud Date: 1955-09-27
Final Drill Date: 1955-10-04
Well Total Depth: 1127.80 m
Surface Hole Latitude: 53.168467
Surface Hole Longitude: -114.846036

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-09-16 Obtained License
1955-10-04 Finished Drilling
1955-10-04 Production Casing Operation Performed
1955-10-04 Well Mode changed to Drilled and Cased
1955-10-19 Perforation Treatment Performed - Jet Perforation
1955-10-21 Perforation Treatment Performed - Fractured
1956-01-10 Well Began Production
1956-01-10 Well Fluid changed to Crude Oil
1956-01-10 Well Mode changed to Pumping
1973-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-30 Well Began Injection
1976-04-30 Well Fluid changed to Water
1976-04-30 Well Type changed to Injection
2000-04-10 Perforation Treatment Performed - Cement Squeeze
2000-04-10 Perforation Treatment Performed - Jet Perforation
2000-04-10 Plug Back Performed
2000-04-10 Well Fluid changed to Water
2000-04-10 Well Log Performed
2000-04-10 Well Mode changed to Abandoned Zone
2000-04-10 Well Type changed to Injection
2000-10-20 Perforation Treatment Performed - Cement Squeeze
2000-11-02 Well Abandoned
2000-11-02 Well Fluid changed to Water
2000-11-02 Well Mode changed to Abandoned
2000-11-02 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-10-19 Perforation 1098.80 1102.80 13
1955-10-19 Perforation 1105.20 1112.50 13
1955-10-21 Fracture 1098.80 1112.50 0
1973-02-22 Acid Treatment 1098.80 1112.50 0
2000-04-10 Cement Squeeze 1098.80 1112.50 0
2000-04-10 Perforation 338.00 339.00 0
2000-10-20 Cement Squeeze 338.00 339.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6476 0.0 0.0 0.0
1968 5800 0.0 0.0 0.0
1969 5568 0.0 0.0 0.0
1970 3238 0.0 0.0 0.0
1971 4800 0.0 0.0 0.0
1972 8699 0.0 0.0 0.0
1973 4161 0.0 0.0 0.0
1974 5239 0.0 0.0 0.0
1975 4104 0.0 0.0 0.0
1976 780 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0

For data sources see[5]

References