X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485031007030

Well Details

Well ID: 0485031007030
Loading map...
Location: 03/07-10-048-03W5/0
Location Alias: 03/07-10-48-03 W5M
Location Alias 2: 03/07-10-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 10
County/Municipality: Leduc County
Well Name: PRIMEWEST 103 PEMBINA 7-10-48-3
Operator Name: TAQA North Ltd.
License Number: 0259370
License Date: 2001-09-10
License Status: RecCertified
Spud Date: 2001-09-26
Final Drill Date: 2001-10-05
Well Total Depth: 1815.00 m
Surface Hole Latitude: 53.126420
Surface Hole Longitude: -114.351298

For data sources see[1][2]

Well History

Date Event
2001-09-10 Obtained License
2001-09-26 Direction Drilling Operation Performed - Deviate
2001-09-28 Surface Casing Operation Performed
2001-10-05 Finished Drilling
2001-10-05 Well Log Performed
2001-10-06 Production Casing Operation Performed
2001-10-07 Rig Released
2001-10-07 Well Mode changed to Drilled and Cased
2001-10-17 Perforation Treatment Performed - Jet Perforation
2001-10-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-22 Well Log Performed
2001-10-23 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-10-23 Perforation Treatment Performed - Jet Perforation
2001-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-26 Plug Back Performed
2001-10-26 Well Log Performed
2001-11-08 Well Abandoned
2001-11-08 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2001-09-26 1290.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-10-17 Perforation 1778.00 1785.50 17
2001-10-19 Acid Treatment 1778.00 1785.50 0
2001-10-23 Bridge Plug, No Cement 1775.70 1776.30 0
2001-10-23 Bridge Plug, No Cement 1775.70 1776.30 0
2001-10-23 Perforation 1763.00 1764.00 17
2001-10-24 Acid Treatment 1763.00 1764.50 0
2001-10-26 Packing Device Capped w/Cement 1751.00 1759.00 0

For data sources see[5]



References