X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0485030608020

Well Details

Well ID: 0485030608020
Loading map...
Location: 02/08-06-048-03W5/0
Location Alias: 02/08-06-48-03 W5M
Location Alias 2: 02/08-06-048-03 W5/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 5
Range: 03
Section: 06
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 8-6-48-3
Operator Name: Ridgeback Resources Inc.
License Number: 0418134
License Date: 2010-01-29
License Status: Issued
Spud Date: 2010-02-08
Final Drill Date: 2010-02-16
Well Total Depth: 2628.00 m
Surface Hole Latitude: 53.111728
Surface Hole Longitude: -114.437349

For data sources see[1][2]

Well History

Date Event
2010-01-29 Obtained License
2010-02-09 Surface Casing Operation Performed
2010-02-11 Direction Drilling Operation Performed - Horizontal
2010-02-12 Intermediate Casing Operation Performed
2010-02-16 Finished Drilling
2010-02-16 Well Mode changed to Drilled and Cased
2010-02-17 Liner Casing Operation Performed
2010-02-18 Perforation Treatment Performed - Open-Hole Completion
2010-02-18 Rig Released
2010-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-01 Well Began Production
2010-04-01 Well Fluid changed to Crude Oil
2010-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-02-11 1080.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-18 Open Hole/Barefoot Completion 2624.40 2628.00 0
2010-03-01 Multi-Stage Fracture 1996.00 1996.10 0
2010-03-01 Multi-Stage Fracture 1913.00 1913.10 0
2010-03-01 Multi-Stage Fracture 1843.00 1843.10 0
2010-03-01 Multi-Stage Fracture 1760.00 1760.10 0
2010-03-01 Multi-Stage Fracture 1677.00 1677.10 0
2010-03-01 Multi-Stage Fracture 1594.00 1594.10 0
2010-03-01 Multi-Stage Fracture 1523.00 1523.10 0
2010-03-01 Multi-Stage Fracture 2620.00 2620.10 0
2010-03-01 Multi-Stage Fracture 2562.00 2562.10 0
2010-03-01 Multi-Stage Fracture 2479.00 2479.10 0
2010-03-01 Multi-Stage Fracture 2396.00 2396.10 0
2010-03-01 Multi-Stage Fracture 2314.00 2314.10 0
2010-03-01 Multi-Stage Fracture 2244.00 2244.10 0
2010-03-01 Multi-Stage Fracture 2162.00 2162.10 0
2010-03-01 Multi-Stage Fracture 2079.00 2079.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 4457 0.0 0.0 0.0
2011 8545 0.0 0.0 0.0
2012 8763 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8665 0.0 0.0 0.0
2015 8740 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 8463 0.0 0.0 0.0
2018 7973 0.0 0.0 0.0
2019 8585 0.0 0.0 0.0
2020 1940 0.0 0.0 0.0

For data sources see[6]

References