X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272802000

Well Details

Well ID: 0484272802000
Loading map...
Location: 00/02-28-048-27W4/0
Location Alias: 00/02-28-48-27 W4M
Location Alias 2: 00/02-28-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 28
County/Municipality: Leduc County
Well Name: ESSO E2 WIZARD IN 2-28-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0008581
License Date: 1954-10-15
License Status: Abandoned
Spud Date: 1954-10-15
Final Drill Date: 1954-11-19
Well Total Depth: 2033.60 m
Surface Hole Latitude: 53.165164
Surface Hole Longitude: -113.887615

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1954-10-15 Obtained License
1954-11-17 Drill Stem Test Performed
1954-11-18 Drill Stem Test Performed
1954-11-19 Drill Stem Test Performed
1954-11-19 Finished Drilling
1954-11-19 Well Mode changed to Drilled and Cased
1954-11-20 Production Casing Operation Performed
1954-11-23 Perforation Treatment Performed - Bullet Perforation
1954-11-23 Perforation Treatment Performed - Jet Perforation
1954-11-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-09-05 Perforation Treatment Performed - Bullet Perforation
1955-09-05 Perforation Treatment Performed - Fractured
1955-09-10 Perforation Treatment Performed - Open-Hole Completion
1955-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-09-27 Well Began Injection
1955-09-27 Well Fluid changed to Water
1955-09-27 Well Type changed to Disposal
1956-04-21 Perforation Treatment Performed - Acid Wash - No Pressure
1956-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-07-13 Perforation Treatment Performed - Jet Perforation
1966-07-13 Well Fluid changed to Water
1966-07-13 Well Mode changed to Abandoned Zone
1966-07-13 Well Type changed to Disposal
1966-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-06-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-18 Plug Back Performed
1988-10-18 Well Abandoned
1988-10-18 Well Log Performed
1988-10-19 Perforation Treatment Performed - Cement Plug
1988-10-19 Plug Back Performed
2011-01-31 Well Log Performed
2011-02-01 Perforation Treatment Performed - Jet Perforation
2011-02-09 Well Log Performed
2011-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-10 Perforation Treatment Performed - Jet Perforation
2011-02-10 Perforation Treatment Performed - Remedial Casing
2011-02-10 Plug Back Performed
2011-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-11 Perforation Treatment Performed - Remedial Casing
2011-02-12 Perforation Treatment Performed - Jet Perforation
2011-02-12 Well Log Performed
2011-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-02-13 Perforation Treatment Performed - Cement Plug
2011-02-13 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-11-23 Bullet Perforation 1999.20 2000.40 13
1966-07-13 Packing Device Capped w/Cement 1798.00 1805.60 0
1966-07-13 Perforation 1758.40 1760.20 3
1966-07-13 Perforation 1762.70 1764.50 3
1966-07-13 Perforation 1769.70 1770.60 3
1966-07-14 Acid Treatment 1758.40 1770.60 0
1970-06-18 Acid Treatment 1758.40 1770.60 0
1970-07-17 Acid Treatment 1758.40 1770.60 0
1971-07-16 Acid Treatment 1758.40 1770.60 0
1988-10-18 Packing Device Capped w/Cement 1741.00 1753.00 0
1988-10-19 Cement Plug 1343.00 1391.00 0
1954-11-23 Perforation 1999.20 2000.40 13
2011-02-01 Perforation 715.00 716.00 17
2011-02-10 Remedial Casing Cementing 715.00 716.00 0
2011-02-10 Packing Device Capped w/Cement 697.50 705.50 0
2011-02-10 Perforation 440.00 441.00 17
2011-02-11 Remedial Casing Cementing 440.00 441.00 0
2011-02-11 Packing Device Capped w/Cement 423.00 431.00 0
2011-02-12 Perforation 389.00 390.00 17
2011-02-12 Perforation 365.00 366.00 17
2011-02-12 Perforation 305.00 306.00 17
2011-02-12 Perforation 247.00 248.00 17
1954-11-29 Acid Treatment 1999.20 2000.40 0
2011-02-12 Perforation 210.00 211.00 17
2011-02-12 Perforation 199.00 200.00 17
2011-02-13 Remedial Casing Cementing 199.00 390.00 0
2011-02-13 Cement Plug 199.00 422.00 0
2011-02-13 Packing Device Capped w/Cement 182.00 190.00 0
1955-09-05 Bullet Perforation 1999.20 2000.40 13
1955-09-05 Fracture 1999.20 2000.40 0
1955-09-10 Open Hole/Barefoot Completion 2018.10 2033.60 0
1955-09-27 Acid Treatment 2018.10 2033.60 0
1956-04-21 Acid Wash 2018.10 2033.60 0
1956-12-11 Acid Treatment 2018.10 2033.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References