X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485031008020

Well Details

Well ID: 0485031008020
Loading map...
Location: 02/08-10-048-03W5/0
Location Alias: 02/08-10-48-03 W5M
Location Alias 2: 02/08-10-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 10
County/Municipality: Leduc County
Well Name: TALISMAN PEM 8-10-48-3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0035502
License Date: 1968-12-23
License Status: RecCertified
Spud Date: 1969-01-03
Final Drill Date: 1969-01-08
Well Total Depth: 1278.60 m
Surface Hole Latitude: 53.125531
Surface Hole Longitude: -114.345238

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-12-23 Obtained License
1969-01-08 Finished Drilling
1969-01-08 Well Mode changed to Drilled and Cased
1969-01-10 Production Casing Operation Performed
1969-02-03 Perforation Treatment Performed - Selective Jet Perforations
1969-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-05 Perforation Treatment Performed - Fractured
1969-02-13 Well Began Production
1969-02-13 Well Fluid changed to Crude Oil
1969-02-13 Well Mode changed to Pumping
1975-12-08 Well Fluid changed to Crude Oil
1975-12-08 Well Mode changed to Suspended
1995-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-02 Perforation Treatment Performed - Jet Perforation
1995-02-02 Plug Back Performed
1995-02-03 Perforation Treatment Performed - Remedial Casing
1995-02-03 Well Fluid changed to Crude Oil
1995-02-03 Well Mode changed to Abandoned
1995-02-04 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-02-03 Selective Jet Perforations 1268.60 1269.20 0
1969-02-03 Selective Jet Perforations 1270.40 1271.00 0
1969-02-05 Acid Treatment 1268.60 1271.00 0
1969-02-05 Fracture 1268.60 1271.00 0
1995-02-02 Packing Device Capped w/Cement 1252.00 1260.00 0
1995-02-02 Perforation 249.00 249.50 13
1995-02-03 Remedial Casing Cementing 249.00 249.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 7119 0.0 0.0 0.0
1970 6648 0.0 0.0 0.0
1971 8626 0.0 0.0 0.0
1972 8471 0.0 0.0 0.0
1973 6911 0.0 0.0 0.0
1974 576 0.0 0.0 0.0
1975 588 0.0 0.0 0.0

For data sources see[5]

References