X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484271512000

Well Details

Well ID: 0484271512000
Loading map...
Location: 00/12-15-048-27W4/0
Location Alias: 00/12-15-48-27 W4M
Location Alias 2: 00/12-15-048-27 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 27
Section: 15
County/Municipality: Leduc County
Well Name: ESSO WIZARD LAKE CPR D-2
Operator Name: Imperial Oil Resources Limited
License Number: 0004588
License Date: 1952-04-30
License Status: Abandoned
Spud Date: 1952-05-04
Final Drill Date: 1952-06-07
Well Total Depth: 2036.00 m
Surface Hole Latitude: 53.143296
Surface Hole Longitude: -113.875255

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-04-30 Obtained License
1952-05-26 Drill Stem Test Performed
1952-05-28 Drill Stem Test Performed
1952-05-29 Drill Stem Test Performed
1952-06-04 Production Casing Operation Performed
1952-06-07 Finished Drilling
1952-06-07 Perforation Treatment Performed - Open-Hole Completion
1952-06-07 Well Mode changed to Drilled and Cased
1952-06-09 Well Began Production
1952-06-09 Well Fluid changed to Crude Oil
1952-06-09 Well Mode changed to Flowing
1971-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-08-07 Perforation Treatment Performed - Open-Hole Completion
1980-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-08 Perforation Treatment Performed - Open-Hole Completion
1982-06-21 Perforation Treatment Performed - Chemical Squeeze
1983-05-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-28 Well Log Performed
1985-02-20 Perforation Treatment Performed - Open-Hole Completion
1985-03-08 Liner Casing Operation Performed
1985-03-08 Perforation Treatment Performed - Cement Squeeze
1985-03-12 Well Log Performed
1985-03-16 Well Log Performed
1985-03-19 Perforation Treatment Performed - Jet Perforation
1985-03-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-10-03 Perforation Treatment Performed - Jet Perforation
1986-10-03 Well Log Performed
1986-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-02 Perforation Treatment Performed - Jet Perforation
1987-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-02-03 Well Log Performed
1987-02-04 Well Log Performed
1987-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-03-25 Well Log Performed
1987-06-18 Perforation Treatment Performed - Fractured
1987-06-18 Well Log Performed
1987-07-20 Perforation Treatment Performed - Jet Perforation
1987-07-20 Well Log Performed
1987-07-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-13 Well Log Performed
1990-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-15 Perforation Treatment Performed - Cement Squeeze
1990-09-20 Perforation Treatment Performed - Cement Squeeze
1990-09-23 Perforation Treatment Performed - Jet Perforation
1990-09-23 Well Log Performed
1990-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-10-09 Perforation Treatment Performed - Cement Squeeze
1995-10-10 Perforation Treatment Performed - Jet Perforation
1995-10-13 Perforation Treatment Performed - Cement Squeeze
1995-10-15 Perforation Treatment Performed - Jet Perforation
1995-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-13 Perforation Treatment Performed - Jet Perforation
1998-09-13 Well Log Performed
2010-06-01 Well Fluid changed to Crude Oil
2010-06-01 Well Mode changed to Suspended
2011-10-24 Well Log Performed
2012-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-14 Perforation Treatment Performed - Jet Perforation
2012-06-14 Plug Back Performed
2012-06-14 Well Fluid changed to Crude Oil
2012-06-14 Well Log Performed
2012-06-14 Well Mode changed to Abandoned Zone
2012-06-16 Perforation Treatment Performed - Cement Plug
2012-06-16 Perforation Treatment Performed - Remedial Casing
2012-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-17 Perforation Treatment Performed - Jet Perforation
2012-06-17 Perforation Treatment Performed - Remedial Casing
2012-06-17 Well Log Performed
2012-06-19 Perforation Treatment Performed - Jet Perforation
2012-06-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-06-20 Perforation Treatment Performed - Cement Plug
2012-06-20 Perforation Treatment Performed - Remedial Casing
2013-06-18 Well Abandoned
2013-06-18 Well Fluid changed to Crude Oil
2013-06-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-06-07 Open Hole/Barefoot Completion 1920.80 1948.00 0
1985-03-19 Perforation 1988.40 1988.90 13
1985-03-20 Acid Treatment 1988.40 1988.90 0
1986-10-03 Perforation 1994.00 1994.50 7
1986-10-14 Acid Treatment 1994.00 1994.50 0
1987-02-02 Perforation 1937.20 1937.70 7
1987-02-03 Acid Treatment 1937.20 1937.70 0
1987-02-06 Acid Treatment 1937.20 1937.70 0
1987-06-18 Fracture 1937.20 1937.70 0
1987-07-20 Perforation 1996.50 1997.00 13
1987-07-21 Acid Treatment 1994.00 1997.00 0
1971-07-16 Acid Treatment 1920.80 1948.00 0
1990-09-15 Acid Treatment 1937.20 1937.70 0
1990-09-15 Cement Squeeze 1937.20 1937.70 0
1990-09-20 Cement Squeeze 1988.40 1997.00 0
1990-09-23 Perforation 1937.20 1937.70 13
1990-09-23 Perforation 2002.40 2003.40 13
1990-09-23 Perforation 2005.40 2006.40 13
1990-09-23 Perforation 2008.40 2009.40 13
1990-09-24 Acid Treatment 1937.20 2009.40 0
1995-10-09 Cement Squeeze 1937.20 2009.40 0
1995-10-10 Perforation 2008.40 2008.70 72
1972-08-07 Open Hole/Barefoot Completion 1920.80 1994.90 0
1995-10-13 Cement Squeeze 2008.40 2008.70 0
1995-10-15 Perforation 1939.50 1940.00 20
1995-10-15 Perforation 2008.90 2009.40 20
1995-10-16 Acid Treatment 1939.50 2009.40 0
1998-09-13 Perforation 2011.80 2012.30 20
1998-09-13 Perforation 2015.40 2015.90 20
2012-06-14 Packing Device Capped w/Cement 1308.40 1930.00 0
2012-06-14 Perforation 1260.70 1261.70 17
2012-06-14 Perforation 710.00 711.00 17
2012-06-16 Remedial Casing Cementing 710.00 1261.70 0
1980-11-07 Acid Treatment 1920.80 1994.90 0
2012-06-16 Cement Plug 476.90 1322.40 0
2012-06-17 Packing Device Capped w/Cement 468.30 477.00 0
2012-06-17 Perforation 467.90 468.90 17
2012-06-17 Remedial Casing Cementing 467.90 468.90 0
2012-06-17 Packing Device Capped w/Cement 448.40 458.30 0
2012-06-19 Perforation 400.00 401.00 17
2012-06-19 Perforation 325.00 326.00 17
2012-06-19 Perforation 301.00 302.00 17
2012-06-19 Perforation 286.00 287.00 17
2012-06-19 Perforation 253.00 254.00 17
1982-06-08 Open Hole/Barefoot Completion 1920.80 2022.90 0
2012-06-19 Perforation 196.00 197.00 17
2012-06-20 Remedial Casing Cementing 196.00 401.00 0
2012-06-20 Cement Plug 191.80 448.40 0
2012-06-20 Packing Device Capped w/Cement 183.70 191.70 0
1982-06-21 Chemical Squeeze 1920.80 2022.90 0
1983-05-12 Acid Treatment 1920.80 2022.90 0
1985-02-20 Open Hole/Barefoot Completion 1920.80 2036.00 0
1985-03-08 Cement Squeeze 1920.80 2036.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5446 0.0 0.0 0.0
1968 8110 0.0 0.0 0.0
1969 6712 0.0 0.0 0.0
1970 7170 0.0 0.0 0.0
1971 4483 0.0 0.0 0.0
1972 5834 0.0 0.0 0.0
1973 4004 0.0 0.0 0.0
1974 4808 0.0 0.0 0.0
1975 7237 0.0 0.0 0.0
1976 3791 0.0 0.0 0.0
1977 2308 0.0 0.0 0.0
1978 3812 0.0 0.0 0.0
1979 5613 0.0 0.0 0.0
1980 7062 0.0 0.0 0.0
1981 5695 0.0 0.0 0.0
1982 3402 0.0 0.0 0.0
1983 6174 0.0 0.0 0.0
1984 8342 0.0 0.0 0.0
1985 7825 0.0 0.0 0.0
1986 5447 0.0 0.0 0.0
1987 4794 0.0 0.0 0.0
1988 8713 0.0 0.0 0.0
1989 8274 0.0 0.0 0.0
1990 6784 0.0 0.0 0.0
1991 7012 0.0 0.0 0.0
1992 8591 0.0 0.0 0.0
1993 5689 0.0 0.0 0.0
1994 8007 0.0 0.0 0.0
1995 6376 0.0 0.0 0.0
1996 5104 0.0 0.0 0.0
1997 7943 0.0 0.0 0.0
1998 8345 0.0 0.0 0.0
1999 7555 0.0 0.0 0.0
2000 6463 0.0 0.0 0.0
2001 7572 0.0 0.0 0.0
2002 8290 0.0 0.0 0.0
2003 7024 0.0 0.0 0.0
2004 7215 0.0 0.0 0.0
2005 7624 0.0 0.0 0.0
2006 8719 0.0 0.0 0.0
2007 2150 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References