If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484271512000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.143296,"lon":-113.875255,"icon":""}]} |
Location: 00/12-15-048-27W4/0 | |
Location Alias: 00/12-15-48-27 W4M | |
Location Alias 2: 00/12-15-048-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 27 | |
Section: 15 | |
County/Municipality: Leduc County | |
Well Name: ESSO WIZARD LAKE CPR D-2 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0004588 | |
License Date: 1952-04-30 | |
License Status: Abandoned | |
Spud Date: 1952-05-04 | |
Final Drill Date: 1952-06-07 | |
Well Total Depth: 2036.00 m | |
Surface Hole Latitude: 53.143296 | |
Surface Hole Longitude: -113.875255 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-04-30 | Obtained License |
1952-05-26 | Drill Stem Test Performed |
1952-05-28 | Drill Stem Test Performed |
1952-05-29 | Drill Stem Test Performed |
1952-06-04 | Production Casing Operation Performed |
1952-06-07 | Finished Drilling |
1952-06-07 | Perforation Treatment Performed - Open-Hole Completion |
1952-06-07 | Well Mode changed to Drilled and Cased |
1952-06-09 | Well Began Production |
1952-06-09 | Well Fluid changed to Crude Oil |
1952-06-09 | Well Mode changed to Flowing |
1971-07-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1972-08-07 | Perforation Treatment Performed - Open-Hole Completion |
1980-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-06-08 | Perforation Treatment Performed - Open-Hole Completion |
1982-06-21 | Perforation Treatment Performed - Chemical Squeeze |
1983-05-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-11-28 | Well Log Performed |
1985-02-20 | Perforation Treatment Performed - Open-Hole Completion |
1985-03-08 | Liner Casing Operation Performed |
1985-03-08 | Perforation Treatment Performed - Cement Squeeze |
1985-03-12 | Well Log Performed |
1985-03-16 | Well Log Performed |
1985-03-19 | Perforation Treatment Performed - Jet Perforation |
1985-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1986-10-03 | Perforation Treatment Performed - Jet Perforation |
1986-10-03 | Well Log Performed |
1986-10-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-02-02 | Perforation Treatment Performed - Jet Perforation |
1987-02-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-02-03 | Well Log Performed |
1987-02-04 | Well Log Performed |
1987-02-06 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1987-03-25 | Well Log Performed |
1987-06-18 | Perforation Treatment Performed - Fractured |
1987-06-18 | Well Log Performed |
1987-07-20 | Perforation Treatment Performed - Jet Perforation |
1987-07-20 | Well Log Performed |
1987-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-09-13 | Well Log Performed |
1990-09-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-09-15 | Perforation Treatment Performed - Cement Squeeze |
1990-09-20 | Perforation Treatment Performed - Cement Squeeze |
1990-09-23 | Perforation Treatment Performed - Jet Perforation |
1990-09-23 | Well Log Performed |
1990-09-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-10-09 | Perforation Treatment Performed - Cement Squeeze |
1995-10-10 | Perforation Treatment Performed - Jet Perforation |
1995-10-13 | Perforation Treatment Performed - Cement Squeeze |
1995-10-15 | Perforation Treatment Performed - Jet Perforation |
1995-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-09-13 | Perforation Treatment Performed - Jet Perforation |
1998-09-13 | Well Log Performed |
2010-06-01 | Well Fluid changed to Crude Oil |
2010-06-01 | Well Mode changed to Suspended |
2011-10-24 | Well Log Performed |
2012-06-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-06-14 | Perforation Treatment Performed - Jet Perforation |
2012-06-14 | Plug Back Performed |
2012-06-14 | Well Fluid changed to Crude Oil |
2012-06-14 | Well Log Performed |
2012-06-14 | Well Mode changed to Abandoned Zone |
2012-06-16 | Perforation Treatment Performed - Cement Plug |
2012-06-16 | Perforation Treatment Performed - Remedial Casing |
2012-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-06-17 | Perforation Treatment Performed - Jet Perforation |
2012-06-17 | Perforation Treatment Performed - Remedial Casing |
2012-06-17 | Well Log Performed |
2012-06-19 | Perforation Treatment Performed - Jet Perforation |
2012-06-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2012-06-20 | Perforation Treatment Performed - Cement Plug |
2012-06-20 | Perforation Treatment Performed - Remedial Casing |
2013-06-18 | Well Abandoned |
2013-06-18 | Well Fluid changed to Crude Oil |
2013-06-18 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-06-07 | Open Hole/Barefoot Completion | 1920.80 | 1948.00 | 0 |
1985-03-19 | Perforation | 1988.40 | 1988.90 | 13 |
1985-03-20 | Acid Treatment | 1988.40 | 1988.90 | 0 |
1986-10-03 | Perforation | 1994.00 | 1994.50 | 7 |
1986-10-14 | Acid Treatment | 1994.00 | 1994.50 | 0 |
1987-02-02 | Perforation | 1937.20 | 1937.70 | 7 |
1987-02-03 | Acid Treatment | 1937.20 | 1937.70 | 0 |
1987-02-06 | Acid Treatment | 1937.20 | 1937.70 | 0 |
1987-06-18 | Fracture | 1937.20 | 1937.70 | 0 |
1987-07-20 | Perforation | 1996.50 | 1997.00 | 13 |
1987-07-21 | Acid Treatment | 1994.00 | 1997.00 | 0 |
1971-07-16 | Acid Treatment | 1920.80 | 1948.00 | 0 |
1990-09-15 | Acid Treatment | 1937.20 | 1937.70 | 0 |
1990-09-15 | Cement Squeeze | 1937.20 | 1937.70 | 0 |
1990-09-20 | Cement Squeeze | 1988.40 | 1997.00 | 0 |
1990-09-23 | Perforation | 1937.20 | 1937.70 | 13 |
1990-09-23 | Perforation | 2002.40 | 2003.40 | 13 |
1990-09-23 | Perforation | 2005.40 | 2006.40 | 13 |
1990-09-23 | Perforation | 2008.40 | 2009.40 | 13 |
1990-09-24 | Acid Treatment | 1937.20 | 2009.40 | 0 |
1995-10-09 | Cement Squeeze | 1937.20 | 2009.40 | 0 |
1995-10-10 | Perforation | 2008.40 | 2008.70 | 72 |
1972-08-07 | Open Hole/Barefoot Completion | 1920.80 | 1994.90 | 0 |
1995-10-13 | Cement Squeeze | 2008.40 | 2008.70 | 0 |
1995-10-15 | Perforation | 1939.50 | 1940.00 | 20 |
1995-10-15 | Perforation | 2008.90 | 2009.40 | 20 |
1995-10-16 | Acid Treatment | 1939.50 | 2009.40 | 0 |
1998-09-13 | Perforation | 2011.80 | 2012.30 | 20 |
1998-09-13 | Perforation | 2015.40 | 2015.90 | 20 |
2012-06-14 | Packing Device Capped w/Cement | 1308.40 | 1930.00 | 0 |
2012-06-14 | Perforation | 1260.70 | 1261.70 | 17 |
2012-06-14 | Perforation | 710.00 | 711.00 | 17 |
2012-06-16 | Remedial Casing Cementing | 710.00 | 1261.70 | 0 |
1980-11-07 | Acid Treatment | 1920.80 | 1994.90 | 0 |
2012-06-16 | Cement Plug | 476.90 | 1322.40 | 0 |
2012-06-17 | Packing Device Capped w/Cement | 468.30 | 477.00 | 0 |
2012-06-17 | Perforation | 467.90 | 468.90 | 17 |
2012-06-17 | Remedial Casing Cementing | 467.90 | 468.90 | 0 |
2012-06-17 | Packing Device Capped w/Cement | 448.40 | 458.30 | 0 |
2012-06-19 | Perforation | 400.00 | 401.00 | 17 |
2012-06-19 | Perforation | 325.00 | 326.00 | 17 |
2012-06-19 | Perforation | 301.00 | 302.00 | 17 |
2012-06-19 | Perforation | 286.00 | 287.00 | 17 |
2012-06-19 | Perforation | 253.00 | 254.00 | 17 |
1982-06-08 | Open Hole/Barefoot Completion | 1920.80 | 2022.90 | 0 |
2012-06-19 | Perforation | 196.00 | 197.00 | 17 |
2012-06-20 | Remedial Casing Cementing | 196.00 | 401.00 | 0 |
2012-06-20 | Cement Plug | 191.80 | 448.40 | 0 |
2012-06-20 | Packing Device Capped w/Cement | 183.70 | 191.70 | 0 |
1982-06-21 | Chemical Squeeze | 1920.80 | 2022.90 | 0 |
1983-05-12 | Acid Treatment | 1920.80 | 2022.90 | 0 |
1985-02-20 | Open Hole/Barefoot Completion | 1920.80 | 2036.00 | 0 |
1985-03-08 | Cement Squeeze | 1920.80 | 2036.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 5446 | 0.0 | 0.0 | 0.0 |
1968 | 8110 | 0.0 | 0.0 | 0.0 |
1969 | 6712 | 0.0 | 0.0 | 0.0 |
1970 | 7170 | 0.0 | 0.0 | 0.0 |
1971 | 4483 | 0.0 | 0.0 | 0.0 |
1972 | 5834 | 0.0 | 0.0 | 0.0 |
1973 | 4004 | 0.0 | 0.0 | 0.0 |
1974 | 4808 | 0.0 | 0.0 | 0.0 |
1975 | 7237 | 0.0 | 0.0 | 0.0 |
1976 | 3791 | 0.0 | 0.0 | 0.0 |
1977 | 2308 | 0.0 | 0.0 | 0.0 |
1978 | 3812 | 0.0 | 0.0 | 0.0 |
1979 | 5613 | 0.0 | 0.0 | 0.0 |
1980 | 7062 | 0.0 | 0.0 | 0.0 |
1981 | 5695 | 0.0 | 0.0 | 0.0 |
1982 | 3402 | 0.0 | 0.0 | 0.0 |
1983 | 6174 | 0.0 | 0.0 | 0.0 |
1984 | 8342 | 0.0 | 0.0 | 0.0 |
1985 | 7825 | 0.0 | 0.0 | 0.0 |
1986 | 5447 | 0.0 | 0.0 | 0.0 |
1987 | 4794 | 0.0 | 0.0 | 0.0 |
1988 | 8713 | 0.0 | 0.0 | 0.0 |
1989 | 8274 | 0.0 | 0.0 | 0.0 |
1990 | 6784 | 0.0 | 0.0 | 0.0 |
1991 | 7012 | 0.0 | 0.0 | 0.0 |
1992 | 8591 | 0.0 | 0.0 | 0.0 |
1993 | 5689 | 0.0 | 0.0 | 0.0 |
1994 | 8007 | 0.0 | 0.0 | 0.0 |
1995 | 6376 | 0.0 | 0.0 | 0.0 |
1996 | 5104 | 0.0 | 0.0 | 0.0 |
1997 | 7943 | 0.0 | 0.0 | 0.0 |
1998 | 8345 | 0.0 | 0.0 | 0.0 |
1999 | 7555 | 0.0 | 0.0 | 0.0 |
2000 | 6463 | 0.0 | 0.0 | 0.0 |
2001 | 7572 | 0.0 | 0.0 | 0.0 |
2002 | 8290 | 0.0 | 0.0 | 0.0 |
2003 | 7024 | 0.0 | 0.0 | 0.0 |
2004 | 7215 | 0.0 | 0.0 | 0.0 |
2005 | 7624 | 0.0 | 0.0 | 0.0 |
2006 | 8719 | 0.0 | 0.0 | 0.0 |
2007 | 2150 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-06-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]