If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485050814020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.110214,"lon":-114.707337,"icon":""}]} |
| Location: 02/14-08-048-05W5/0 | |
| Location Alias: 02/14-08-48-05 W5M | |
| Location Alias 2: 02/14-08-048-05 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 05 | |
| Section: 08 | |
| County/Municipality: Brazeau County | |
| Well Name: BONTERRA 102 HZ PEMBINA 14-8-48-5 | |
| Operator Name: Bonterra Energy Corp. | |
| License Number: 0475573 | |
| License Date: 2015-06-01 | |
| License Status: Issued | |
| Spud Date: 2015-06-11 | |
| Final Drill Date: 2015-06-18 | |
| Well Total Depth: 4051.00 m | |
| Surface Hole Latitude: 53.110214 | |
| Surface Hole Longitude: -114.707337 |
| Date | Event |
|---|---|
| 2015-06-01 | Obtained License |
| 2015-06-12 | Surface Casing Operation Performed |
| 2015-06-13 | Direction Drilling Operation Performed - Deviate |
| 2015-06-14 | Direction Drilling Operation Performed - Horizontal |
| 2015-06-18 | Finished Drilling |
| 2015-06-19 | Production Casing Operation Performed |
| 2015-06-19 | Well Mode changed to Drilled and Cased |
| 2015-06-20 | Rig Released |
| 2015-07-03 | Well Log Performed |
| 2015-07-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-07-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-07-14 | Well Began Production |
| 2015-07-14 | Well Fluid changed to Crude Oil |
| 2015-07-14 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-06-11 | Ironhand Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-06-13 | 1056.90 | Deviate (5 - 79 degrees) |
| 2015-06-14 | 1695.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-07-08 | Multi-Stage Fracture | 4021.90 | 4023.40 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3517.00 | 3518.90 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3472.20 | 3474.00 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3413.90 | 3415.70 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3355.10 | 3357.00 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3298.10 | 3300.00 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3245.60 | 3247.40 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3188.60 | 3190.50 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3130.30 | 3132.20 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3072.20 | 3074.10 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3013.80 | 3015.70 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3979.30 | 3981.20 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2970.30 | 2972.20 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2914.10 | 2916.00 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2857.30 | 2859.20 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2801.60 | 2803.50 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2744.40 | 2746.30 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2687.80 | 2689.70 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2631.70 | 2633.60 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2574.10 | 2576.00 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2516.50 | 2518.40 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 2471.50 | 2473.40 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3923.50 | 3925.40 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 2416.60 | 2418.40 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 2362.00 | 2363.90 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 2303.70 | 2305.60 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 2245.90 | 2247.80 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 2187.80 | 2189.70 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 2131.30 | 2133.10 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 2073.20 | 2075.00 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 2015.00 | 2016.90 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 1971.80 | 1973.70 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 1913.70 | 1915.60 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3865.00 | 3866.90 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 1857.50 | 1859.40 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 1801.10 | 1803.00 | 0 |
| 2015-07-09 | Multi-Stage Fracture | 1742.70 | 1744.60 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3807.40 | 3809.30 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3749.00 | 3750.90 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3690.60 | 3692.40 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3633.60 | 3635.50 | 0 |
| 2015-07-08 | Multi-Stage Fracture | 3575.20 | 3577.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-07-08 | 2015-07-09 | 1,423 | 3,466 | N/A |
| 2 | 2015-07-08 | 2015-07-08 | 1,423 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 83.4976 | N/A | |||
| Sand - Tier 2 (20/40) | Trican | silica crystalline | 14808-60-7 | 100 | 11.3534 | N/A | ||
| Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 4.8035 | N/A | ||
| Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0106 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0106 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0106 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0106 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0106 | N/A | ||||
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1922 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1922 | N/A | ||||
| GNE-2 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0443 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.0443 | N/A | ||||
| FR-12 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0886 | N/A | |
| anionic polyacrylamide copolymer | 25987-30-8 | 100 | 0.0886 | N/A | ||||
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0886 | N/A | ||||
| 2 | Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 0.3962 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-07-07 | 2015-07-09 | Surface Water - Lake | 3706 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 3765 | 0.0 | 0.0 | 0.0 |
| 2016 | 8560 | 0.0 | 0.0 | 0.0 |
| 2017 | 8631 | 0.0 | 0.0 | 0.0 |
| 2018 | 8421 | 0.0 | 0.0 | 0.0 |
| 2019 | 8534 | 0.0 | 0.0 | 0.0 |
| 2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-06-20 | No Incident Encountered | 0.00 | 0.00 |
| 2015-07-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]