X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485041106000

Well Details

Well ID: 0485041106000
Loading map...
Location: 00/06-11-048-04W5/0
Location Alias: 00/06-11-48-04 W5M
Location Alias 2: 00/06-11-048-04 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 04
Section: 11
County/Municipality: Brazeau County
Well Name: PEMBINA ET AL PEMBINA 6-11-48-4
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0026501
License Date: 1964-07-15
License Status: RecCertified
Spud Date: 1964-10-23
Final Drill Date: 1964-10-30
Well Total Depth: 1016.50 m
Surface Hole Latitude: 53.124375
Surface Hole Longitude: -114.478799

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-07-15 Obtained License
1964-10-29 Drill Stem Test Performed
1964-10-30 Finished Drilling
1964-10-30 Well Mode changed to Drilled and Cased
1964-10-31 Production Casing Operation Performed
1964-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-07 Perforation Treatment Performed - Fractured
1964-11-07 Perforation Treatment Performed - Selective Jet Perforations
1964-12-20 Well Began Production
1964-12-20 Well Fluid changed to Crude Oil
1964-12-20 Well Mode changed to Pumping
1978-12-14 Well Began Injection
1978-12-14 Well Fluid changed to Water
1978-12-14 Well Type changed to Injection
1993-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-19 Perforation Treatment Performed - Jet Perforation
1993-09-19 Plug Back Performed
1993-09-19 Well Fluid changed to Water
1993-09-19 Well Log Performed
1993-09-19 Well Mode changed to Abandoned
1993-09-19 Well Type changed to Injection
1993-09-20 Perforation Treatment Performed - Remedial Casing
1993-09-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-11-07 Selective Jet Perforations 993.60 994.00 3
1993-09-20 Remedial Casing Cementing 320.00 321.00 0
1964-11-07 Selective Jet Perforations 994.30 995.80 3
1964-11-07 Selective Jet Perforations 996.10 996.40 3
1964-11-07 Selective Jet Perforations 998.50 998.80 3
1964-11-07 Selective Jet Perforations 999.10 999.10 3
1964-11-07 Acid Treatment 993.60 999.10 0
1964-11-07 Fracture 993.60 999.10 0
1993-09-19 Packing Device Capped w/Cement 978.00 986.00 0
1993-09-19 Perforation 320.00 321.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 6431 0.0 0.0 0.0
1969 7752 0.0 0.0 0.0
1970 8447 0.0 0.0 0.0
1971 8735 0.0 0.0 0.0
1972 8506 0.0 0.0 0.0
1973 8501 0.0 0.0 0.0
1974 8709 0.0 0.0 0.0
1975 7507 0.0 0.0 0.0
1976 8031 0.0 0.0 0.0
1977 1470 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0

For data sources see[5]

References