X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485031506002

Well Details

Well ID: 0485031506002
Loading map...
Location: 00/06-15-048-03W5/2
Location Alias: 00/06-15-48-03 W5M
Location Alias 2: 00/06-15-048-03 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 15
County/Municipality: Leduc County
Well Name: DAYLIGHT PEMBINA 6-15-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0017376
License Date: 1959-07-07
License Status: Issued
Spud Date: 1959-07-15
Final Drill Date: 1959-09-14
Well Total Depth: 2674.60 m
Surface Hole Latitude: 53.139642
Surface Hole Longitude: -114.358116

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-07-07 Obtained License
1959-07-26 Drill Stem Test Performed
1959-08-03 Drill Stem Test Performed
1959-08-05 Production Casing Operation Performed
1959-09-14 Finished Drilling
1959-09-14 Well Mode changed to Drilled and Cased
1959-09-21 Perforation Treatment Performed - Bullet Perforation
1959-09-22 Perforation Treatment Performed - Cement Squeeze
1959-09-24 Perforation Treatment Performed - Cement Squeeze
1959-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-10-12 Perforation Treatment Performed - Bullet Perforation
1959-10-20 Perforation Treatment Performed - Fractured
1960-12-20 Perforation Treatment Performed - Jet Perforation
1960-12-21 Perforation Treatment Performed - Fractured
1961-02-13 Well Began Production
1961-02-13 Well Fluid changed to Crude Oil
1961-02-13 Well Mode changed to Flowing
1967-02-02 Well Fluid changed to Crude Oil
1967-02-02 Well Mode changed to Pumping
1970-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-06-01 Well Fluid changed to Crude Oil
1972-06-01 Well Mode changed to Suspended
1982-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-09-09 Plug Back Performed
1982-09-09 Well Fluid changed to Crude Oil
1982-09-09 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-09-21 Bullet Perforation 990.30 990.60 13
1970-02-23 Acid Treatment 966.20 967.70 0
1982-09-09 Packing Device Capped w/Cement 1214.00 1249.70 0
1959-09-21 Bullet Perforation 966.20 967.70 7
1959-09-22 Cement Squeeze 990.30 990.60 0
1959-09-24 Cement Squeeze 966.20 967.70 0
1959-10-12 Bullet Perforation 966.20 967.70 13
1959-10-12 Acid Treatment 966.20 967.70 0
1959-10-20 Fracture 966.20 967.70 0
1960-12-20 Perforation 1261.30 1263.10 13
1960-12-21 Fracture 1261.30 1263.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 6804 0.0 0.0 0.0
1968 8759 0.0 0.0 0.0
1969 8643 0.0 0.0 0.0
1970 6576 0.0 0.0 0.0
1971 1776 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-06-26 No Incident Encountered 0.00 0.00

For data sources see[6]

References