X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485051016000

Well Details

Well ID: 0485051016000
Loading map...
Location: 00/16-10-048-05W5/0
Location Alias: 00/16-10-48-05 W5M
Location Alias 2: 00/16-10-048-05 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 05
Section: 10
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 16-10-48-5
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0412963
License Date: 2009-10-08
License Status: Suspension
Spud Date: 2009-10-24
Final Drill Date: 2009-11-06
Well Total Depth: 2724.00 m
Surface Hole Latitude: 53.133134
Surface Hole Longitude: -114.657406

For data sources see[1][2]

Well History

Date Event
2009-10-08 Obtained License
2009-10-27 Surface Casing Operation Performed
2009-10-28 Direction Drilling Operation Performed - Deviate
2009-10-29 Direction Drilling Operation Performed - Horizontal
2009-10-30 Well Log Performed
2009-10-31 Well Log Performed
2009-11-02 Intermediate Casing Operation Performed
2009-11-05 Well Log Performed
2009-11-06 Finished Drilling
2009-11-06 Well Mode changed to Drilled and Cased
2009-11-07 Well Log Performed
2009-11-08 Liner Casing Operation Performed
2009-11-09 Rig Released
2009-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2009-11-16 Perforation Treatment Performed - Open-Hole Completion
2010-01-05 Well Began Production
2010-01-05 Well Fluid changed to Crude Oil
2010-01-05 Well Mode changed to Flowing
2014-11-01 Well Fluid changed to Crude Oil
2014-11-01 Well Mode changed to Pumping
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-10-28 1135.90 Deviate (5 - 79 degrees)
2009-10-29 1494.78 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-11-16 Open Hole/Barefoot Completion 2719.00 2724.00 0
2009-11-16 Multi-Stage Fracture 1799.00 1799.10 0
2009-11-16 Multi-Stage Fracture 1690.90 1691.00 0
2009-11-16 Multi-Stage Fracture 1582.40 1582.50 0
2009-11-16 Multi-Stage Fracture 2671.90 2672.00 0
2009-11-16 Multi-Stage Fracture 2545.90 2546.00 0
2009-11-16 Multi-Stage Fracture 2436.20 2436.30 0
2009-11-16 Multi-Stage Fracture 2326.50 2326.60 0
2009-11-16 Multi-Stage Fracture 2219.70 2219.80 0
2009-11-16 Multi-Stage Fracture 2111.40 2111.50 0
2009-11-16 Multi-Stage Fracture 2003.60 2003.70 0
2009-11-16 Multi-Stage Fracture 1907.30 1907.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 8329 0.0 0.0 0.0
2011 8678 0.0 0.0 0.0
2012 8694 0.0 0.0 0.0
2013 8232 0.0 0.0 0.0
2014 8547 0.0 0.0 0.0
2015 144 0.0 0.0 0.0

For data sources see[6]

References