If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0484270915002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.132274,"lon":-113.887578,"icon":""}]} |
| Location: 00/15-09-048-27W4/2 | |
| Location Alias: 00/15-09-48-27 W4M | |
| Location Alias 2: 00/15-09-048-27 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 048 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 09 | |
| County/Municipality: Leduc County | |
| Well Name: ESSO WIZARD LAKE C.P.R. NO. G-4 | |
| Operator Name: Imperial Oil Resources Limited | |
| License Number: 0005346 | |
| License Date: 1952-09-22 | |
| License Status: Abandoned | |
| Spud Date: 1952-09-23 | |
| Final Drill Date: 1952-10-23 | |
| Well Total Depth: 2036.00 m | |
| Surface Hole Latitude: 53.132274 | |
| Surface Hole Longitude: -113.887578 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1952-09-22 | Obtained License |
| 1952-10-20 | Production Casing Operation Performed |
| 1952-10-23 | Finished Drilling |
| 1952-10-23 | Perforation Treatment Performed - Open-Hole Completion |
| 1952-10-23 | Well Mode changed to Drilled and Cased |
| 1959-05-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1959-05-06 | Perforation Treatment Performed - Jet Perforation |
| 1959-05-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1959-05-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1959-05-11 | Perforation Treatment Performed - Cement Squeeze |
| 1959-05-13 | Perforation Treatment Performed - Bullet Perforation |
| 1959-05-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1959-07-30 | Well Began Production |
| 1959-07-30 | Well Fluid changed to Crude Oil |
| 1959-07-30 | Well Mode changed to Pumping |
| 1962-08-13 | Well Fluid changed to Crude Oil |
| 1962-08-13 | Well Mode changed to Suspended |
| 1971-10-29 | Perforation Treatment Performed - Cement Squeeze |
| 1971-11-17 | Perforation Treatment Performed - Condensate Squeeze |
| 1971-11-17 | Perforation Treatment Performed - Open-Hole Completion |
| 1971-11-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1979-10-29 | Well Fluid changed to Crude Oil |
| 1979-10-29 | Well Mode changed to Abandoned Zone |
| 1984-01-07 | Well Log Performed |
| 1984-01-11 | Perforation Treatment Performed - Open-Hole Completion |
| 1984-01-11 | Well Log Performed |
| 1984-02-20 | Well Log Performed |
| 1984-05-09 | Well Log Performed |
| 1984-08-24 | Well Log Performed |
| 1984-10-06 | Well Log Performed |
| 1984-10-10 | Well Log Performed |
| 1984-10-11 | Well Log Performed |
| 1984-11-09 | Well Log Performed |
| 1984-11-21 | Well Log Performed |
| 1985-06-10 | Well Log Performed |
| 1985-08-27 | Well Log Performed |
| 1985-11-18 | Well Log Performed |
| 1986-06-06 | Well Log Performed |
| 1986-08-18 | Well Log Performed |
| 1986-11-13 | Well Log Performed |
| 1986-12-02 | Well Log Performed |
| 1986-12-23 | Well Log Performed |
| 1987-01-13 | Well Log Performed |
| 1987-02-10 | Well Log Performed |
| 1987-06-08 | Well Log Performed |
| 1987-08-11 | Well Log Performed |
| 1987-11-10 | Well Log Performed |
| 1988-02-22 | Well Log Performed |
| 1988-06-02 | Well Log Performed |
| 1988-08-23 | Well Log Performed |
| 1988-11-10 | Well Log Performed |
| 1989-02-20 | Well Log Performed |
| 1989-02-24 | Well Log Performed |
| 1989-05-24 | Well Log Performed |
| 1989-08-10 | Well Log Performed |
| 1990-02-13 | Well Log Performed |
| 1990-05-29 | Well Log Performed |
| 1990-08-07 | Well Log Performed |
| 1991-05-23 | Well Log Performed |
| 1991-09-05 | Well Log Performed |
| 1991-11-25 | Well Log Performed |
| 1992-05-12 | Well Log Performed |
| 1992-08-19 | Well Log Performed |
| 1992-11-30 | Well Log Performed |
| 1993-06-21 | Well Log Performed |
| 1993-07-19 | Well Log Performed |
| 1994-05-05 | Well Log Performed |
| 1994-07-06 | Well Log Performed |
| 1994-08-04 | Well Log Performed |
| 1994-09-06 | Well Log Performed |
| 1994-10-05 | Well Log Performed |
| 1995-02-14 | Well Log Performed |
| 1995-03-14 | Well Log Performed |
| 1995-09-14 | Well Log Performed |
| 1996-07-31 | Well Log Performed |
| 1996-11-25 | Well Log Performed |
| 1997-04-24 | Well Log Performed |
| 1997-10-31 | Well Log Performed |
| 1998-02-03 | Well Log Performed |
| 1998-03-23 | Well Log Performed |
| 1998-05-26 | Well Log Performed |
| 1998-11-10 | Well Log Performed |
| 1999-02-09 | Well Log Performed |
| 1999-05-21 | Well Log Performed |
| 1999-09-28 | Well Log Performed |
| 1999-12-14 | Well Log Performed |
| 2000-03-09 | Well Log Performed |
| 2000-06-13 | Well Log Performed |
| 2000-10-15 | Well Log Performed |
| 2000-10-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2000-10-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2000-12-15 | Well Log Performed |
| 2001-03-23 | Well Log Performed |
| 2001-07-03 | Well Log Performed |
| 2001-12-12 | Well Log Performed |
| 2002-06-19 | Well Log Performed |
| 2002-09-26 | Well Log Performed |
| 2002-11-26 | Well Log Performed |
| 2003-02-20 | Well Log Performed |
| 2003-06-24 | Well Log Performed |
| 2003-09-19 | Well Log Performed |
| 2003-11-27 | Well Log Performed |
| 2004-02-14 | Well Log Performed |
| 2004-02-26 | Well Log Performed |
| 2004-05-28 | Well Log Performed |
| 2004-09-09 | Well Log Performed |
| 2004-12-02 | Well Log Performed |
| 2005-02-28 | Well Log Performed |
| 2005-03-01 | Well Log Performed |
| 2005-05-30 | Well Log Performed |
| 2005-05-31 | Well Log Performed |
| 2005-08-31 | Well Log Performed |
| 2005-09-02 | Well Log Performed |
| 2006-03-21 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-21 | Well Log Performed |
| 2006-10-10 | Well Log Performed |
| 2012-11-20 | Well Log Performed |
| 2012-11-21 | Well Log Performed |
| 2012-11-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-11-24 | Perforation Treatment Performed - Cement Squeeze |
| 2012-11-24 | Perforation Treatment Performed - Jet Perforation |
| 2012-11-24 | Perforation Treatment Performed - Remedial Casing |
| 2012-11-24 | Plug Back Performed |
| 2012-11-24 | Well Log Performed |
| 2012-11-27 | Perforation Treatment Performed - Jet Perforation |
| 2012-11-27 | Well Log Performed |
| 2012-11-28 | Perforation Treatment Performed - Cement Plug |
| 2012-11-28 | Perforation Treatment Performed - Remedial Casing |
| 2012-11-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2013-05-14 | Well Abandoned |
| 2013-05-14 | Well Fluid changed to Crude Oil |
| 2013-05-14 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1952-10-23 | Open Hole/Barefoot Completion | 1868.40 | 1898.60 | 0 |
| 1971-11-17 | Open Hole/Barefoot Completion | 1868.40 | 1898.60 | 0 |
| 1971-11-17 | Condensate Squeeze | 1868.40 | 1898.60 | 0 |
| 1971-11-19 | Acid Treatment | 1868.40 | 1898.60 | 0 |
| 1984-01-11 | Open Hole/Barefoot Completion | 1868.40 | 2036.00 | 0 |
| 2000-10-17 | Acid Treatment | 1993.00 | 1997.20 | 0 |
| 2000-10-18 | Acid Treatment | 1993.00 | 1997.20 | 0 |
| 2006-03-21 | Perforation | 1869.00 | 1872.00 | 20 |
| 2012-11-24 | Cement Squeeze | 1868.40 | 2036.00 | 0 |
| 2012-11-24 | Perforation | 751.00 | 752.00 | 17 |
| 2012-11-24 | Remedial Casing Cementing | 751.00 | 752.00 | 0 |
| 1959-05-06 | Packing Device Capped w/Cement | 1822.70 | 1822.70 | 0 |
| 2012-11-24 | Packing Device Capped w/Cement | 611.00 | 1861.50 | 0 |
| 2012-11-27 | Perforation | 485.90 | 486.90 | 17 |
| 2012-11-27 | Perforation | 447.00 | 448.00 | 17 |
| 2012-11-27 | Perforation | 434.50 | 435.50 | 17 |
| 2012-11-27 | Perforation | 384.00 | 385.00 | 17 |
| 2012-11-27 | Perforation | 356.00 | 357.00 | 17 |
| 2012-11-27 | Perforation | 344.50 | 345.50 | 17 |
| 2012-11-27 | Perforation | 331.00 | 332.00 | 17 |
| 2012-11-27 | Perforation | 304.00 | 305.00 | 17 |
| 2012-11-27 | Perforation | 282.00 | 283.00 | 17 |
| 1959-05-06 | Perforation | 1787.00 | 1792.20 | 13 |
| 2012-11-27 | Perforation | 254.00 | 255.00 | 17 |
| 2012-11-27 | Perforation | 232.00 | 233.00 | 17 |
| 2012-11-27 | Perforation | 200.00 | 201.00 | 17 |
| 2012-11-28 | Remedial Casing Cementing | 200.00 | 486.90 | 0 |
| 2012-11-28 | Cement Plug | 473.00 | 486.90 | 0 |
| 2012-11-30 | Packing Device Capped w/Cement | 197.70 | 472.50 | 0 |
| 2012-11-30 | Packing Device Capped w/Cement | 181.00 | 197.20 | 0 |
| 1959-05-07 | Acid Treatment | 1787.00 | 1792.20 | 0 |
| 1959-05-11 | Acid Treatment | 1787.00 | 1792.20 | 0 |
| 1959-05-11 | Cement Squeeze | 1787.00 | 1792.20 | 0 |
| 1959-05-13 | Bullet Perforation | 1781.90 | 1783.70 | 13 |
| 1959-05-14 | Acid Treatment | 1781.90 | 1783.70 | 0 |
| 1971-10-29 | Cement Squeeze | 1781.90 | 1783.70 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-12-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]