X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271608020

Well Details

Well ID: 0484271608020
Loading map...
Location: 02/08-16-048-27W4/0
Location Alias: 02/08-16-48-27 W4M
Location Alias 2: 02/08-16-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE 8-16-48-27
Operator Name: Imperial Oil Resources Limited
License Number: 0108859
License Date: 1984-08-23
License Status: Abandoned
Spud Date: 1984-09-01
Final Drill Date: 1984-09-11
Well Total Depth: 2029.50 m
Surface Hole Latitude: 53.138462
Surface Hole Longitude: -113.883976

For data sources see[1][2]

Well History

Date Event
1984-08-20 Well Log Performed
1984-08-23 Obtained License
1984-09-01 Surface Casing Operation Performed
1984-09-11 Finished Drilling
1984-09-11 Well Mode changed to Drilled and Cased
1984-09-12 Production Casing Operation Performed
1984-09-12 Rig Released
1984-09-23 Perforation Treatment Performed - Open-Hole Completion
1984-09-23 Well Log Performed
1984-09-29 Liner Casing Operation Performed
1984-09-29 Perforation Treatment Performed - Cement Squeeze
1984-10-01 Well Log Performed
1984-10-11 Perforation Treatment Performed - Jet Perforation
1984-10-11 Well Log Performed
1984-10-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-10-20 Well Began Production
1984-10-20 Well Fluid changed to Crude Oil
1984-10-20 Well Mode changed to Flowing
1984-11-07 Well Log Performed
1985-08-20 Well Log Performed
1986-03-21 Well Log Performed
1987-06-08 Well Log Performed
1987-12-10 Perforation Treatment Performed - Chemical Squeeze
1988-02-16 Perforation Treatment Performed - Cement Squeeze
1988-02-18 Perforation Treatment Performed - Jet Perforation
1988-02-18 Well Log Performed
1988-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-02-19 Perforation Treatment Performed - Jet Perforation
1988-02-20 Well Log Performed
1989-02-07 Well Log Performed
1989-10-04 Well Log Performed
1990-02-06 Well Log Performed
1990-05-22 Well Log Performed
1990-08-23 Well Log Performed
1991-06-11 Well Log Performed
1992-10-16 Perforation Treatment Performed - Jet Perforation
1992-10-17 Well Log Performed
1992-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-11-18 Well Log Performed
1993-02-09 Well Log Performed
1993-02-25 Well Log Performed
1993-06-10 Well Log Performed
1993-08-26 Well Log Performed
1993-11-08 Well Log Performed
1994-02-02 Well Log Performed
1994-08-10 Well Log Performed
1995-02-21 Well Log Performed
1995-05-02 Well Log Performed
1995-08-01 Well Log Performed
1995-11-23 Well Log Performed
1996-02-20 Well Log Performed
1996-11-12 Well Log Performed
1997-02-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-02-28 Perforation Treatment Performed - Jet Perforation
1997-02-28 Well Log Performed
1997-11-06 Well Log Performed
1998-01-16 Perforation Treatment Performed - Cement Squeeze
1998-01-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-19 Perforation Treatment Performed - Jet Perforation
1998-02-25 Well Log Performed
1998-08-05 Well Log Performed
1998-11-03 Well Log Performed
1999-02-01 Well Log Performed
1999-05-13 Well Log Performed
1999-09-07 Well Log Performed
1999-12-09 Well Log Performed
2000-06-14 Well Log Performed
2001-12-06 Well Log Performed
2003-04-03 Well Log Performed
2004-02-01 Well Fluid changed to Crude Oil
2004-02-01 Well Mode changed to Suspended
2005-10-17 Perforation Treatment Performed - Jet Perforation
2005-10-17 Well Log Performed
2005-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-11-01 Well Fluid changed to Crude Oil
2005-11-01 Well Mode changed to Flowing
2006-07-04 Perforation Treatment Performed - Jet Perforation
2006-07-04 Well Log Performed
2006-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2006-12-28 Perforation Treatment Performed - Jet Perforation
2006-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-05-28 Well Log Performed
2007-05-29 Perforation Treatment Performed - Jet Perforation
2007-05-29 Well Log Performed
2007-05-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-06-06 Perforation Treatment Performed - Jet Perforation
2007-06-07 Well Log Performed
2007-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-09-05 Perforation Treatment Performed - Jet Perforation
2007-09-05 Well Log Performed
2007-12-04 Well Log Performed
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2011-06-28 Well Log Performed
2011-09-11 Well Log Performed
2011-09-14 Well Log Performed
2011-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-15 Perforation Treatment Performed - Jet Perforation
2011-09-15 Perforation Treatment Performed - Remedial Casing
2011-09-15 Plug Back Performed
2011-09-15 Well Fluid changed to Crude Oil
2011-09-15 Well Mode changed to Abandoned Zone
2011-09-20 Perforation Treatment Performed - Jet Perforation
2011-09-20 Well Log Performed
2011-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-09-21 Perforation Treatment Performed - Remedial Casing
2011-09-22 Perforation Treatment Performed - Cement Plug
2011-09-22 Perforation Treatment Performed - Jet Perforation
2011-09-22 Perforation Treatment Performed - Remedial Casing
2011-09-22 Well Log Performed
2011-09-28 Perforation Treatment Performed - Jet Perforation
2011-09-28 Perforation Treatment Performed - Remedial Casing
2011-09-28 Well Log Performed
2011-09-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-06 Well Log Performed
2012-05-09 Well Abandoned
2012-05-09 Well Fluid changed to Crude Oil
2012-05-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-23 Open Hole/Barefoot Completion 1820.00 2029.50 0
1992-10-16 Perforation 2010.60 2011.10 20
1992-10-16 Perforation 2014.10 2014.60 20
1992-10-18 Acid Treatment 2010.60 2011.10 0
1997-02-28 Perforation 2017.20 2017.70 20
1997-02-28 Acid Treatment 2017.20 2017.70 0
1998-01-16 Cement Squeeze 2007.60 2017.70 0
1998-01-19 Acid Treatment 1951.00 1951.50 0
1998-01-19 Perforation 2017.60 2018.10 20
1998-01-19 Perforation 2020.50 2021.00 20
2005-10-17 Perforation 1972.00 1978.00 20
1984-09-29 Cement Squeeze 1820.00 2029.50 0
2005-10-18 Acid Treatment 1972.00 1978.00 0
2006-07-04 Perforation 1941.50 1947.50 13
2006-07-05 Acid Treatment 1941.50 1947.50 0
2006-12-28 Perforation 1918.00 1924.00 13
2006-12-29 Acid Treatment 1918.00 1924.00 0
2007-05-29 Perforation 1900.00 1906.00 13
2007-05-30 Acid Treatment 1900.00 1906.00 0
2007-06-06 Perforation 1875.00 1881.00 13
2007-06-13 Acid Treatment 1875.00 1881.00 0
2007-09-05 Perforation 1843.00 1848.00 13
1984-10-11 Perforation 1997.00 1997.50 13
2011-09-15 Packing Device Capped w/Cement 808.00 1836.00 0
2011-09-15 Perforation 718.00 719.00 17
2011-09-15 Remedial Casing Cementing 718.00 719.00 0
2011-09-20 Perforation 469.00 470.00 17
2011-09-21 Remedial Casing Cementing 469.00 470.00 0
2011-09-21 Packing Device Capped w/Cement 451.00 459.50 0
2011-09-22 Perforation 409.00 410.00 17
2011-09-22 Perforation 391.00 392.00 17
2011-09-22 Perforation 360.00 361.00 17
2011-09-22 Perforation 334.50 335.50 17
1984-10-12 Acid Treatment 1997.00 1997.50 0
2011-09-22 Perforation 319.00 320.00 17
2011-09-22 Perforation 281.00 282.00 17
2011-09-22 Perforation 221.00 222.00 17
2011-09-22 Remedial Casing Cementing 221.00 410.00 0
2011-09-22 Cement Plug 221.00 477.00 0
2011-09-28 Perforation 201.00 202.00 17
2011-09-28 Remedial Casing Cementing 201.00 202.00 0
2011-09-29 Packing Device Capped w/Cement 177.00 187.00 0
1987-12-10 Chemical Squeeze 1997.00 1997.50 0
1988-02-16 Cement Squeeze 1997.00 1997.50 0
1988-02-18 Perforation 2007.60 2008.60 15
1988-02-19 Perforation 1951.00 1951.50 14
1988-02-19 Acid Treatment 1951.00 1951.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 1272 0.0 0.0 0.0
1985 8108 0.0 0.0 0.0
1986 8240 0.0 0.0 0.0
1987 5349 0.0 0.0 0.0
1988 7494 0.0 0.0 0.0
1989 8329 0.0 0.0 0.0
1990 8533 0.0 0.0 0.0
1991 8152 0.0 0.0 0.0
1992 7371 0.0 0.0 0.0
1993 6638 0.0 0.0 0.0
1994 6586 0.0 0.0 0.0
1995 8366 0.0 0.0 0.0
1996 6758 0.0 0.0 0.0
1997 2292 0.0 0.0 0.0
1998 7668 0.0 0.0 0.0
1999 8744 0.0 0.0 0.0
2000 7979 0.0 0.0 0.0
2001 7576 0.0 0.0 0.0
2002 4744 0.0 0.0 0.0
2003 1 0.0 0.0 0.0
2005 775 0.0 0.0 0.0
2006 8627 0.0 0.0 0.0
2007 8530 0.0 0.0 0.0
2008 7567 0.0 0.0 0.0
2009 2918 0.0 0.0 0.0

For data sources see[5]

References