X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485040216020

Well Details

Well ID: 0485040216020
Loading map...
Location: 02/16-02-048-04W5/0
Location Alias: 02/16-02-48-04 W5M
Location Alias 2: 02/16-02-048-04 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 04
Section: 02
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 16-2-48-4
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0413015
License Date: 2009-10-09
License Status: Issued
Spud Date: 2009-11-12
Final Drill Date: 2009-11-23
Well Total Depth: 2644.00 m
Surface Hole Latitude: 53.121359
Surface Hole Longitude: -114.485942

For data sources see[1][2]

Well History

Date Event
2009-10-09 Obtained License
2009-11-14 Surface Casing Operation Performed
2009-11-16 Direction Drilling Operation Performed - Deviate
2009-11-17 Direction Drilling Operation Performed - Horizontal
2009-11-19 Intermediate Casing Operation Performed
2009-11-23 Finished Drilling
2009-11-23 Well Mode changed to Drilled and Cased
2009-11-24 Well Log Performed
2009-11-25 Liner Casing Operation Performed
2009-11-26 Rig Released
2009-12-02 Perforation Treatment Performed - Multi-Stage Fracture
2009-12-02 Perforation Treatment Performed - Open-Hole Completion
2010-02-01 Well Began Production
2010-02-01 Well Fluid changed to Crude Oil
2010-02-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-11-16 1052.00 Deviate (5 - 79 degrees)
2009-11-17 1483.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-12-02 Open Hole/Barefoot Completion 2624.00 2644.00 0
2009-12-02 Multi-Stage Fracture 1786.30 1786.40 0
2009-12-02 Multi-Stage Fracture 1690.50 1690.60 0
2009-12-02 Multi-Stage Fracture 1595.30 1595.40 0
2009-12-02 Multi-Stage Fracture 2575.90 2576.00 0
2009-12-02 Multi-Stage Fracture 2458.60 2458.70 0
2009-12-02 Multi-Stage Fracture 2362.10 2362.20 0
2009-12-02 Multi-Stage Fracture 2266.20 2266.30 0
2009-12-02 Multi-Stage Fracture 2170.20 2170.30 0
2009-12-02 Multi-Stage Fracture 2074.10 2074.20 0
2009-12-02 Multi-Stage Fracture 1978.00 1978.10 0
2009-12-02 Multi-Stage Fracture 1882.30 1882.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 7650 0.0 0.0 0.0
2011 7931 0.0 0.0 0.0
2012 7709 0.0 0.0 0.0
2013 2544 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8734 0.0 0.0 0.0
2016 8664 0.0 0.0 0.0
2017 8740 0.0 0.0 0.0
2018 8568 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[6]

References