X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030906002

Well Details

Well ID: 0485030906002
Loading map...
Location: 00/06-09-048-03W5/2
Location Alias: 00/06-09-48-03 W5M
Location Alias 2: 00/06-09-048-03 W5/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 09
County/Municipality: Brazeau County
Well Name: DAYLIGHT PEMBINA 6-9-48-3
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0016767
License Date: 1959-02-24
License Status: Suspension
Spud Date: 1959-02-26
Final Drill Date: 1959-03-04
Well Total Depth: 1274.10 m
Surface Hole Latitude: 53.125021
Surface Hole Longitude: -114.382428

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-02-24 Obtained License
1959-03-04 Finished Drilling
1959-03-04 Well Mode changed to Drilled and Cased
1959-03-05 Production Casing Operation Performed
1959-03-09 Perforation Treatment Performed - Acid Wash - No Pressure
1959-03-09 Perforation Treatment Performed - Fractured
1959-03-09 Perforation Treatment Performed - Jet Perforation
1959-08-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1959-08-07 Perforation Treatment Performed - Bullet Perforation
1959-08-07 Perforation Treatment Performed - Fractured
1959-08-11 Well Began Production
1959-08-11 Well Fluid changed to Crude Oil
1959-08-11 Well Mode changed to Pumping
1972-11-17 Well Began Injection
1972-11-17 Well Fluid changed to Water
1972-11-17 Well Type changed to Injection
1974-01-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-01-23 Perforation Treatment Performed - Jet Perforation
2014-07-01 Well Fluid changed to Water
2014-07-01 Well Mode changed to Suspended
2014-07-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-03-09 Perforation 1247.20 1252.10 13
1974-01-23 Acid Treatment 939.70 946.70 0
1959-03-09 Acid Wash 1247.20 1252.10 0
1959-03-09 Fracture 1247.20 1252.10 0
1959-08-07 Packing Device Capped w/Cement 1242.10 1242.10 0
1959-08-07 Bullet Perforation 945.20 946.70 13
1959-08-07 Acid Treatment 945.20 946.70 0
1959-08-07 Fracture 945.20 946.70 0
1974-01-23 Perforation 939.70 940.00 13
1974-01-23 Perforation 943.40 944.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1813 0.0 0.0 0.0
1968 936 0.0 0.0 0.0
1970 4155 0.0 0.0 0.0
1971 8586 0.0 0.0 0.0
1972 3228 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0

For data sources see[5]

References