X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271616020

Well Details

Well ID: 0484271616020
Loading map...
Location: 02/16-16-048-27W4/0
Location Alias: 02/16-16-48-27 W4M
Location Alias 2: 02/16-16-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE 16-16-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0123567
License Date: 1986-07-30
License Status: Abandoned
Spud Date: 1986-08-16
Final Drill Date: 1986-09-23
Well Total Depth: 2033.00 m
Surface Hole Latitude: 53.145460
Surface Hole Longitude: -113.883985

For data sources see[1][2]

Well History

Date Event
1986-07-30 Obtained License
1986-08-16 Surface Casing Operation Performed
1986-08-31 Production Casing Operation Performed
1986-08-31 Rig Released
1986-09-23 Finished Drilling
1986-09-23 Perforation Treatment Performed - Open-Hole Completion
1986-09-23 Well Mode changed to Drilled and Cased
1986-09-26 Well Log Performed
1986-09-28 Liner Casing Operation Performed
1986-09-28 Perforation Treatment Performed - Cement Squeeze
1986-09-30 Well Log Performed
1986-10-07 Perforation Treatment Performed - Jet Perforation
1986-10-07 Well Log Performed
1986-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-05 Well Began Production
1986-12-05 Well Fluid changed to Crude Oil
1986-12-05 Well Mode changed to Flowing
1989-02-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-02-10 Perforation Treatment Performed - Cement Squeeze
1989-02-11 Perforation Treatment Performed - Jet Perforation
1989-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-02-22 Perforation Treatment Performed - Cement Squeeze
1991-02-23 Perforation Treatment Performed - Cement Squeeze
1991-02-24 Perforation Treatment Performed - Cement Squeeze
1991-02-25 Perforation Treatment Performed - Cement Squeeze
1991-02-28 Perforation Treatment Performed - Jet Perforation
1991-02-28 Well Log Performed
1991-03-01 Well Log Performed
1991-03-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-02 Well Log Performed
1991-03-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-03-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-05 Well Log Performed
1996-02-13 Perforation Treatment Performed - Cement Squeeze
1996-02-15 Perforation Treatment Performed - Jet Perforation
1996-02-16 Perforation Treatment Performed - Cement Squeeze
1996-02-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-02-18 Perforation Treatment Performed - Jet Perforation
1996-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-16 Perforation Treatment Performed - Jet Perforation
1997-01-16 Well Log Performed
1997-01-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-12 Perforation Treatment Performed - Jet Perforation
2007-06-12 Well Log Performed
2007-06-13 Perforation Treatment Performed - Jet Perforation
2007-06-13 Well Log Performed
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2011-06-26 Well Log Performed
2011-06-27 Well Log Performed
2011-06-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-28 Perforation Treatment Performed - Jet Perforation
2011-06-28 Perforation Treatment Performed - Remedial Casing
2011-06-28 Plug Back Performed
2011-06-28 Well Fluid changed to Crude Oil
2011-06-28 Well Mode changed to Abandoned Zone
2011-06-29 Perforation Treatment Performed - Jet Perforation
2011-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-05 Perforation Treatment Performed - Remedial Casing
2011-07-06 Perforation Treatment Performed - Jet Perforation
2011-07-06 Well Log Performed
2011-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-07-07 Perforation Treatment Performed - Remedial Casing
2012-05-17 Well Abandoned
2012-05-17 Well Fluid changed to Crude Oil
2012-05-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-09-23 Open Hole/Barefoot Completion 1859.00 2033.00 0
1989-02-12 Acid Treatment 1933.00 1933.50 0
1991-02-22 Cement Squeeze 1933.00 1933.50 0
1991-02-23 Cement Squeeze 1933.00 1933.50 0
1991-02-24 Cement Squeeze 1997.30 1998.30 0
1991-02-25 Cement Squeeze 1997.30 1998.30 0
1991-02-28 Perforation 1869.00 1869.50 7
1991-02-28 Perforation 2001.00 2001.50 13
1991-02-28 Perforation 2003.50 2004.00 13
1991-02-28 Perforation 2006.00 2006.50 13
1991-03-02 Acid Treatment 1991.50 2006.50 0
1986-09-28 Cement Squeeze 1859.00 2033.00 0
1991-03-03 Acid Treatment 1991.50 1998.30 0
1991-03-05 Acid Treatment 2001.00 2004.00 0
1991-03-05 Acid Treatment 1869.00 1869.50 0
1996-02-13 Cement Squeeze 1869.00 1869.50 0
1996-02-15 Perforation 2003.60 2003.90 13
1996-02-16 Cement Squeeze 2001.00 2006.50 0
1996-02-18 Perforation 1882.00 1882.50 20
1996-02-18 Perforation 2007.50 2008.00 20
1996-02-18 Acid Treatment 2007.50 2008.00 0
1996-02-19 Acid Treatment 1882.00 2008.00 0
1986-10-07 Perforation 1991.50 1992.00 13
1997-01-16 Perforation 2011.00 2011.50 20
1997-01-16 Perforation 2014.40 2014.80 20
1997-01-17 Acid Treatment 2014.40 2014.80 0
1997-01-18 Acid Treatment 2011.00 2011.50 0
2007-06-12 Perforation 1880.00 1884.00 13
2007-06-12 Perforation 1896.00 1900.00 13
2007-06-12 Perforation 1909.00 1913.00 13
2007-06-13 Perforation 1865.50 1869.50 13
2011-06-28 Packing Device Capped w/Cement 550.00 1857.00 0
2011-06-28 Perforation 709.00 710.00 17
1986-10-10 Acid Treatment 1991.50 1992.00 0
2011-06-28 Remedial Casing Cementing 709.00 710.00 0
2011-06-29 Perforation 465.00 466.00 17
2011-07-05 Remedial Casing Cementing 465.00 466.00 0
2011-07-05 Packing Device Capped w/Cement 435.50 453.50 0
2011-07-06 Perforation 423.00 424.00 17
2011-07-06 Perforation 375.00 376.00 17
2011-07-06 Perforation 322.00 323.00 17
2011-07-06 Perforation 305.00 306.00 17
2011-07-06 Perforation 273.00 274.00 17
2011-07-06 Perforation 260.00 261.00 17
1989-02-10 Acid Treatment 1991.50 1992.00 0
2011-07-06 Perforation 216.00 217.00 17
2011-07-07 Remedial Casing Cementing 216.00 424.00 0
2011-07-07 Packing Device Capped w/Cement 187.00 205.00 0
1989-02-10 Cement Squeeze 1991.50 1992.00 0
1989-02-11 Perforation 1997.30 1998.30 14
1989-02-11 Perforation 1933.00 1933.50 14
1989-02-12 Acid Treatment 1997.30 1998.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 380 0.0 0.0 0.0
1987 8117 0.0 0.0 0.0
1988 8342 0.0 0.0 0.0
1989 8004 0.0 0.0 0.0
1990 7416 0.0 0.0 0.0
1991 5982 0.0 0.0 0.0
1992 6308 0.0 0.0 0.0
1993 1832 0.0 0.0 0.0
1994 4067 0.0 0.0 0.0
1995 5799 0.0 0.0 0.0
1996 7388 0.0 0.0 0.0
1997 6521 0.0 0.0 0.0
1998 2382 0.0 0.0 0.0
1999 1032 0.0 0.0 0.0
2000 24 0.0 0.0 0.0
2001 187 0.0 0.0 0.0
2003 3304 0.0 0.0 0.0
2004 6937 0.0 0.0 0.0
2005 192 0.0 0.0 0.0
2006 4706 0.0 0.0 0.0
2007 7709 0.0 0.0 0.0

For data sources see[5]

References