If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0485030206020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.110137,"lon":-114.334481,"icon":""}]} |
Location: 02/06-02-048-03W5/0 | |
Location Alias: 02/06-02-48-03 W5M | |
Location Alias 2: 02/06-02-048-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 5 | |
Range: 03 | |
Section: 02 | |
County/Municipality: Leduc County | |
Well Name: DAYLIGHT PEMBINA 6-2-48-3 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0131873 | |
License Date: 1988-02-02 | |
License Status: RecCertified | |
Spud Date: 1988-02-25 | |
Final Drill Date: 1988-02-28 | |
Well Total Depth: 1022.00 m | |
Surface Hole Latitude: 53.110137 | |
Surface Hole Longitude: -114.334481 |
Date | Event |
---|---|
1988-02-02 | Obtained License |
1988-02-26 | Surface Casing Operation Performed |
1988-02-28 | Finished Drilling |
1988-02-28 | Well Mode changed to Drilled and Cased |
1988-02-29 | Well Log Performed |
1988-03-01 | Drill Stem Test Performed |
1988-03-02 | Production Casing Operation Performed |
1988-03-02 | Rig Released |
1988-05-20 | Perforation Treatment Performed - Jet Perforation |
1988-05-20 | Well Log Performed |
1988-05-21 | Perforation Treatment Performed - Fractured |
1988-06-05 | Well Began Production |
1988-06-05 | Well Fluid changed to Crude Oil |
1988-06-05 | Well Mode changed to Pumping |
1999-10-16 | Well Fluid changed to Crude Oil |
1999-10-16 | Well Mode changed to Suspended |
2003-11-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-11-04 | Plug Back Performed |
2003-11-04 | Well Fluid changed to Crude Oil |
2003-11-04 | Well Log Performed |
2003-11-04 | Well Mode changed to Abandoned Zone |
2003-11-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-11-05 | Perforation Treatment Performed - Jet Perforation |
2003-11-05 | Perforation Treatment Performed - Remedial Casing |
2003-11-05 | Plug Back Performed |
2003-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-11-06 | Perforation Treatment Performed - Jet Perforation |
2003-11-06 | Perforation Treatment Performed - Remedial Casing |
2003-11-06 | Plug Back Performed |
2003-11-06 | Well Log Performed |
2003-11-07 | Well Abandoned |
2003-11-07 | Well Fluid changed to Crude Oil |
2003-11-07 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-05-20 | Perforation | 979.00 | 984.50 | 7 |
2003-11-06 | Perforation | 373.00 | 374.00 | 14 |
2003-11-06 | Packing Device Capped w/Cement | 330.00 | 369.00 | 0 |
2003-11-06 | Perforation | 308.00 | 309.00 | 14 |
2003-11-06 | Remedial Casing Cementing | 308.00 | 309.00 | 0 |
2003-11-06 | Packing Device Capped w/Cement | 292.00 | 303.90 | 0 |
2003-11-06 | Perforation | 277.00 | 278.00 | 14 |
2003-11-06 | Packing Device Capped w/Cement | 190.00 | 269.00 | 0 |
1988-05-21 | Fracture | 979.00 | 984.50 | 0 |
2003-11-04 | Packing Device Capped w/Cement | 962.00 | 970.00 | 0 |
2003-11-05 | Perforation | 495.00 | 496.00 | 14 |
2003-11-05 | Remedial Casing Cementing | 495.00 | 496.00 | 0 |
2003-11-05 | Packing Device Capped w/Cement | 443.00 | 490.00 | 0 |
2003-11-05 | Perforation | 423.00 | 424.00 | 14 |
2003-11-05 | Remedial Casing Cementing | 423.00 | 424.00 | 0 |
2003-11-05 | Packing Device Capped w/Cement | 407.00 | 416.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 2531 | 0.0 | 0.0 | 0.0 |
1989 | 2549 | 0.0 | 0.0 | 0.0 |
1990 | 3122 | 0.0 | 0.0 | 0.0 |
1991 | 3612 | 0.0 | 0.0 | 0.0 |
1992 | 5905 | 0.0 | 0.0 | 0.0 |
1993 | 8271 | 0.0 | 0.0 | 0.0 |
1994 | 8271 | 0.0 | 0.0 | 0.0 |
1995 | 8381 | 0.0 | 0.0 | 0.0 |
1996 | 8575 | 0.0 | 0.0 | 0.0 |
1997 | 8650 | 0.0 | 0.0 | 0.0 |
1998 | 8508 | 0.0 | 0.0 | 0.0 |
1999 | 6849 | 0.0 | 0.0 | 0.0 |
For data sources see[5]