X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485062210020

Well Details

Well ID: 0485062210020
Loading map...
Location: 02/10-22-048-06W5/0
Location Alias: 02/10-22-48-06 W5M
Location Alias 2: 02/10-22-048-06 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 06
Section: 22
County/Municipality: Brazeau County
Well Name: ARC 102 HZ PEMBINA 10-22-48-6
Operator Name: ARC Resources Ltd.
License Number: 0470592
License Date: 2014-10-10
License Status: Amended
Spud Date: 2014-12-11
Final Drill Date: 2014-12-19
Well Total Depth: 3687.00 m
Surface Hole Latitude: 53.175475
Surface Hole Longitude: -114.807369

For data sources see[1][2]

Well History

Date Event
2014-10-10 Obtained License
2014-12-11 Well Log Performed
2014-12-12 Surface Casing Operation Performed
2014-12-13 Direction Drilling Operation Performed - Deviate
2014-12-14 Direction Drilling Operation Performed - Horizontal
2014-12-15 Intermediate Casing Operation Performed
2014-12-19 Finished Drilling
2014-12-19 Well Log Performed
2014-12-19 Well Mode changed to Drilled and Cased
2014-12-20 Liner Casing Operation Performed
2014-12-20 Perforation Treatment Performed - Open-Hole Completion
2014-12-21 Rig Released
2015-01-15 Well Log Performed
2015-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-14 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-28 Well Began Production
2015-07-28 Well Fluid changed to Crude Oil
2015-07-28 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-12-11 Excalibur Drilling Ltd. 8 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-12-13 962.60 Deviate (5 - 79 degrees)
2014-12-14 1589.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-20 Open Hole/Barefoot Completion 3674.50 3687.00 0
2015-07-14 Multi-Stage Fracture 2955.00 2955.10 0
2015-07-14 Multi-Stage Fracture 2883.70 2883.80 0
2015-07-14 Multi-Stage Fracture 2812.40 2812.50 0
2015-07-14 Multi-Stage Fracture 2741.80 2741.90 0
2015-07-14 Multi-Stage Fracture 2670.50 2670.60 0
2015-07-14 Multi-Stage Fracture 2599.20 2599.30 0
2015-07-14 Multi-Stage Fracture 2530.00 2530.10 0
2015-07-14 Multi-Stage Fracture 2445.60 2445.70 0
2015-07-14 Multi-Stage Fracture 2360.70 2360.80 0
2015-07-14 Multi-Stage Fracture 2303.20 2303.30 0
2015-07-12 Multi-Stage Fracture 3651.30 3651.40 0
2015-07-14 Multi-Stage Fracture 2231.90 2232.00 0
2015-07-14 Multi-Stage Fracture 2174.40 2174.50 0
2015-07-14 Multi-Stage Fracture 2104.50 2104.60 0
2015-07-14 Multi-Stage Fracture 2047.10 2047.20 0
2015-07-14 Multi-Stage Fracture 1976.00 1976.10 0
2015-07-14 Multi-Stage Fracture 1904.70 1904.80 0
2015-07-14 Multi-Stage Fracture 1819.60 1819.70 0
2015-07-14 Multi-Stage Fracture 1762.10 1762.20 0
2015-07-14 Multi-Stage Fracture 1704.90 1705.00 0
2015-07-12 Multi-Stage Fracture 3549.30 3549.40 0
2015-07-12 Multi-Stage Fracture 3478.00 3478.10 0
2015-07-12 Multi-Stage Fracture 3407.60 3407.70 0
2015-07-12 Multi-Stage Fracture 3338.60 3338.70 0
2015-07-12 Multi-Stage Fracture 3254.00 3254.10 0
2015-07-12 Multi-Stage Fracture 3182.70 3182.80 0
2015-07-12 Multi-Stage Fracture 3097.60 3097.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-12 2015-07-14 1,400 3,408 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 88.0616 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 9.9186 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 2.3495 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 0.7431 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.011 N/A
dibromoacetonitrile 3252-43-5 100 0.011 N/A
non-hazardous ingredients Not Available 100 0.011 N/A
polyethylene glycol 25322-68-3 100 0.011 N/A
sodium bromide 7647-15-6 100 0.011 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1937 N/A
non-hazardous ingredients Not Available 100 0.1937 N/A
FR-8 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0453 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0453 N/A
non-hazardous ingredients Not Available 100 0.0453 N/A
S-17 Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0951 N/A
water Not Available 100 0.0951 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-13 2015-07-13 Surface Water - Runoff 3263

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3776 0.0 0.0 0.0
2016 8471 0.0 0.0 0.0
2017 8574 0.0 0.0 0.0
2018 8736 0.0 0.0 0.0
2019 8581 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-21 No Incident Encountered 0.00 0.00
2015-07-12 No Incident Encountered 0.00 0.00
2015-07-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References