X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485052215000

Well Details

Well ID: 0485052215000
Loading map...
Location: 00/15-22-048-05W5/0
Location Alias: 00/15-22-48-05 W5M
Location Alias 2: 00/15-22-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 22
County/Municipality: Brazeau County
Well Name: BONTERRA ET AL HZ PEMBINA 15-22-48-5
Operator Name: Bonterra Energy Corp.
License Number: 0421815
License Date: 2010-07-13
License Status: Issued
Spud Date: 2010-07-27
Final Drill Date: 2010-08-06
Well Total Depth: 2731.00 m
Surface Hole Latitude: 53.159995
Surface Hole Longitude: -114.664210

For data sources see[1][2]

Well History

Date Event
2010-07-13 Obtained License
2010-07-27 Well Log Performed
2010-07-29 Surface Casing Operation Performed
2010-07-30 Direction Drilling Operation Performed - Deviate
2010-07-30 Direction Drilling Operation Performed - Horizontal
2010-08-03 Intermediate Casing Operation Performed
2010-08-03 Well Log Performed
2010-08-06 Finished Drilling
2010-08-06 Well Mode changed to Drilled and Cased
2010-08-08 Liner Casing Operation Performed
2010-08-09 Rig Released
2010-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-07 Well Began Production
2010-11-07 Well Fluid changed to Crude Oil
2010-11-07 Well Mode changed to Pumping
2011-07-27 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-30 496.00 Deviate (5 - 79 degrees)
2010-07-30 1068.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-09-24 Multi-Stage Fracture 2688.20 2731.00 0
2010-09-24 Multi-Stage Fracture 2082.70 2137.90 0
2010-09-24 Multi-Stage Fracture 2013.00 2081.10 0
2010-09-24 Multi-Stage Fracture 1943.30 2011.40 0
2010-09-24 Multi-Stage Fracture 1886.50 1941.70 0
2010-09-24 Multi-Stage Fracture 1816.80 1884.90 0
2010-09-24 Multi-Stage Fracture 1747.10 1815.20 0
2010-09-24 Multi-Stage Fracture 1690.40 1745.50 0
2010-09-24 Multi-Stage Fracture 1620.00 1688.90 0
2010-09-24 Multi-Stage Fracture 2600.70 2668.70 0
2010-09-24 Multi-Stage Fracture 2531.00 2599.10 0
2010-09-24 Multi-Stage Fracture 2474.20 2529.40 0
2010-09-24 Multi-Stage Fracture 2404.50 2472.60 0
2010-09-24 Multi-Stage Fracture 2334.80 2402.90 0
2010-09-24 Multi-Stage Fracture 2278.00 2333.20 0
2010-09-24 Multi-Stage Fracture 2209.20 2276.40 0
2010-09-24 Multi-Stage Fracture 2139.50 2207.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1296 0.0 0.0 0.0
2011 8636 0.0 0.0 0.0
2012 8592 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8623 0.0 0.0 0.0
2016 8777 0.0 0.0 0.0
2017 8709 0.0 0.0 0.0
2018 8747 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References