If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485052610000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.171381,"lon":-114.590654,"icon":""}]} |
Location: 00/10-26-048-05W5/0 | |
Location Alias: 00/10-26-48-05 W5M | |
Location Alias 2: 00/10-26-048-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 05 | |
Section: 26 | |
County/Municipality: Brazeau County | |
Well Name: JOURNEY HZ PEMBINA 10-26-48-5 | |
Operator Name: Journey Energy Inc. | |
License Number: 0448009 | |
License Date: 2012-08-27 | |
License Status: Issued | |
Spud Date: 2012-09-25 | |
Final Drill Date: 2012-10-11 | |
Well Total Depth: 3261.00 m | |
Surface Hole Latitude: 53.171381 | |
Surface Hole Longitude: -114.590654 |
Date | Event |
---|---|
2012-08-27 | Obtained License |
2012-09-25 | Well Log Performed |
2012-09-26 | Surface Casing Operation Performed |
2012-09-28 | Direction Drilling Operation Performed - Deviate |
2012-10-02 | Direction Drilling Operation Performed - Horizontal |
2012-10-02 | Intermediate Casing Operation Performed |
2012-10-11 | Finished Drilling |
2012-10-11 | Well Log Performed |
2012-10-11 | Well Mode changed to Drilled and Cased |
2012-10-13 | Liner Casing Operation Performed |
2012-10-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-10-14 | Perforation Treatment Performed - Open-Hole Completion |
2012-10-15 | Rig Released |
2012-10-22 | Well Began Production |
2012-10-22 | Well Fluid changed to Crude Oil |
2012-10-22 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-09-25 | Quintera Drilling Ltd. | 3 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-09-28 | 1056.80 | Deviate (5 - 79 degrees) |
2012-10-02 | 1425.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-10-14 | Open Hole/Barefoot Completion | 3255.00 | 3261.00 | 0 |
2012-10-14 | Multi-Stage Fracture | 2575.60 | 2576.40 | 0 |
2012-10-14 | Multi-Stage Fracture | 2493.10 | 2493.90 | 0 |
2012-10-14 | Multi-Stage Fracture | 2410.00 | 2410.80 | 0 |
2012-10-14 | Multi-Stage Fracture | 2317.80 | 2318.60 | 0 |
2012-10-14 | Multi-Stage Fracture | 2233.80 | 2234.60 | 0 |
2012-10-14 | Multi-Stage Fracture | 2148.90 | 2149.70 | 0 |
2012-10-14 | Multi-Stage Fracture | 2067.70 | 2068.50 | 0 |
2012-10-14 | Multi-Stage Fracture | 1986.90 | 1987.70 | 0 |
2012-10-14 | Multi-Stage Fracture | 1895.30 | 1896.10 | 0 |
2012-10-14 | Multi-Stage Fracture | 1813.40 | 1814.20 | 0 |
2012-10-14 | Multi-Stage Fracture | 3234.30 | 3235.60 | 0 |
2012-10-14 | Multi-Stage Fracture | 1729.90 | 1730.70 | 0 |
2012-10-14 | Multi-Stage Fracture | 1646.30 | 1647.10 | 0 |
2012-10-14 | Multi-Stage Fracture | 1551.40 | 1552.20 | 0 |
2012-10-14 | Multi-Stage Fracture | 1490.00 | 1490.80 | 0 |
2012-10-14 | Multi-Stage Fracture | 3176.90 | 3177.70 | 0 |
2012-10-14 | Multi-Stage Fracture | 3091.70 | 3092.50 | 0 |
2012-10-14 | Multi-Stage Fracture | 3006.50 | 3007.30 | 0 |
2012-10-14 | Multi-Stage Fracture | 2922.90 | 2923.70 | 0 |
2012-10-14 | Multi-Stage Fracture | 2827.60 | 2828.40 | 0 |
2012-10-14 | Multi-Stage Fracture | 2744.60 | 2745.40 | 0 |
2012-10-14 | Multi-Stage Fracture | 2659.50 | 2660.30 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 1389 | 0.0 | 0.0 | 0.0 |
2013 | 8465 | 0.0 | 0.0 | 0.0 |
2014 | 7573 | 0.0 | 0.0 | 0.0 |
2015 | 7778 | 0.0 | 0.0 | 0.0 |
2016 | 7944 | 0.0 | 0.0 | 0.0 |
2017 | 7572 | 0.0 | 0.0 | 0.0 |
2018 | 8637 | 0.0 | 0.0 | 0.0 |
2019 | 7297 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-10-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]