X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485052506000

Well Details

Well ID: 0485052506000
Loading map...
Location: 00/06-25-048-05W5/0
Location Alias: 00/06-25-48-05 W5M
Location Alias 2: 00/06-25-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 25
County/Municipality: Brazeau County
Well Name: FORTE KEYSTONE 6-25-48-5
Operator Name: Journey Energy Inc.
License Number: 0018040
License Date: 1959-11-02
License Status: Suspension
Spud Date: 1959-11-01
Final Drill Date: 1959-11-15
Well Total Depth: 1319.80 m
Surface Hole Latitude: 53.169073
Surface Hole Longitude: -114.601572

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-11-02 Obtained License
1959-11-15 Finished Drilling
1959-11-15 Well Mode changed to Drilled and Cased
1959-11-18 Production Casing Operation Performed
1959-12-03 Perforation Treatment Performed - Acid Wash - No Pressure
1959-12-03 Perforation Treatment Performed - Jet Perforation
1959-12-04 Perforation Treatment Performed - Fractured
1959-12-16 Well Began Production
1959-12-16 Well Fluid changed to Crude Oil
1959-12-16 Well Mode changed to Flowing
1959-12-29 Well Fluid changed to Crude Oil
1959-12-29 Well Mode changed to Pumping
1972-12-01 Well Fluid changed to Crude Oil
1972-12-01 Well Mode changed to Suspended
1978-06-07 Well Fluid changed to Crude Oil
1978-06-07 Well Mode changed to Pumping
2016-11-01 Well Fluid changed to Crude Oil
2016-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-12-03 Perforation 1293.00 1293.60 7
1959-12-03 Perforation 1294.20 1296.90 7
1959-12-03 Perforation 1297.50 1298.10 7
1959-12-03 Perforation 1298.80 1299.40 7
1959-12-03 Perforation 1300.00 1300.60 7
1959-12-03 Perforation 1301.20 1301.80 7
1959-12-03 Acid Wash 1293.00 1301.80 0
1959-12-04 Fracture 1293.00 1301.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8531 0.0 0.0 0.0
1968 6699 0.0 0.0 0.0
1969 5088 0.0 0.0 0.0
1970 4476 0.0 0.0 0.0
1971 2040 0.0 0.0 0.0
1972 1944 0.0 0.0 0.0
1978 3936 0.0 0.0 0.0
1979 5176 0.0 0.0 0.0
1980 7871 0.0 0.0 0.0
1981 8512 0.0 0.0 0.0
1982 7205 0.0 0.0 0.0
1983 6282 0.0 0.0 0.0
1984 8558 0.0 0.0 0.0
1985 8537 0.0 0.0 0.0
1986 8277 0.0 0.0 0.0
1987 8196 0.0 0.0 0.0
1988 8783 0.0 0.0 0.0
1989 7835 0.0 0.0 0.0
1990 8578 0.0 0.0 0.0
1991 8253 0.0 0.0 0.0
1992 8224 0.0 0.0 0.0
1993 8747 0.0 0.0 0.0
1994 8735 0.0 0.0 0.0
1995 8669 0.0 0.0 0.0
1996 8695 0.0 0.0 0.0
1997 8735 0.0 0.0 0.0
1998 8663 0.0 0.0 0.0
1999 6796 0.0 0.0 0.0
2000 8655 0.0 0.0 0.0
2001 7516 0.0 0.0 0.0
2002 8601 0.0 0.0 0.0
2003 7889 0.0 0.0 0.0
2004 8771 0.0 0.0 0.0
2005 8203 0.0 0.0 0.0
2006 8615 0.0 0.0 0.0
2007 6035 0.0 0.0 0.0
2008 8375 0.0 0.0 0.0
2009 7751 0.0 0.0 0.0
2010 8579 0.0 0.0 0.0
2011 4392 0.0 0.0 0.0
2012 4858 0.0 0.0 0.0
2013 8333 0.0 0.0 0.0
2014 8582 0.0 0.0 0.0
2015 1464 0.0 0.0 0.0

For data sources see[5]

References