X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485051308000

Well Details

Well ID: 0485051308000
Loading map...
Location: 00/08-13-048-05W5/0
Location Alias: 00/08-13-48-05 W5M
Location Alias 2: 00/08-13-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 13
County/Municipality: Brazeau County
Well Name: WHITECAP PEMBINA 8-13-48-5
Operator Name: Whitecap Resources Inc.
License Number: 0421682
License Date: 2010-07-07
License Status: Issued
Spud Date: 2010-07-25
Final Drill Date: 2010-08-01
Well Total Depth: 2738.00 m
Surface Hole Latitude: 53.140538
Surface Hole Longitude: -114.612669

For data sources see[1][2]

Well History

Date Event
2010-07-07 Obtained License
2010-07-26 Surface Casing Operation Performed
2010-07-27 Direction Drilling Operation Performed - Horizontal
2010-07-27 Well Log Performed
2010-07-29 Intermediate Casing Operation Performed
2010-08-01 Finished Drilling
2010-08-01 Well Mode changed to Drilled and Cased
2010-08-03 Well Log Performed
2010-08-04 Liner Casing Operation Performed
2010-08-04 Rig Released
2010-08-05 Liner Casing Operation Performed
2010-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2010-08-09 Perforation Treatment Performed - Open-Hole Completion
2010-10-12 Well Began Production
2010-10-12 Well Fluid changed to Crude Oil
2010-10-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-27 1051.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-09 Open Hole/Barefoot Completion 2733.00 2738.00 0
2010-08-09 Multi-Stage Fracture 1999.80 1999.90 0
2010-08-09 Multi-Stage Fracture 1915.10 1915.20 0
2010-08-09 Multi-Stage Fracture 1815.70 1815.80 0
2010-08-09 Multi-Stage Fracture 1722.30 1722.40 0
2010-08-09 Multi-Stage Fracture 1639.80 1639.90 0
2010-08-09 Multi-Stage Fracture 1544.70 1544.80 0
2010-08-09 Multi-Stage Fracture 2713.50 2713.60 0
2010-08-09 Multi-Stage Fracture 2623.40 2623.50 0
2010-08-09 Multi-Stage Fracture 2537.70 2537.80 0
2010-08-09 Multi-Stage Fracture 2452.40 2452.50 0
2010-08-09 Multi-Stage Fracture 2356.10 2356.20 0
2010-08-09 Multi-Stage Fracture 2271.10 2271.20 0
2010-08-09 Multi-Stage Fracture 2173.90 2174.00 0
2010-08-09 Multi-Stage Fracture 2088.30 2088.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1636 0.0 0.0 0.0
2011 8717 0.0 0.0 0.0
2012 8704 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8735 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References