If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485061016030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.111328,"lon":-114.784014,"icon":""}]} |
Location: 03/16-10-048-06W5/0 | |
Location Alias: 03/16-10-48-06 W5M | |
Location Alias 2: 03/16-10-048-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 06 | |
Section: 10 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA 103 HZ PEMBINA 16-10-48-6 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0480008 | |
License Date: 2016-08-02 | |
License Status: Issued | |
Spud Date: 2016-08-16 | |
Final Drill Date: 2016-08-23 | |
Well Total Depth: 3963.00 m | |
Surface Hole Latitude: 53.111328 | |
Surface Hole Longitude: -114.784014 |
Date | Event |
---|---|
2016-08-02 | Obtained License |
2016-08-17 | Direction Drilling Operation Performed - Deviate |
2016-08-17 | Surface Casing Operation Performed |
2016-08-19 | Direction Drilling Operation Performed - Horizontal |
2016-08-23 | Finished Drilling |
2016-08-23 | Well Log Performed |
2016-08-23 | Well Mode changed to Drilled and Cased |
2016-08-24 | Production Casing Operation Performed |
2016-08-25 | Rig Released |
2016-10-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-10-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-10-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-11-11 | Well Began Production |
2016-11-11 | Well Fluid changed to Crude Oil |
2016-11-11 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-08-16 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-08-17 | 546.20 | Deviate (5 - 79 degrees) |
2016-08-19 | 1598.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-10-27 | Multi-Stage Fracture | 3925.20 | 3925.70 | 0 |
2016-10-28 | Multi-Stage Fracture | 3440.10 | 3442.00 | 0 |
2016-10-28 | Multi-Stage Fracture | 3386.10 | 3388.00 | 0 |
2016-10-28 | Multi-Stage Fracture | 3332.60 | 3334.50 | 0 |
2016-10-28 | Multi-Stage Fracture | 3279.00 | 3280.90 | 0 |
2016-10-28 | Multi-Stage Fracture | 3225.40 | 3227.30 | 0 |
2016-10-28 | Multi-Stage Fracture | 3171.20 | 3173.10 | 0 |
2016-10-28 | Multi-Stage Fracture | 3117.20 | 3119.10 | 0 |
2016-10-28 | Multi-Stage Fracture | 3063.20 | 3065.10 | 0 |
2016-10-28 | Multi-Stage Fracture | 3009.10 | 3011.50 | 0 |
2016-10-28 | Multi-Stage Fracture | 2954.90 | 2956.80 | 0 |
2016-10-27 | Multi-Stage Fracture | 3872.90 | 3874.80 | 0 |
2016-10-28 | Multi-Stage Fracture | 2900.90 | 2902.80 | 0 |
2016-10-28 | Multi-Stage Fracture | 2846.90 | 2848.80 | 0 |
2016-10-28 | Multi-Stage Fracture | 2792.80 | 2794.70 | 0 |
2016-10-28 | Multi-Stage Fracture | 2738.40 | 2740.30 | 0 |
2016-10-28 | Multi-Stage Fracture | 2684.30 | 2686.20 | 0 |
2016-10-28 | Multi-Stage Fracture | 2630.90 | 2632.80 | 0 |
2016-10-28 | Multi-Stage Fracture | 2576.90 | 2578.80 | 0 |
2016-10-28 | Multi-Stage Fracture | 2522.30 | 2524.20 | 0 |
2016-10-28 | Multi-Stage Fracture | 2468.10 | 2470.00 | 0 |
2016-10-28 | Multi-Stage Fracture | 2413.90 | 2415.80 | 0 |
2016-10-27 | Multi-Stage Fracture | 3818.80 | 3820.70 | 0 |
2016-10-28 | Multi-Stage Fracture | 2360.40 | 2362.20 | 0 |
2016-10-28 | Multi-Stage Fracture | 2306.40 | 2308.30 | 0 |
2016-10-28 | Multi-Stage Fracture | 2252.90 | 2254.80 | 0 |
2016-10-28 | Multi-Stage Fracture | 2199.40 | 2201.30 | 0 |
2016-10-29 | Multi-Stage Fracture | 2145.60 | 2147.50 | 0 |
2016-10-29 | Multi-Stage Fracture | 2091.90 | 2093.80 | 0 |
2016-10-29 | Multi-Stage Fracture | 2038.00 | 2039.90 | 0 |
2016-10-29 | Multi-Stage Fracture | 1984.40 | 1986.30 | 0 |
2016-10-29 | Multi-Stage Fracture | 1930.90 | 1932.80 | 0 |
2016-10-29 | Multi-Stage Fracture | 1877.20 | 1879.10 | 0 |
2016-10-28 | Multi-Stage Fracture | 3764.80 | 3766.70 | 0 |
2016-10-29 | Multi-Stage Fracture | 1823.40 | 1825.30 | 0 |
2016-10-29 | Multi-Stage Fracture | 1769.30 | 1771.20 | 0 |
2016-10-29 | Multi-Stage Fracture | 1715.20 | 1717.10 | 0 |
2016-10-29 | Multi-Stage Fracture | 1661.10 | 1663.00 | 0 |
2016-10-29 | Multi-Stage Fracture | 1607.60 | 1609.50 | 0 |
2016-10-28 | Multi-Stage Fracture | 3710.80 | 3712.70 | 0 |
2016-10-28 | Multi-Stage Fracture | 3657.20 | 3659.10 | 0 |
2016-10-28 | Multi-Stage Fracture | 3603.10 | 3605.00 | 0 |
2016-10-28 | Multi-Stage Fracture | 3548.90 | 3550.80 | 0 |
2016-10-28 | Multi-Stage Fracture | 3494.60 | 3496.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-10-27 | 2016-10-29 | 1,450 | 4,529 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 86.1222 | N/A | |||
Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 4.8591 | N/A | ||
Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 8.8422 | N/A | ||
AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0102 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0102 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0102 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0102 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0102 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.092 | N/A | |
water | Not Available | 100 | 0.092 | N/A | ||||
DF-1 | Trican | Defoamer | non-hazardous ingredients | Not Available | 100 | 0.0043 | N/A | |
GNE-2 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0439 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.0439 | N/A | ||||
GFR-5D | Trican | Friction Reducer | anionic polyacrylamide | Not Available | 100 | 0.0258 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-10-25 | 2016-10-31 | Oilfield Produced Water | 1791 |
2016-10-06 | 2016-10-16 | Surface Water - Runoff | 3087 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 1198 | 0.0 | 0.0 | 0.0 |
2017 | 8531 | 0.0 | 0.0 | 0.0 |
2018 | 8589 | 0.0 | 0.0 | 0.0 |
2019 | 8690 | 0.0 | 0.0 | 0.0 |
2020 | 2149 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-08-25 | No Incident Encountered | 0.00 | 0.00 |
2016-10-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]