X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485043008030

Well Details

Well ID: 0485043008030
Loading map...
Location: 03/08-30-048-04W5/0
Location Alias: 03/08-30-48-04 W5M
Location Alias 2: 03/08-30-048-04 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 04
Section: 30
County/Municipality: Brazeau County
Well Name: JOURNEY 103 HZ PEMBINA 8-30-48-4
Operator Name: Journey Energy Inc.
License Number: 0459646
License Date: 2013-09-26
License Status: Amended
Spud Date: 2013-11-09
Final Drill Date: 2013-11-16
Well Total Depth: 2800.00 m
Surface Hole Latitude: 53.168306
Surface Hole Longitude: -114.587873

For data sources see[1][2]

Well History

Date Event
2013-09-26 Obtained License
2013-11-10 Surface Casing Operation Performed
2013-11-12 Direction Drilling Operation Performed - Deviate
2013-11-12 Direction Drilling Operation Performed - Horizontal
2013-11-16 Finished Drilling
2013-11-16 Well Mode changed to Drilled and Cased
2013-11-17 Production Casing Operation Performed
2013-11-18 Rig Released
2013-12-01 Perforation Treatment Performed - Open-Hole Completion
2013-12-05 Well Log Performed
2013-12-14 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-17 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-17 Well Began Production
2013-12-17 Well Fluid changed to Crude Oil
2013-12-17 Well Mode changed to Pumping
2013-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-20 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-11 Quintera Drilling Ltd. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-12 1100.90 Deviate (5 - 79 degrees)
2013-11-12 1375.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-12-01 Open Hole/Barefoot Completion 2765.60 2800.00 0
2013-12-19 Multi-Stage Fracture 2009.60 2010.10 0
2013-12-19 Multi-Stage Fracture 1938.80 1939.30 0
2013-12-19 Multi-Stage Fracture 1868.50 1869.00 0
2013-12-19 Multi-Stage Fracture 1796.00 1796.50 0
2013-12-19 Multi-Stage Fracture 1727.60 1728.10 0
2013-12-20 Multi-Stage Fracture 1657.10 1657.60 0
2013-12-20 Multi-Stage Fracture 1586.70 1587.20 0
2013-12-20 Multi-Stage Fracture 1516.30 1516.80 0
2013-12-20 Multi-Stage Fracture 1445.60 1446.10 0
2013-12-14 Multi-Stage Fracture 2758.50 2759.00 0
2013-12-17 Multi-Stage Fracture 2573.80 2574.30 0
2013-12-17 Multi-Stage Fracture 2503.30 2503.80 0
2013-12-17 Multi-Stage Fracture 2432.60 2433.10 0
2013-12-18 Multi-Stage Fracture 2362.10 2362.60 0
2013-12-19 Multi-Stage Fracture 2221.00 2221.50 0
2013-12-19 Multi-Stage Fracture 2150.50 2151.00 0
2013-12-19 Multi-Stage Fracture 2080.00 2080.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-14 2013-12-20 1,298 0 N/A
2 2013-12-20 2013-12-20 1,298 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 37.81 N/A
ClearFRAC XT:KCl Water; N002 Schlumberger Crystalline silica 14808-60-7 100 28.7057 N/A
ClearFRAC XT:KCl Water; N002 Schlumberger Energizing Fluid Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.0155 N/A
Nitrogen; liquid form 7727-37-9 100 33.4516 N/A
Polyvinyl acetate; partially hydrolyzed 304443-60-5 100 0 N/A
Propan-2-ol 67-63-0 100 0.0119 N/A
Sodium chloride 7647-14-5 100 0.0021 N/A
Sodium chloroacetate 3926-62-3 100 0.0002 N/A
2 ClearFRAC XT:KCl Water; N002 Schlumberger Energizing Fluid 2-butoxyethanol 111-76-2 100 0.0134 N/A
Butan-1-ol 71-36-3 100 0.0053 N/A
Ethane-1;2-diol 107-21-1 100 0.0001 N/A
Linear/branched c11 alcohol ethoxylate (3 eo) 127036-24-2 100 0.0046 N/A
Linear/branched c11 alcohol ethoxylate (8 eo) 127036-24-2 100 0.021 N/A
Undecanol; branched and linear (impurity) 128973-77-3 100 0.0013 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-12-07 2013-12-20 Central Water Distribution Facility 183
2013-12-08 2013-12-11 Central Water Distribution Facility 420

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 336 0.0 0.0 0.0
2014 8653 0.0 0.0 0.0
2015 8315 0.0 0.0 0.0
2016 8007 0.0 0.0 0.0
2017 6568 0.0 0.0 0.0
2018 5651 0.0 0.0 0.0
2019 7492 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-18 No Incident Encountered 0.00 0.00
2013-12-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References