X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484272703000

Well Details

Well ID: 0484272703000
Loading map...
Location: 00/03-27-048-27W4/0
Location Alias: 00/03-27-48-27 W4M
Location Alias 2: 00/03-27-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 27
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE C.P.R. NO. E-1
Operator Name: Imperial Oil Resources Limited
License Number: 0004518
License Date: 1952-04-17
License Status: Abandoned
Spud Date: 1952-04-24
Final Drill Date: 1952-06-13
Well Total Depth: 2028.00 m
Surface Hole Latitude: 53.165167
Surface Hole Longitude: -113.869254

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-04-17 Obtained License
1952-05-13 Drill Stem Test Performed
1952-05-14 Drill Stem Test Performed
1952-05-15 Drill Stem Test Performed
1952-05-27 Drill Stem Test Performed
1952-05-28 Drill Stem Test Performed
1952-06-09 Production Casing Operation Performed
1952-06-13 Finished Drilling
1952-06-13 Perforation Treatment Performed - Open-Hole Completion
1952-06-13 Well Mode changed to Drilled and Cased
1952-06-19 Well Began Production
1952-06-19 Well Fluid changed to Crude Oil
1952-06-19 Well Mode changed to Flowing
1958-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-12-11 Perforation Treatment Performed - Jet Perforation
1966-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-06-09 Perforation Treatment Performed - Jet Perforation
1978-06-13 Perforation Treatment Performed - Cement Squeeze
1978-06-16 Perforation Treatment Performed - Jet Perforation
1978-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-05-25 Perforation Treatment Performed - Cement Squeeze
1981-05-27 Perforation Treatment Performed - Jet Perforation
1981-05-30 Perforation Treatment Performed - Open-Hole Completion
1981-09-29 Well Fluid changed to Crude Oil
1981-09-29 Well Mode changed to Flowing
1983-01-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-12-15 Well Log Performed
1984-06-25 Perforation Treatment Performed - Cement Squeeze
1984-06-25 Plug Back Performed
1984-06-25 Well Fluid changed to Crude Oil
1984-06-25 Well Mode changed to Flowing
1984-06-27 Well Log Performed
1984-06-28 Well Log Performed
1985-01-16 Perforation Treatment Performed - Open-Hole Completion
1985-01-21 Liner Casing Operation Performed
1985-01-21 Perforation Treatment Performed - Cement Squeeze
1985-01-24 Well Log Performed
1985-01-26 Perforation Treatment Performed - Jet Perforation
1985-01-26 Well Log Performed
1985-02-22 Perforation Treatment Performed - Cement Squeeze
1985-02-24 Well Log Performed
1985-02-25 Perforation Treatment Performed - Cement Squeeze
1985-02-25 Perforation Treatment Performed - Jet Perforation
1985-02-27 Perforation Treatment Performed - Jet Perforation
1985-02-27 Well Log Performed
1985-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-28 Perforation Treatment Performed - Cement Squeeze
1985-05-30 Perforation Treatment Performed - Jet Perforation
1985-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-31 Well Log Performed
1986-01-19 Well Fluid changed to Crude Oil
1986-01-19 Well Mode changed to Pumping
1987-10-01 Well Fluid changed to Crude Oil
1987-10-01 Well Mode changed to Flowing
1988-12-16 Perforation Treatment Performed - Cement Squeeze
1989-01-10 Well Log Performed
1989-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-01-11 Perforation Treatment Performed - Jet Perforation
1995-09-26 Perforation Treatment Performed - Cement Squeeze
1995-09-28 Perforation Treatment Performed - Jet Perforation
1995-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-01 Perforation Treatment Performed - Jet Perforation
1995-10-02 Perforation Treatment Performed - Cement Squeeze
1995-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-10 Perforation Treatment Performed - Jet Perforation
1997-07-11 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-10-28 Perforation Treatment Performed - Jet Perforation
2006-10-28 Well Log Performed
2006-10-29 Perforation Treatment Performed - Jet Perforation
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2011-10-28 Well Log Performed
2012-07-29 Well Log Performed
2012-07-30 Well Log Performed
2012-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-31 Perforation Treatment Performed - Jet Perforation
2012-07-31 Plug Back Performed
2012-07-31 Well Fluid changed to Crude Oil
2012-07-31 Well Mode changed to Abandoned Zone
2012-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-01 Perforation Treatment Performed - Jet Perforation
2012-08-01 Perforation Treatment Performed - Remedial Casing
2012-08-01 Well Log Performed
2012-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-02 Perforation Treatment Performed - Cement Plug
2012-08-07 Perforation Treatment Performed - Jet Perforation
2012-08-07 Well Log Performed
2012-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-08 Perforation Treatment Performed - Cement Plug
2012-08-08 Perforation Treatment Performed - Remedial Casing
2013-06-26 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-06-13 Open Hole/Barefoot Completion 1878.20 1920.20 0
1978-06-13 Cement Squeeze 1714.80 1723.90 0
1978-06-16 Perforation 1715.40 1718.20 7
1978-06-27 Acid Treatment 1715.40 1718.20 0
1981-05-25 Cement Squeeze 1715.40 1718.20 0
1981-05-27 Perforation 1738.60 1741.00 13
1981-05-27 Perforation 1744.70 1747.70 13
1981-05-30 Open Hole/Barefoot Completion 1878.20 2011.00 0
1983-01-05 Acid Treatment 1738.60 1747.00 0
1984-06-25 Cement Squeeze 1738.60 1747.00 0
1985-01-16 Open Hole/Barefoot Completion 1878.20 2028.00 0
1958-12-11 Perforation 1744.70 1747.70 13
1985-01-21 Cement Squeeze 1878.20 2028.00 0
1985-01-26 Perforation 1971.20 1971.70 13
1985-02-22 Cement Squeeze 1971.20 1971.70 0
1985-02-25 Perforation 1964.30 1964.80 13
1985-02-25 Cement Squeeze 1964.30 1964.80 0
1985-02-27 Perforation 1972.20 1972.50 13
1985-02-28 Acid Treatment 1972.20 1972.50 0
1985-05-28 Cement Squeeze 1972.20 1972.50 0
1985-05-30 Perforation 1975.00 1975.50 13
1985-05-31 Acid Treatment 1975.00 1975.50 0
1958-12-11 Perforation 1738.60 1741.00 13
1988-12-16 Cement Squeeze 1975.00 1975.50 0
1989-01-11 Perforation 1994.00 1995.00 14
1989-01-11 Perforation 1919.00 1919.50 14
1989-01-11 Acid Treatment 1994.00 1995.00 0
1989-01-11 Acid Treatment 1919.00 1919.50 0
1995-09-26 Cement Squeeze 1919.00 1919.50 0
1995-09-28 Perforation 1994.70 1995.00 72
1995-10-01 Perforation 1912.00 1912.50 20
1995-10-01 Perforation 1997.00 1997.50 20
1995-10-01 Acid Treatment 1997.00 1997.50 0
1958-12-11 Acid Treatment 1738.60 1747.70 0
1995-10-02 Cement Squeeze 1994.00 1995.00 0
1995-10-04 Acid Treatment 1912.00 1912.50 0
1997-07-10 Perforation 2001.00 2004.50 20
1997-07-10 Perforation 2004.90 2005.40 20
1997-07-11 Acid Treatment 2001.00 2005.40 0
2006-10-28 Perforation 1927.00 1933.00 13
2006-10-29 Perforation 1908.50 1914.50 13
2006-10-29 Perforation 1887.00 1893.00 13
2006-10-29 Perforation 1877.00 1882.00 13
2012-07-31 Packing Device Capped w/Cement 772.00 1874.00 0
1966-09-16 Acid Treatment 1738.60 1741.00 0
2012-07-31 Perforation 699.00 700.00 17
2012-08-01 Remedial Casing Cementing 699.00 700.00 0
2012-08-01 Packing Device Capped w/Cement 450.00 690.00 0
2012-08-01 Perforation 437.30 438.30 17
2012-08-01 Remedial Casing Cementing 437.30 438.30 0
2012-08-02 Cement Plug 430.00 438.00 0
2012-08-02 Packing Device Capped w/Cement 409.00 429.00 0
2012-08-07 Perforation 381.00 382.00 17
2012-08-07 Perforation 338.00 339.00 17
2012-08-07 Perforation 298.00 299.00 17
1977-05-31 Packing Device Capped w/Cement 1729.70 1734.30 0
2012-08-07 Perforation 271.00 272.00 17
2012-08-07 Perforation 253.00 254.00 17
2012-08-07 Perforation 234.00 235.00 17
2012-08-07 Perforation 218.00 219.00 17
2012-08-08 Remedial Casing Cementing 218.00 382.00 0
2012-08-08 Cement Plug 219.00 409.00 0
2012-08-08 Packing Device Capped w/Cement 192.00 219.00 0
1977-06-09 Perforation 1714.80 1717.50 3
1977-06-09 Perforation 1719.70 1720.30 3
1977-06-09 Perforation 1721.50 1723.90 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1981 866 0.0 0.0 0.0
1982 7828 0.0 0.0 0.0
1983 7927 0.0 0.0 0.0
1984 6775 0.0 0.0 0.0
1985 566 0.0 0.0 0.0
1986 2454 0.0 0.0 0.0
1987 8508 0.0 0.0 0.0
1988 6831 0.0 0.0 0.0
1989 7867 0.0 0.0 0.0
1990 8387 0.0 0.0 0.0
1991 8218 0.0 0.0 0.0
1992 6360 0.0 0.0 0.0
1993 7162 0.0 0.0 0.0
1994 8261 0.0 0.0 0.0
1995 7308 0.0 0.0 0.0
1996 5464 0.0 0.0 0.0
1997 8224 0.0 0.0 0.0
1998 8755 0.0 0.0 0.0
1999 8713 0.0 0.0 0.0
2000 7890 0.0 0.0 0.0
2001 8569 0.0 0.0 0.0
2002 8293 0.0 0.0 0.0
2003 5685 0.0 0.0 0.0
2004 7849 0.0 0.0 0.0
2005 4212 0.0 0.0 0.0
2006 6552 0.0 0.0 0.0
2007 6863 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References