If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484271608020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.138462,"lon":-113.883976,"icon":""}]} |
Location: 02/08-16-048-27W4/0 | |
Location Alias: 02/08-16-48-27 W4M | |
Location Alias 2: 02/08-16-048-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 27 | |
Section: 16 | |
County/Municipality: Leduc County | |
Well Name: ESSO WIZARD LAKE 8-16-48-27 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0108859 | |
License Date: 1984-08-23 | |
License Status: Abandoned | |
Spud Date: 1984-09-01 | |
Final Drill Date: 1984-09-11 | |
Well Total Depth: 2029.50 m | |
Surface Hole Latitude: 53.138462 | |
Surface Hole Longitude: -113.883976 |
Date | Event |
---|---|
1984-08-20 | Well Log Performed |
1984-08-23 | Obtained License |
1984-09-01 | Surface Casing Operation Performed |
1984-09-11 | Finished Drilling |
1984-09-11 | Well Mode changed to Drilled and Cased |
1984-09-12 | Production Casing Operation Performed |
1984-09-12 | Rig Released |
1984-09-23 | Perforation Treatment Performed - Open-Hole Completion |
1984-09-23 | Well Log Performed |
1984-09-29 | Liner Casing Operation Performed |
1984-09-29 | Perforation Treatment Performed - Cement Squeeze |
1984-10-01 | Well Log Performed |
1984-10-11 | Perforation Treatment Performed - Jet Perforation |
1984-10-11 | Well Log Performed |
1984-10-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-10-20 | Well Began Production |
1984-10-20 | Well Fluid changed to Crude Oil |
1984-10-20 | Well Mode changed to Flowing |
1984-11-07 | Well Log Performed |
1985-08-20 | Well Log Performed |
1986-03-21 | Well Log Performed |
1987-06-08 | Well Log Performed |
1987-12-10 | Perforation Treatment Performed - Chemical Squeeze |
1988-02-16 | Perforation Treatment Performed - Cement Squeeze |
1988-02-18 | Perforation Treatment Performed - Jet Perforation |
1988-02-18 | Well Log Performed |
1988-02-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-02-19 | Perforation Treatment Performed - Jet Perforation |
1988-02-20 | Well Log Performed |
1989-02-07 | Well Log Performed |
1989-10-04 | Well Log Performed |
1990-02-06 | Well Log Performed |
1990-05-22 | Well Log Performed |
1990-08-23 | Well Log Performed |
1991-06-11 | Well Log Performed |
1992-10-16 | Perforation Treatment Performed - Jet Perforation |
1992-10-17 | Well Log Performed |
1992-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1992-11-18 | Well Log Performed |
1993-02-09 | Well Log Performed |
1993-02-25 | Well Log Performed |
1993-06-10 | Well Log Performed |
1993-08-26 | Well Log Performed |
1993-11-08 | Well Log Performed |
1994-02-02 | Well Log Performed |
1994-08-10 | Well Log Performed |
1995-02-21 | Well Log Performed |
1995-05-02 | Well Log Performed |
1995-08-01 | Well Log Performed |
1995-11-23 | Well Log Performed |
1996-02-20 | Well Log Performed |
1996-11-12 | Well Log Performed |
1997-02-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1997-02-28 | Perforation Treatment Performed - Jet Perforation |
1997-02-28 | Well Log Performed |
1997-11-06 | Well Log Performed |
1998-01-16 | Perforation Treatment Performed - Cement Squeeze |
1998-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-01-19 | Perforation Treatment Performed - Jet Perforation |
1998-02-25 | Well Log Performed |
1998-08-05 | Well Log Performed |
1998-11-03 | Well Log Performed |
1999-02-01 | Well Log Performed |
1999-05-13 | Well Log Performed |
1999-09-07 | Well Log Performed |
1999-12-09 | Well Log Performed |
2000-06-14 | Well Log Performed |
2001-12-06 | Well Log Performed |
2003-04-03 | Well Log Performed |
2004-02-01 | Well Fluid changed to Crude Oil |
2004-02-01 | Well Mode changed to Suspended |
2005-10-17 | Perforation Treatment Performed - Jet Perforation |
2005-10-17 | Well Log Performed |
2005-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-11-01 | Well Fluid changed to Crude Oil |
2005-11-01 | Well Mode changed to Flowing |
2006-07-04 | Perforation Treatment Performed - Jet Perforation |
2006-07-04 | Well Log Performed |
2006-07-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-12-28 | Perforation Treatment Performed - Jet Perforation |
2006-12-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-05-28 | Well Log Performed |
2007-05-29 | Perforation Treatment Performed - Jet Perforation |
2007-05-29 | Well Log Performed |
2007-05-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-06-06 | Perforation Treatment Performed - Jet Perforation |
2007-06-07 | Well Log Performed |
2007-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2007-09-05 | Perforation Treatment Performed - Jet Perforation |
2007-09-05 | Well Log Performed |
2007-12-04 | Well Log Performed |
2010-06-01 | Well Fluid changed to Crude Oil |
2010-06-01 | Well Mode changed to Suspended |
2011-06-28 | Well Log Performed |
2011-09-11 | Well Log Performed |
2011-09-14 | Well Log Performed |
2011-09-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-09-15 | Perforation Treatment Performed - Jet Perforation |
2011-09-15 | Perforation Treatment Performed - Remedial Casing |
2011-09-15 | Plug Back Performed |
2011-09-15 | Well Fluid changed to Crude Oil |
2011-09-15 | Well Mode changed to Abandoned Zone |
2011-09-20 | Perforation Treatment Performed - Jet Perforation |
2011-09-20 | Well Log Performed |
2011-09-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-09-21 | Perforation Treatment Performed - Remedial Casing |
2011-09-22 | Perforation Treatment Performed - Cement Plug |
2011-09-22 | Perforation Treatment Performed - Jet Perforation |
2011-09-22 | Perforation Treatment Performed - Remedial Casing |
2011-09-22 | Well Log Performed |
2011-09-28 | Perforation Treatment Performed - Jet Perforation |
2011-09-28 | Perforation Treatment Performed - Remedial Casing |
2011-09-28 | Well Log Performed |
2011-09-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-11-06 | Well Log Performed |
2012-05-09 | Well Abandoned |
2012-05-09 | Well Fluid changed to Crude Oil |
2012-05-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1984-09-23 | Open Hole/Barefoot Completion | 1820.00 | 2029.50 | 0 |
1992-10-16 | Perforation | 2010.60 | 2011.10 | 20 |
1992-10-16 | Perforation | 2014.10 | 2014.60 | 20 |
1992-10-18 | Acid Treatment | 2010.60 | 2011.10 | 0 |
1997-02-28 | Perforation | 2017.20 | 2017.70 | 20 |
1997-02-28 | Acid Treatment | 2017.20 | 2017.70 | 0 |
1998-01-16 | Cement Squeeze | 2007.60 | 2017.70 | 0 |
1998-01-19 | Acid Treatment | 1951.00 | 1951.50 | 0 |
1998-01-19 | Perforation | 2017.60 | 2018.10 | 20 |
1998-01-19 | Perforation | 2020.50 | 2021.00 | 20 |
2005-10-17 | Perforation | 1972.00 | 1978.00 | 20 |
1984-09-29 | Cement Squeeze | 1820.00 | 2029.50 | 0 |
2005-10-18 | Acid Treatment | 1972.00 | 1978.00 | 0 |
2006-07-04 | Perforation | 1941.50 | 1947.50 | 13 |
2006-07-05 | Acid Treatment | 1941.50 | 1947.50 | 0 |
2006-12-28 | Perforation | 1918.00 | 1924.00 | 13 |
2006-12-29 | Acid Treatment | 1918.00 | 1924.00 | 0 |
2007-05-29 | Perforation | 1900.00 | 1906.00 | 13 |
2007-05-30 | Acid Treatment | 1900.00 | 1906.00 | 0 |
2007-06-06 | Perforation | 1875.00 | 1881.00 | 13 |
2007-06-13 | Acid Treatment | 1875.00 | 1881.00 | 0 |
2007-09-05 | Perforation | 1843.00 | 1848.00 | 13 |
1984-10-11 | Perforation | 1997.00 | 1997.50 | 13 |
2011-09-15 | Packing Device Capped w/Cement | 808.00 | 1836.00 | 0 |
2011-09-15 | Perforation | 718.00 | 719.00 | 17 |
2011-09-15 | Remedial Casing Cementing | 718.00 | 719.00 | 0 |
2011-09-20 | Perforation | 469.00 | 470.00 | 17 |
2011-09-21 | Remedial Casing Cementing | 469.00 | 470.00 | 0 |
2011-09-21 | Packing Device Capped w/Cement | 451.00 | 459.50 | 0 |
2011-09-22 | Perforation | 409.00 | 410.00 | 17 |
2011-09-22 | Perforation | 391.00 | 392.00 | 17 |
2011-09-22 | Perforation | 360.00 | 361.00 | 17 |
2011-09-22 | Perforation | 334.50 | 335.50 | 17 |
1984-10-12 | Acid Treatment | 1997.00 | 1997.50 | 0 |
2011-09-22 | Perforation | 319.00 | 320.00 | 17 |
2011-09-22 | Perforation | 281.00 | 282.00 | 17 |
2011-09-22 | Perforation | 221.00 | 222.00 | 17 |
2011-09-22 | Remedial Casing Cementing | 221.00 | 410.00 | 0 |
2011-09-22 | Cement Plug | 221.00 | 477.00 | 0 |
2011-09-28 | Perforation | 201.00 | 202.00 | 17 |
2011-09-28 | Remedial Casing Cementing | 201.00 | 202.00 | 0 |
2011-09-29 | Packing Device Capped w/Cement | 177.00 | 187.00 | 0 |
1987-12-10 | Chemical Squeeze | 1997.00 | 1997.50 | 0 |
1988-02-16 | Cement Squeeze | 1997.00 | 1997.50 | 0 |
1988-02-18 | Perforation | 2007.60 | 2008.60 | 15 |
1988-02-19 | Perforation | 1951.00 | 1951.50 | 14 |
1988-02-19 | Acid Treatment | 1951.00 | 1951.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 1272 | 0.0 | 0.0 | 0.0 |
1985 | 8108 | 0.0 | 0.0 | 0.0 |
1986 | 8240 | 0.0 | 0.0 | 0.0 |
1987 | 5349 | 0.0 | 0.0 | 0.0 |
1988 | 7494 | 0.0 | 0.0 | 0.0 |
1989 | 8329 | 0.0 | 0.0 | 0.0 |
1990 | 8533 | 0.0 | 0.0 | 0.0 |
1991 | 8152 | 0.0 | 0.0 | 0.0 |
1992 | 7371 | 0.0 | 0.0 | 0.0 |
1993 | 6638 | 0.0 | 0.0 | 0.0 |
1994 | 6586 | 0.0 | 0.0 | 0.0 |
1995 | 8366 | 0.0 | 0.0 | 0.0 |
1996 | 6758 | 0.0 | 0.0 | 0.0 |
1997 | 2292 | 0.0 | 0.0 | 0.0 |
1998 | 7668 | 0.0 | 0.0 | 0.0 |
1999 | 8744 | 0.0 | 0.0 | 0.0 |
2000 | 7979 | 0.0 | 0.0 | 0.0 |
2001 | 7576 | 0.0 | 0.0 | 0.0 |
2002 | 4744 | 0.0 | 0.0 | 0.0 |
2003 | 1 | 0.0 | 0.0 | 0.0 |
2005 | 775 | 0.0 | 0.0 | 0.0 |
2006 | 8627 | 0.0 | 0.0 | 0.0 |
2007 | 8530 | 0.0 | 0.0 | 0.0 |
2008 | 7567 | 0.0 | 0.0 | 0.0 |
2009 | 2918 | 0.0 | 0.0 | 0.0 |
For data sources see[5]