X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271606000

Well Details

Well ID: 0484271606000
Loading map...
Location: 00/06-16-048-27W4/0
Location Alias: 00/06-16-48-27 W4M
Location Alias 2: 00/06-16-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 16
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE NO. C-10
Operator Name: Imperial Oil Resources Limited
License Number: 0007521
License Date: 1953-12-24
License Status: RecCertified
Spud Date: 1953-12-30
Final Drill Date: 1954-02-08
Well Total Depth: 2040.00 m
Surface Hole Latitude: 53.139032
Surface Hole Longitude: -113.892503

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-12-24 Obtained License
1954-02-02 Production Casing Operation Performed
1954-02-03 Well Log Performed
1954-02-08 Finished Drilling
1954-02-08 Perforation Treatment Performed - Open-Hole Completion
1954-02-08 Well Mode changed to Drilled and Cased
1954-02-10 Well Began Production
1954-02-10 Well Fluid changed to Crude Oil
1954-02-10 Well Mode changed to Flowing
1970-07-22 Well Fluid changed to Crude Oil
1970-07-22 Well Mode changed to Suspended
1977-09-29 Perforation Treatment Performed - Fractured
1978-11-06 Well Fluid changed to Crude Oil
1978-11-06 Well Mode changed to Flowing
1984-05-16 Well Log Performed
1984-05-19 Well Log Performed
1984-05-23 Perforation Treatment Performed - Abrasa-Jet Perforation
1984-05-23 Perforation Treatment Performed - Chemical Squeeze
1984-05-23 Perforation Treatment Performed - Open-Hole Completion
1984-05-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-24 Well Log Performed
1984-05-25 Well Log Performed
1985-07-28 Liner Casing Operation Performed
1985-07-28 Perforation Treatment Performed - Cement Squeeze
1985-07-31 Well Log Performed
1985-08-01 Perforation Treatment Performed - Jet Perforation
1985-08-01 Well Log Performed
1985-08-02 Perforation Treatment Performed - Acid Wash - No Pressure
1989-09-12 Perforation Treatment Performed - Cement Squeeze
1989-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-16 Perforation Treatment Performed - Jet Perforation
1989-09-16 Well Log Performed
1998-02-14 Perforation Treatment Performed - Cement Squeeze
1998-02-20 Perforation Treatment Performed - Jet Perforation
1998-02-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-05-30 Perforation Treatment Performed - Jet Perforation
2001-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2007-05-29 Well Log Performed
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2011-06-06 Well Log Performed
2011-07-10 Well Log Performed
2011-07-11 Well Log Performed
2011-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-03 Perforation Treatment Performed - Jet Perforation
2011-08-03 Perforation Treatment Performed - Remedial Casing
2011-08-03 Plug Back Performed
2011-08-03 Well Fluid changed to Crude Oil
2011-08-03 Well Mode changed to Abandoned Zone
2011-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-04 Perforation Treatment Performed - Jet Perforation
2011-08-04 Perforation Treatment Performed - Remedial Casing
2011-08-04 Well Log Performed
2011-08-06 Perforation Treatment Performed - Jet Perforation
2011-08-06 Well Log Performed
2011-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-07 Perforation Treatment Performed - Remedial Casing
2012-05-02 Well Abandoned
2012-05-02 Well Fluid changed to Crude Oil
2012-05-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1954-02-08 Open Hole/Barefoot Completion 1989.40 2008.60 0
1989-09-12 Cement Squeeze 1998.30 1998.50 0
1989-09-16 Perforation 2008.80 2009.80 13
1989-09-16 Perforation 2013.80 2014.80 13
1989-09-16 Acid Treatment 2008.00 2014.80 0
1998-02-14 Cement Squeeze 2013.80 2014.80 0
1998-02-14 Cement Squeeze 2008.80 2009.80 0
1998-02-20 Perforation 2013.30 2013.80 20
1998-02-20 Perforation 2018.00 2018.50 20
1998-02-26 Acid Treatment 2013.30 2018.50 0
2001-05-30 Perforation 2021.00 2021.50 13
1977-09-29 Fracture 1989.40 2008.60 0
2001-05-30 Perforation 2000.50 2001.00 13
2001-05-31 Acid Treatment 2021.00 2021.50 0
2001-06-01 Acid Treatment 2000.50 2001.00 0
2011-08-03 Packing Device Capped w/Cement 635.00 1900.00 0
2011-08-03 Perforation 722.50 723.50 17
2011-08-03 Remedial Casing Cementing 722.50 723.50 0
2011-08-04 Perforation 475.20 476.20 17
2011-08-04 Remedial Casing Cementing 475.20 476.20 0
2011-08-04 Packing Device Capped w/Cement 447.00 465.00 0
2011-08-06 Perforation 438.00 439.00 17
1984-05-23 Open Hole/Barefoot Completion 1989.40 2040.00 0
2011-08-06 Perforation 396.00 397.00 17
2011-08-06 Perforation 376.00 377.00 17
2011-08-06 Perforation 365.00 366.00 17
2011-08-06 Perforation 333.00 334.00 17
2011-08-06 Perforation 317.00 318.00 17
2011-08-06 Perforation 229.00 230.00 17
2011-08-06 Perforation 206.00 207.00 17
2011-08-07 Remedial Casing Cementing 206.00 439.00 0
2011-08-07 Packing Device Capped w/Cement 176.00 194.50 0
1984-05-23 Hydra Jet Perforation 1995.00 1999.00 0
1984-05-23 Chemical Squeeze 1995.00 1999.00 0
1984-05-24 Acid Treatment 1995.00 1999.00 0
1985-07-28 Cement Squeeze 1989.40 2040.00 0
1985-08-01 Perforation 1998.30 1998.50 13
1985-08-02 Acid Wash 1998.30 1998.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1978 98 0.0 0.0 0.0
1979 1502 0.0 0.0 0.0
1980 1558 0.0 0.0 0.0
1981 678 0.0 0.0 0.0
1982 1464 0.0 0.0 0.0
1984 5022 0.0 0.0 0.0
1985 8327 0.0 0.0 0.0
1986 8379 0.0 0.0 0.0
1987 8741 0.0 0.0 0.0
1988 8760 0.0 0.0 0.0
1989 4709 0.0 0.0 0.0
1990 1348 0.0 0.0 0.0
1991 5832 0.0 0.0 0.0
1992 7567 0.0 0.0 0.0
1993 1546 0.0 0.0 0.0
1994 7545 0.0 0.0 0.0
1995 6855 0.0 0.0 0.0
1996 8688 0.0 0.0 0.0
1997 7008 0.0 0.0 0.0
1998 5935 0.0 0.0 0.0
1999 8259 0.0 0.0 0.0
2000 6222 0.0 0.0 0.0
2001 6865 0.0 0.0 0.0
2002 8608 0.0 0.0 0.0
2003 5102 0.0 0.0 0.0
2004 5929 0.0 0.0 0.0
2005 7106 0.0 0.0 0.0

For data sources see[5]

References