X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485062816000

Well Details

Well ID: 0485062816000
Loading map...
Location: 00/16-28-048-06W5/0
Location Alias: 00/16-28-48-06 W5M
Location Alias 2: 00/16-28-048-06 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 28
County/Municipality: Brazeau County
Well Name: IMP CDN-SUP PEMBINA IN 16-28C-48-6
Operator Name: ARC Resources Ltd.
License Number: 0013155
License Date: 1957-02-25
License Status: Issued
Spud Date: 1957-02-25
Final Drill Date: 1957-03-12
Well Total Depth: 1406.00 m
Surface Hole Latitude: 53.176048
Surface Hole Longitude: -114.809299

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-02-25 Obtained License
1957-03-06 Drill Stem Test Performed
1957-03-11 Drill Stem Test Performed
1957-03-12 Finished Drilling
1957-03-12 Production Casing Operation Performed
1957-03-12 Well Mode changed to Drilled and Cased
1957-03-21 Perforation Treatment Performed - Jet Perforation
1957-03-22 Perforation Treatment Performed - Acid Wash - No Pressure
1957-03-22 Perforation Treatment Performed - Fractured
1957-03-25 Well Began Production
1957-03-25 Well Fluid changed to Crude Oil
1957-03-25 Well Mode changed to Flowing
1959-12-07 Perforation Treatment Performed - Fractured
1963-01-01 Well Began Injection
1963-01-01 Well Fluid changed to Water
1963-01-01 Well Type changed to Injection
1980-06-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-05-01 Well Fluid changed to Water
1987-05-01 Well Mode changed to Suspended
1987-05-01 Well Type changed to Injection
1991-05-15 Well Fluid changed to Water
1991-05-15 Well Type changed to Injection
1999-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-03-21 Perforation 1378.90 1379.80 13
1957-03-21 Perforation 1381.40 1382.90 13
1957-03-21 Perforation 1383.50 1384.40 13
1957-03-22 Acid Wash 1378.90 1384.40 0
1957-03-22 Fracture 1378.90 1384.40 0
1959-12-07 Fracture 1378.90 1384.40 0
1980-06-11 Acid Treatment 1378.90 1384.40 0
1999-01-27 Acid Treatment 1378.90 1383.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References