X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485051805000

Well Details

Well ID: 0485051805000
Loading map...
Location: 00/05-18-048-05W5/0
Location Alias: 00/05-18-48-05 W5M
Location Alias 2: 00/05-18-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 18
County/Municipality: Brazeau County
Well Name: BONTERRA HZ PEMBINA 5-18-48-5
Operator Name: Bonterra Energy Corp.
License Number: 0475785
License Date: 2015-06-15
License Status: Issued
Spud Date: 2015-07-18
Final Drill Date: 2015-07-23
Well Total Depth: 3222.00 m
Surface Hole Latitude: 53.124371
Surface Hole Longitude: -114.726641

For data sources see[1][2]

Well History

Date Event
2015-06-15 Obtained License
2015-07-19 Surface Casing Operation Performed
2015-07-20 Direction Drilling Operation Performed - Deviate
2015-07-21 Direction Drilling Operation Performed - Horizontal
2015-07-23 Finished Drilling
2015-07-23 Production Casing Operation Performed
2015-07-23 Well Mode changed to Drilled and Cased
2015-07-24 Rig Released
2015-10-12 Well Log Performed
2015-10-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-05 Well Began Production
2015-11-05 Well Fluid changed to Crude Oil
2015-11-05 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-18 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-20 1104.40 Deviate (5 - 79 degrees)
2015-07-21 1628.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-10-17 Multi-Stage Fracture 3194.10 3194.40 0
2015-10-17 Multi-Stage Fracture 2668.60 2670.50 0
2015-10-17 Multi-Stage Fracture 2610.80 2612.70 0
2015-10-17 Multi-Stage Fracture 2552.00 2553.80 0
2015-10-17 Multi-Stage Fracture 2493.10 2495.00 0
2015-10-17 Multi-Stage Fracture 2434.30 2436.20 0
2015-10-17 Multi-Stage Fracture 2375.80 2377.70 0
2015-10-17 Multi-Stage Fracture 2316.90 2318.80 0
2015-10-17 Multi-Stage Fracture 2258.00 2259.90 0
2015-10-17 Multi-Stage Fracture 2199.10 2201.00 0
2015-10-17 Multi-Stage Fracture 2140.30 2142.20 0
2015-10-17 Multi-Stage Fracture 3137.40 3139.30 0
2015-10-17 Multi-Stage Fracture 2081.40 2083.30 0
2015-10-17 Multi-Stage Fracture 2022.50 2024.40 0
2015-10-17 Multi-Stage Fracture 1963.60 1965.50 0
2015-10-17 Multi-Stage Fracture 1904.70 1906.60 0
2015-10-17 Multi-Stage Fracture 1845.80 1847.70 0
2015-10-17 Multi-Stage Fracture 1786.90 1788.80 0
2015-10-18 Multi-Stage Fracture 1728.00 1729.90 0
2015-10-18 Multi-Stage Fracture 1682.60 1684.50 0
2015-10-17 Multi-Stage Fracture 3079.00 3080.90 0
2015-10-17 Multi-Stage Fracture 3020.60 3022.50 0
2015-10-17 Multi-Stage Fracture 2961.80 2963.70 0
2015-10-17 Multi-Stage Fracture 2904.10 2905.90 0
2015-10-17 Multi-Stage Fracture 2845.20 2847.10 0
2015-10-17 Multi-Stage Fracture 2786.40 2788.30 0
2015-10-17 Multi-Stage Fracture 2727.50 2729.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-17 2015-10-18 1,417 2,336 N/A
2 2015-10-17 2015-10-17 1,417 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.1292 N/A
20/40 Sanjel Crystalline Silica 14808-60-7 100 10.361 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 4.704 N/A
40/70 Sanjel Crystalline Silica 14808-60-7 100 0.5356 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1728 N/A
Non-Hazardous Ingredients Not Available 100 0.1728 N/A
FRW-5 Sanjel Friction Reducer Alcohols. C11-14 iso. C13-rich. ethoxylated 78330-21-9 100 0.0976 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0976 N/A
Non-Hazardous Ingredients Not Available 100 0.0976 N/A
NE-5 Sanjel Surfactant Alkyl benzenesulfonic acid 68584-22-5 100 0.0947 N/A
Diethylenetriamine 111-40-0 100 0.0947 N/A
Isopropyl Alcohol 67-63-0 100 0.0947 N/A
Non-Hazardous Ingredients Not Available 100 0.0947 N/A
2 SanLube Sanjel Friction Reducer Sorbitan Trioleate 26266-58-0 100 0.0647 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-09 2015-07-17 Recycled Fracturing Water (treated at well site) 1353
2015-07-14 2015-07-18 Recycled Fracturing Water (treated at well site) 1014
2015-06-22 2015-06-28 Recycled Fracturing Water (treated at well site) 86

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1265 0.0 0.0 0.0
2016 8457 0.0 0.0 0.0
2017 8691 0.0 0.0 0.0
2018 8343 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2098 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-24 No Incident Encountered 0.00 0.00
2015-10-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References