X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485062704002

Well Details

Well ID: 0485062704002
Loading map...
Location: 00/04-27-048-06W5/2
Location Alias: 00/04-27-48-06 W5M
Location Alias 2: 00/04-27-048-06 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 27
County/Municipality: Brazeau County
Well Name: RIDER PEMBINA 4-27-48-6
Operator Name: ARC Resources Ltd.
License Number: 0037519
License Date: 1970-01-02
License Status: Abandoned
Spud Date: 1970-01-05
Final Drill Date: 1970-01-15
Well Total Depth: 1386.80 m
Surface Hole Latitude: 53.165260
Surface Hole Longitude: -114.803873

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-01-02 Obtained License
1970-01-15 Finished Drilling
1970-01-15 Well Mode changed to Drilled and Cased
1970-01-16 Production Casing Operation Performed
1970-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-20 Perforation Treatment Performed - Fractured
1970-01-20 Perforation Treatment Performed - Jet Perforation
1976-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-09-16 Perforation Treatment Performed - Jet Perforation
1976-09-28 Well Began Injection
1976-09-28 Well Fluid changed to Water
1976-09-28 Well Type changed to Injection
1999-12-19 Well Log Performed
1999-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-20 Perforation Treatment Performed - Jet Perforation
1999-12-20 Plug Back Performed
1999-12-20 Well Log Performed
1999-12-21 Perforation Treatment Performed - Cement Squeeze
1999-12-22 Well Abandoned
1999-12-22 Well Fluid changed to Water
1999-12-22 Well Mode changed to Abandoned
1999-12-22 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-01-20 Perforation 1362.80 1366.70 7
1999-12-21 Cement Squeeze 190.00 302.50 0
1970-01-20 Acid Treatment 1362.80 1366.70 0
1970-01-20 Fracture 1362.80 1366.70 0
1976-09-16 Packing Device Capped w/Cement 1354.50 1354.50 0
1976-09-16 Perforation 1044.90 1047.30 7
1976-09-16 Perforation 1050.00 1052.80 7
1976-09-16 Acid Treatment 1044.90 1052.80 0
1999-12-20 Packing Device Capped w/Cement 1026.00 1034.00 0
1999-12-20 Perforation 302.50 302.80 80

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0

For data sources see[5]

References