If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0485043008030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.168306,"lon":-114.587873,"icon":""}]} |
| Location: 03/08-30-048-04W5/0 | |
| Location Alias: 03/08-30-48-04 W5M | |
| Location Alias 2: 03/08-30-048-04 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 30 | |
| County/Municipality: Brazeau County | |
| Well Name: JOURNEY 103 HZ PEMBINA 8-30-48-4 | |
| Operator Name: Journey Energy Inc. | |
| License Number: 0459646 | |
| License Date: 2013-09-26 | |
| License Status: Amended | |
| Spud Date: 2013-11-09 | |
| Final Drill Date: 2013-11-16 | |
| Well Total Depth: 2800.00 m | |
| Surface Hole Latitude: 53.168306 | |
| Surface Hole Longitude: -114.587873 |
| Date | Event |
|---|---|
| 2013-09-26 | Obtained License |
| 2013-11-10 | Surface Casing Operation Performed |
| 2013-11-12 | Direction Drilling Operation Performed - Deviate |
| 2013-11-12 | Direction Drilling Operation Performed - Horizontal |
| 2013-11-16 | Finished Drilling |
| 2013-11-16 | Well Mode changed to Drilled and Cased |
| 2013-11-17 | Production Casing Operation Performed |
| 2013-11-18 | Rig Released |
| 2013-12-01 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-12-05 | Well Log Performed |
| 2013-12-14 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-12-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-12-17 | Well Began Production |
| 2013-12-17 | Well Fluid changed to Crude Oil |
| 2013-12-17 | Well Mode changed to Pumping |
| 2013-12-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-12-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-12-20 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-11-11 | Quintera Drilling Ltd. | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-11-12 | 1100.90 | Deviate (5 - 79 degrees) |
| 2013-11-12 | 1375.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-12-01 | Open Hole/Barefoot Completion | 2765.60 | 2800.00 | 0 |
| 2013-12-19 | Multi-Stage Fracture | 2009.60 | 2010.10 | 0 |
| 2013-12-19 | Multi-Stage Fracture | 1938.80 | 1939.30 | 0 |
| 2013-12-19 | Multi-Stage Fracture | 1868.50 | 1869.00 | 0 |
| 2013-12-19 | Multi-Stage Fracture | 1796.00 | 1796.50 | 0 |
| 2013-12-19 | Multi-Stage Fracture | 1727.60 | 1728.10 | 0 |
| 2013-12-20 | Multi-Stage Fracture | 1657.10 | 1657.60 | 0 |
| 2013-12-20 | Multi-Stage Fracture | 1586.70 | 1587.20 | 0 |
| 2013-12-20 | Multi-Stage Fracture | 1516.30 | 1516.80 | 0 |
| 2013-12-20 | Multi-Stage Fracture | 1445.60 | 1446.10 | 0 |
| 2013-12-14 | Multi-Stage Fracture | 2758.50 | 2759.00 | 0 |
| 2013-12-17 | Multi-Stage Fracture | 2573.80 | 2574.30 | 0 |
| 2013-12-17 | Multi-Stage Fracture | 2503.30 | 2503.80 | 0 |
| 2013-12-17 | Multi-Stage Fracture | 2432.60 | 2433.10 | 0 |
| 2013-12-18 | Multi-Stage Fracture | 2362.10 | 2362.60 | 0 |
| 2013-12-19 | Multi-Stage Fracture | 2221.00 | 2221.50 | 0 |
| 2013-12-19 | Multi-Stage Fracture | 2150.50 | 2151.00 | 0 |
| 2013-12-19 | Multi-Stage Fracture | 2080.00 | 2080.50 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-12-14 | 2013-12-20 | 1,298 | 0 | N/A |
| 2 | 2013-12-20 | 2013-12-20 | 1,298 | 0 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water (Including Mix Water Supplied by Client)* | Not Available | 100 | 37.81 | N/A | |||
| ClearFRAC XT:KCl Water; N002 | Schlumberger | Crystalline silica | 14808-60-7 | 100 | 28.7057 | N/A | ||
| ClearFRAC XT:KCl Water; N002 | Schlumberger | Energizing Fluid | Erucic amidopropyl dimethyl betaine | 149879-98-1 | 100 | 0.0155 | N/A | |
| Nitrogen; liquid form | 7727-37-9 | 100 | 33.4516 | N/A | ||||
| Polyvinyl acetate; partially hydrolyzed | 304443-60-5 | 100 | 0 | N/A | ||||
| Propan-2-ol | 67-63-0 | 100 | 0.0119 | N/A | ||||
| Sodium chloride | 7647-14-5 | 100 | 0.0021 | N/A | ||||
| Sodium chloroacetate | 3926-62-3 | 100 | 0.0002 | N/A | ||||
| 2 | ClearFRAC XT:KCl Water; N002 | Schlumberger | Energizing Fluid | 2-butoxyethanol | 111-76-2 | 100 | 0.0134 | N/A |
| Butan-1-ol | 71-36-3 | 100 | 0.0053 | N/A | ||||
| Ethane-1;2-diol | 107-21-1 | 100 | 0.0001 | N/A | ||||
| Linear/branched c11 alcohol ethoxylate (3 eo) | 127036-24-2 | 100 | 0.0046 | N/A | ||||
| Linear/branched c11 alcohol ethoxylate (8 eo) | 127036-24-2 | 100 | 0.021 | N/A | ||||
| Undecanol; branched and linear (impurity) | 128973-77-3 | 100 | 0.0013 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-12-07 | 2013-12-20 | Central Water Distribution Facility | 183 |
| 2013-12-08 | 2013-12-11 | Central Water Distribution Facility | 420 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 336 | 0.0 | 0.0 | 0.0 |
| 2014 | 8653 | 0.0 | 0.0 | 0.0 |
| 2015 | 8315 | 0.0 | 0.0 | 0.0 |
| 2016 | 8007 | 0.0 | 0.0 | 0.0 |
| 2017 | 6568 | 0.0 | 0.0 | 0.0 |
| 2018 | 5651 | 0.0 | 0.0 | 0.0 |
| 2019 | 7492 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-11-18 | No Incident Encountered | 0.00 | 0.00 |
| 2013-12-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]