X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030711000

Well Details

Well ID: 0485030711000
Loading map...
Location: 00/11-07-048-03W5/0
Location Alias: 00/11-07-48-03 W5M
Location Alias 2: 00/11-07-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 07
County/Municipality: Leduc County
Well Name: SPARTAN OIL PEMBINA 11-7-48-3
Operator Name: Bonterra Energy Corp.
License Number: 0445911
License Date: 2012-05-16
License Status: Issued
Spud Date: 2012-06-29
Final Drill Date: 2012-07-06
Well Total Depth: 3378.00 m
Surface Hole Latitude: 53.148071
Surface Hole Longitude: -114.436833

For data sources see[1][2]

Well History

Date Event
2012-05-16 Obtained License
2012-06-30 Surface Casing Operation Performed
2012-07-01 Direction Drilling Operation Performed - Horizontal
2012-07-06 Finished Drilling
2012-07-06 Well Mode changed to Drilled and Cased
2012-07-08 Liner Casing Operation Performed
2012-07-08 Production Casing Operation Performed
2012-07-08 Rig Released
2012-08-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-16 Well Began Production
2012-08-16 Well Fluid changed to Crude Oil
2012-08-16 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-29 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-01 978.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-08 Multi-Stage Fracture 3294.60 3378.00 0
2012-08-08 Multi-Stage Fracture 2560.80 2646.90 0
2012-08-08 Multi-Stage Fracture 2476.50 2560.80 0
2012-08-08 Multi-Stage Fracture 2390.60 2476.50 0
2012-08-08 Multi-Stage Fracture 2318.20 2390.60 0
2012-08-08 Multi-Stage Fracture 2232.20 2318.20 0
2012-08-08 Multi-Stage Fracture 2146.60 2232.20 0
2012-08-08 Multi-Stage Fracture 2073.70 2146.60 0
2012-08-09 Multi-Stage Fracture 1987.40 2073.70 0
2012-08-09 Multi-Stage Fracture 1901.00 1987.40 0
2012-08-09 Multi-Stage Fracture 1828.50 1901.00 0
2012-08-08 Multi-Stage Fracture 3221.80 3294.60 0
2012-08-09 Multi-Stage Fracture 1742.30 1828.50 0
2012-08-09 Multi-Stage Fracture 1656.20 1742.30 0
2012-08-09 Multi-Stage Fracture 1569.80 1656.20 0
2012-08-09 Multi-Stage Fracture 1497.10 1569.80 0
2012-08-09 Multi-Stage Fracture 1437.60 1497.10 0
2012-08-08 Multi-Stage Fracture 3135.40 3221.80 0
2012-08-08 Multi-Stage Fracture 3049.40 3135.40 0
2012-08-08 Multi-Stage Fracture 2976.90 3049.40 0
2012-08-08 Multi-Stage Fracture 2891.60 2976.90 0
2012-08-08 Multi-Stage Fracture 2805.80 2891.60 0
2012-08-08 Multi-Stage Fracture 2719.60 2805.80 0
2012-08-08 Multi-Stage Fracture 2646.90 2719.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2268 0.0 0.0 0.0
2013 7796 0.0 0.0 0.0
2014 8508 0.0 0.0 0.0
2015 8593 0.0 0.0 0.0
2016 7694 0.0 0.0 0.0
2017 8241 0.0 0.0 0.0
2018 8336 0.0 0.0 0.0
2019 8294 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-08 No Incident Encountered 0.00 0.00
2012-08-18 No Incident Encountered 0.00 0.00

For data sources see[8]

References