X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485052805000

Well Details

Well ID: 0485052805000
Loading map...
Location: 00/05-28-048-05W5/0
Location Alias: 00/05-28-48-05 W5M
Location Alias 2: 00/05-28-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 28
County/Municipality: Brazeau County
Well Name: SINOPEC HZ PEMBINA 5-28-48-5
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0462420
License Date: 2013-12-13
License Status: Issued
Spud Date: 2014-01-08
Final Drill Date: 2014-01-18
Well Total Depth: 2800.00 m
Surface Hole Latitude: 53.167338
Surface Hole Longitude: -114.658662

For data sources see[1][2]

Well History

Date Event
2013-12-13 Obtained License
2014-01-09 Surface Casing Operation Performed
2014-01-16 Direction Drilling Operation Performed - Deviate
2014-01-16 Direction Drilling Operation Performed - Horizontal
2014-01-17 Well Log Performed
2014-01-18 Finished Drilling
2014-01-18 Well Log Performed
2014-01-18 Well Mode changed to Drilled and Cased
2014-01-19 Production Casing Operation Performed
2014-01-19 Rig Released
2014-01-19 Well Log Performed
2014-02-13 Well Log Performed
2014-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-03 Perforation Treatment Performed - Open-Hole Completion
2014-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-06 Well Began Production
2014-03-06 Well Fluid changed to Crude Oil
2014-03-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-08 Ensign Drilling Inc. 54 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-01-16 1070.60 Deviate (5 - 79 degrees)
2014-01-16 1430.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-03 Open Hole/Barefoot Completion 2791.00 2800.00 0
2014-03-05 Multi-Stage Fracture 2357.70 2357.80 0
2014-03-05 Multi-Stage Fracture 2311.30 2311.40 0
2014-03-05 Multi-Stage Fracture 2253.20 2253.30 0
2014-03-05 Multi-Stage Fracture 2206.90 2207.00 0
2014-03-05 Multi-Stage Fracture 2160.20 2160.30 0
2014-03-05 Multi-Stage Fracture 2113.40 2113.50 0
2014-03-05 Multi-Stage Fracture 2054.90 2055.00 0
2014-03-05 Multi-Stage Fracture 2008.40 2008.50 0
2014-03-05 Multi-Stage Fracture 1961.90 1962.00 0
2014-03-05 Multi-Stage Fracture 1915.30 1915.40 0
2014-03-03 Multi-Stage Fracture 2777.70 2777.80 0
2014-03-05 Multi-Stage Fracture 1868.00 1868.10 0
2014-03-05 Multi-Stage Fracture 1809.90 1810.00 0
2014-03-05 Multi-Stage Fracture 1762.70 1762.80 0
2014-03-05 Multi-Stage Fracture 1715.70 1715.80 0
2014-03-05 Multi-Stage Fracture 1668.50 1668.60 0
2014-03-05 Multi-Stage Fracture 1610.20 1610.30 0
2014-03-05 Multi-Stage Fracture 1563.50 1563.60 0
2014-03-05 Multi-Stage Fracture 1516.20 1516.30 0
2014-03-03 Multi-Stage Fracture 2719.00 2719.10 0
2014-03-03 Multi-Stage Fracture 2660.90 2661.00 0
2014-03-03 Multi-Stage Fracture 2613.90 2614.00 0
2014-03-03 Multi-Stage Fracture 2567.30 2567.40 0
2014-03-03 Multi-Stage Fracture 2509.10 2509.20 0
2014-03-03 Multi-Stage Fracture 2462.70 2462.80 0
2014-03-03 Multi-Stage Fracture 2404.70 2404.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-03-03 2014-03-05 1,335 3,145 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.7465 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 11.7294 N/A
Crystalline silica. quartz 14808-60-7 100 11.7294 N/A
Iron Oxide 1309-37-1 100 11.7294 N/A
Titanium Oxide 13463-67-7 100 11.7293 N/A
SB Prime (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 1.9765 N/A
Phenol formaldehyde resin 9003-35-4 100 1.9765 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.035 N/A
Water 7732-18-5 100 0.035 N/A
CAN-1911 Clay Stabilizer Canyon Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0903 N/A
Water 7732-18-5 100 0.0903 N/A
Nitrogen Gas Canyon Energizing Fluid Nitrogen 7727-37-9 100 3.2985 N/A
Non-hazardous base ingredient(s) Not Available 100 3.2985 N/A
CAN-2057 Friction Reducer Canyon Friction Reducer No hazardous ingredients Not Available 100 0.0442 N/A
CAN-2410 Demulsifier Canyon Surfactant Methyl Alcohol 67-56-1 100 0.0794 N/A
Water 7732-18-5 100 0.0794 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-02-26 2014-03-04 Surface Water - Lake 2538
2014-02-26 2014-03-04 Recycled Fracturing Water (treated at well site) 641

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 5844 0.0 0.0 0.0
2015 8147 0.0 0.0 0.0
2016 8459 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8532 0.0 0.0 0.0
2019 7783 0.0 0.0 0.0
2020 1991 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-19 No Incident Encountered 0.00 0.00
2014-03-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References