X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485041108000

Well Details

Well ID: 0485041108000
Loading map...
Location: 00/08-11-048-04W5/0
Location Alias: 00/08-11-48-04 W5M
Location Alias 2: 00/08-11-048-04 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 04
Section: 11
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 8-11-48-4
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0026267
License Date: 1964-06-15
License Status: Suspension
Spud Date: 1964-06-18
Final Drill Date: 1964-06-23
Well Total Depth: 1027.20 m
Surface Hole Latitude: 53.125093
Surface Hole Longitude: -114.468003

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-06-15 Obtained License
1964-06-23 Finished Drilling
1964-06-23 Well Mode changed to Drilled and Cased
1964-06-24 Drill Stem Test Performed
1964-06-25 Production Casing Operation Performed
1964-07-03 Perforation Treatment Performed - Jet Perforation
1964-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-07-04 Perforation Treatment Performed - Fractured
1964-07-20 Well Began Production
1964-07-20 Well Fluid changed to Crude Oil
1964-07-20 Well Mode changed to Pumping
1989-08-30 Perforation Treatment Performed - Jet Perforation
1989-08-30 Well Log Performed
2007-04-01 Well Fluid changed to Crude Oil
2007-04-01 Well Mode changed to Suspended
2008-03-16 Well Log Performed
2008-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-03-21 Plug Back Performed
2008-03-21 Well Fluid changed to Crude Oil
2008-03-21 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-07-03 Perforation 1001.60 1003.40 7
1964-07-03 Perforation 1005.50 1007.10 7
1964-07-04 Acid Treatment 1001.60 1007.10 0
1964-07-04 Fracture 1001.60 1007.10 0
1989-08-30 Perforation 1001.20 1003.40 13
1989-08-30 Perforation 1005.20 1007.70 13
2008-03-21 Packing Device Capped w/Cement 986.80 994.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7623 0.0 0.0 0.0
1968 7724 0.0 0.0 0.0
1969 7215 0.0 0.0 0.0
1970 5352 0.0 0.0 0.0
1971 7896 0.0 0.0 0.0
1972 8086 0.0 0.0 0.0
1973 8685 0.0 0.0 0.0
1974 8321 0.0 0.0 0.0
1975 8196 0.0 0.0 0.0
1976 8294 0.0 0.0 0.0
1977 8722 0.0 0.0 0.0
1978 8212 0.0 0.0 0.0
1979 8601 0.0 0.0 0.0
1980 8094 0.0 0.0 0.0
1981 7732 0.0 0.0 0.0
1982 7220 0.0 0.0 0.0
1983 8018 0.0 0.0 0.0
1984 8756 0.0 0.0 0.0
1985 8458 0.0 0.0 0.0
1986 8712 0.0 0.0 0.0
1987 8643 0.0 0.0 0.0
1988 8723 0.0 0.0 0.0
1989 3472 0.0 0.0 0.0
1990 8667 0.0 0.0 0.0
1991 8695 0.0 0.0 0.0
1992 8733 0.0 0.0 0.0
1993 8428 0.0 0.0 0.0
1994 8730 0.0 0.0 0.0
1995 8320 0.0 0.0 0.0
1996 8711 0.0 0.0 0.0
1997 8759 0.0 0.0 0.0
1998 8546 0.0 0.0 0.0
1999 8116 0.0 0.0 0.0
2000 8743 0.0 0.0 0.0
2001 8000 0.0 0.0 0.0
2002 8693 0.0 0.0 0.0
2003 8639 0.0 0.0 0.0
2004 8543 0.0 0.0 0.0
2005 8327 0.0 0.0 0.0
2006 7415 0.0 0.0 0.0

For data sources see[5]

References