If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484272114000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.161464,"lon":-113.892323,"icon":""}]} |
Location: 00/14-21-048-27W4/0 | |
Location Alias: 00/14-21-48-27 W4M | |
Location Alias 2: 00/14-21-048-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 27 | |
Section: 21 | |
County/Municipality: Leduc County | |
Well Name: ESSO WIZARD LAKE 14-21-48-27 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0123483 | |
License Date: 1986-07-16 | |
License Status: Abandoned | |
Spud Date: 1986-07-25 | |
Final Drill Date: 1986-08-08 | |
Well Total Depth: 2078.50 m | |
Surface Hole Latitude: 53.161464 | |
Surface Hole Longitude: -113.892323 |
Date | Event |
---|---|
1986-07-16 | Obtained License |
1986-07-27 | Surface Casing Operation Performed |
1986-08-08 | Finished Drilling |
1986-08-09 | Well Log Performed |
1986-08-10 | Well Log Performed |
1986-08-11 | Drill Stem Test Performed |
1986-08-13 | Drill Stem Test Performed |
1986-08-14 | Lost Circulation Occurred |
1986-08-15 | Production Casing Operation Performed |
1986-08-15 | Rig Released |
1986-08-24 | Perforation Treatment Performed - Open-Hole Completion |
1986-08-24 | Well Log Performed |
1986-09-18 | Well Log Performed |
1986-09-19 | Well Mode changed to Drilled and Cased |
1997-06-16 | Well Log Performed |
1997-06-18 | Perforation Treatment Performed - Jet Perforation |
1997-06-18 | Perforation Treatment Performed - Remedial Casing |
1997-06-18 | Well Log Performed |
1998-01-01 | Well Began Production |
1998-01-01 | Well Fluid changed to Crude Oil |
1998-01-01 | Well Mode changed to Flowing |
2010-06-01 | Well Fluid changed to Crude Oil |
2010-06-01 | Well Mode changed to Suspended |
2011-09-13 | Well Log Performed |
2011-10-04 | Well Log Performed |
2011-10-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-10-06 | Perforation Treatment Performed - Jet Perforation |
2011-10-06 | Perforation Treatment Performed - Remedial Casing |
2011-10-06 | Plug Back Performed |
2011-10-06 | Well Fluid changed to Crude Oil |
2011-10-06 | Well Mode changed to Abandoned Zone |
2011-10-07 | Well Log Performed |
2011-10-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-10-11 | Perforation Treatment Performed - Jet Perforation |
2011-10-11 | Perforation Treatment Performed - Remedial Casing |
2011-10-12 | Perforation Treatment Performed - Jet Perforation |
2011-10-12 | Well Log Performed |
2011-10-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-10-13 | Perforation Treatment Performed - Cement Plug |
2011-10-13 | Perforation Treatment Performed - Remedial Casing |
2013-02-26 | Well Abandoned |
2013-02-26 | Well Fluid changed to Crude Oil |
2013-02-26 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1986-08-24 | Open Hole/Barefoot Completion | 1831.70 | 2078.50 | 0 |
2011-10-11 | Packing Device Capped w/Cement | 419.50 | 427.50 | 0 |
2011-10-12 | Perforation | 366.00 | 367.00 | 17 |
2011-10-12 | Perforation | 311.00 | 312.00 | 17 |
2011-10-12 | Perforation | 286.00 | 287.00 | 17 |
2011-10-12 | Perforation | 269.00 | 270.00 | 17 |
2011-10-12 | Perforation | 215.00 | 216.00 | 17 |
2011-10-13 | Remedial Casing Cementing | 215.00 | 367.00 | 0 |
2011-10-13 | Cement Plug | 205.40 | 216.00 | 0 |
2011-10-13 | Packing Device Capped w/Cement | 197.00 | 205.00 | 0 |
1997-06-18 | Perforation | 444.50 | 445.00 | 13 |
1997-06-18 | Remedial Casing Cementing | 444.50 | 445.00 | 0 |
2011-10-06 | Packing Device Capped w/Cement | 635.00 | 1830.00 | 0 |
2011-10-06 | Perforation | 709.50 | 710.50 | 17 |
2011-10-06 | Remedial Casing Cementing | 709.50 | 710.50 | 0 |
2011-10-11 | Packing Device Capped w/Cement | 440.00 | 461.00 | 0 |
2011-10-11 | Perforation | 437.60 | 438.60 | 17 |
2011-10-11 | Remedial Casing Cementing | 437.60 | 438.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 3186 | 0.0 | 0.0 | 0.0 |
1999 | 3350 | 0.0 | 0.0 | 0.0 |
2000 | 158 | 0.0 | 0.0 | 0.0 |
2001 | 479 | 0.0 | 0.0 | 0.0 |
2003 | 758 | 0.0 | 0.0 | 0.0 |
2004 | 1620 | 0.0 | 0.0 | 0.0 |
2005 | 251 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1986-08-14 | Lost Circulation | 1835.00 | 1835.00 |
For data sources see[6]