X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485062212002

Well Details

Well ID: 0485062212002
Loading map...
Location: 00/12-22-048-06W5/2
Location Alias: 00/12-22-48-06 W5M
Location Alias 2: 00/12-22-048-06 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 22
County/Municipality: Brazeau County
Well Name: STAR PEMBINA 12-22-48-6
Operator Name: ARC Resources Ltd.
License Number: 0037272
License Date: 1969-11-27
License Status: Suspension
Spud Date: 1969-12-07
Final Drill Date: 1969-12-13
Well Total Depth: 1432.60 m
Surface Hole Latitude: 53.158062
Surface Hole Longitude: -114.803898

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-11-27 Obtained License
1969-12-13 Finished Drilling
1969-12-13 Well Mode changed to Drilled and Cased
1969-12-14 Production Casing Operation Performed
1969-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-16 Perforation Treatment Performed - Jet Perforation
1969-12-18 Perforation Treatment Performed - Fractured
1990-03-10 Well Log Performed
1990-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-03-11 Perforation Treatment Performed - Jet Perforation
1990-03-11 Plug Back Performed
1990-03-13 Perforation Treatment Performed - Fractured
1990-03-15 Well Began Production
1990-03-15 Well Fluid changed to Crude Oil
1990-03-15 Well Mode changed to Flowing
2000-10-25 Well Fluid changed to Crude Oil
2000-10-25 Well Mode changed to Pumping
2001-05-13 Perforation Treatment Performed - Jet Perforation
2001-05-13 Well Structure changed to Commingled
2008-01-01 Well Fluid changed to Crude Oil
2008-01-01 Well Mode changed to Pumping
2019-11-01 Well Fluid changed to Crude Oil
2019-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-12-16 Perforation 1375.90 1381.40 7
1969-12-16 Acid Treatment 1375.90 1381.40 0
1969-12-18 Fracture 1375.90 1381.40 0
1990-03-11 Packing Device Capped w/Cement 1360.40 1370.00 0
1990-03-11 Perforation 1054.90 1067.40 13
1990-03-13 Fracture 1054.90 1067.40 0
2001-05-13 Perforation 1375.90 1381.40 7
2001-05-13 Perforation 1376.20 1382.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 7480 0.0 0.0 0.0
1991 8705 0.0 0.0 0.0
1992 8695 0.0 0.0 0.0
1993 8047 0.0 0.0 0.0
1994 8720 0.0 0.0 0.0
1995 8575 0.0 0.0 0.0
1996 8061 0.0 0.0 0.0
1997 8232 0.0 0.0 0.0
1998 8447 0.0 0.0 0.0
1999 8299 0.0 0.0 0.0
2000 8200 0.0 0.0 0.0
2001 3047 0.0 0.0 0.0
2008 8615 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8615 0.0 0.0 0.0
2011 8705 0.0 0.0 0.0
2012 8647 0.0 0.0 0.0
2013 7820 0.0 0.0 0.0
2014 8442 0.0 0.0 0.0
2015 8412 0.0 0.0 0.0
2016 8695 0.0 0.0 0.0
2017 7089 0.0 0.0 0.0
2018 4704 0.0 0.0 0.0
2019 3367 0.0 0.0 0.0

For data sources see[5]

References