X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484262204000

Well Details

Well ID: 0484262204000
Loading map...
Location: 00/04-22-048-26W4/0
Location Alias: 00/04-22-48-26 W4M
Location Alias 2: 00/04-22-048-26 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 26
Section: 22
County/Municipality: Leduc County
Well Name: ALTURA LEDUC-WB 4-22-48-26
Operator Name: Altura Energy Inc.
License Number: 0490028
License Date: 2018-07-17
License Status: Issued
Spud Date: 2018-07-26
Final Drill Date: 2018-08-02
Well Total Depth: 3791.00 m
Surface Hole Latitude: 53.172274
Surface Hole Longitude: -113.726143

For data sources see[1][2]

Well History

Date Event
2018-07-17 Obtained License
2018-07-27 Surface Casing Operation Performed
2018-07-28 Direction Drilling Operation Performed - Deviate
2018-07-28 Direction Drilling Operation Performed - Horizontal
2018-07-28 Well Log Performed
2018-07-30 Intermediate Casing Operation Performed
2018-08-02 Finished Drilling
2018-08-02 Liner Casing Operation Performed
2018-08-02 Well Log Performed
2018-08-02 Well Mode changed to Drilled and Cased
2018-08-03 Rig Released
2018-08-20 Well Log Performed
2018-08-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-10-01 Well Began Production
2018-10-01 Well Fluid changed to Crude Oil
2018-10-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-26 Precision Drilling Corporation 183 N/A Drill To LD
2018-07-26 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-28 932.90 Deviate (5 - 79 degrees)
2018-07-28 1527.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-08-22 Multi-Stage Fracture 3747.90 3748.00 0
2018-08-23 Multi-Stage Fracture 3379.70 3379.80 0
2018-08-23 Multi-Stage Fracture 3338.60 3338.70 0
2018-08-23 Multi-Stage Fracture 3297.60 3297.70 0
2018-08-23 Multi-Stage Fracture 3256.20 3256.30 0
2018-08-23 Multi-Stage Fracture 3215.30 3215.40 0
2018-08-23 Multi-Stage Fracture 3174.10 3174.20 0
2018-08-23 Multi-Stage Fracture 3132.70 3132.80 0
2018-08-23 Multi-Stage Fracture 3091.40 3091.50 0
2018-08-23 Multi-Stage Fracture 3050.00 3050.10 0
2018-08-23 Multi-Stage Fracture 3011.10 3011.20 0
2018-08-22 Multi-Stage Fracture 3709.50 3709.60 0
2018-08-23 Multi-Stage Fracture 2969.70 2969.80 0
2018-08-23 Multi-Stage Fracture 2928.50 2928.60 0
2018-08-23 Multi-Stage Fracture 2887.10 2887.20 0
2018-08-23 Multi-Stage Fracture 2845.70 2845.80 0
2018-08-23 Multi-Stage Fracture 2804.30 2804.40 0
2018-08-23 Multi-Stage Fracture 2763.00 2763.10 0
2018-08-23 Multi-Stage Fracture 2721.70 2721.80 0
2018-08-23 Multi-Stage Fracture 2680.20 2680.30 0
2018-08-23 Multi-Stage Fracture 2639.20 2639.30 0
2018-08-23 Multi-Stage Fracture 2600.20 2600.30 0
2018-08-22 Multi-Stage Fracture 3668.80 3668.90 0
2018-08-23 Multi-Stage Fracture 2558.80 2558.90 0
2018-08-23 Multi-Stage Fracture 2517.80 2517.90 0
2018-08-23 Multi-Stage Fracture 2476.70 2476.80 0
2018-08-23 Multi-Stage Fracture 2435.40 2435.50 0
2018-08-23 Multi-Stage Fracture 2394.00 2394.10 0
2018-08-23 Multi-Stage Fracture 2352.70 2352.80 0
2018-08-23 Multi-Stage Fracture 2311.20 2311.30 0
2018-08-23 Multi-Stage Fracture 2269.90 2270.00 0
2018-08-23 Multi-Stage Fracture 2229.00 2229.10 0
2018-08-23 Multi-Stage Fracture 2187.60 2187.70 0
2018-08-22 Multi-Stage Fracture 3627.40 3627.50 0
2018-08-23 Multi-Stage Fracture 2146.70 2146.80 0
2018-08-23 Multi-Stage Fracture 2105.70 2105.80 0
2018-08-23 Multi-Stage Fracture 2064.50 2064.60 0
2018-08-23 Multi-Stage Fracture 2024.70 2024.80 0
2018-08-23 Multi-Stage Fracture 1983.30 1983.40 0
2018-08-23 Multi-Stage Fracture 1941.90 1942.00 0
2018-08-23 Multi-Stage Fracture 1862.40 1862.50 0
2018-08-23 Multi-Stage Fracture 1820.90 1821.00 0
2018-08-23 Multi-Stage Fracture 1779.50 1779.60 0
2018-08-24 Multi-Stage Fracture 1738.10 1738.20 0
2018-08-23 Multi-Stage Fracture 3586.00 3586.10 0
2018-08-24 Multi-Stage Fracture 1697.00 1697.10 0
2018-08-24 Multi-Stage Fracture 1655.70 1655.80 0
2018-08-24 Multi-Stage Fracture 1614.40 1614.50 0
2018-08-23 Multi-Stage Fracture 3544.90 3545.00 0
2018-08-23 Multi-Stage Fracture 3503.50 3503.60 0
2018-08-23 Multi-Stage Fracture 3462.20 3462.30 0
2018-08-23 Multi-Stage Fracture 3420.90 3421.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-22 2018-08-24 1,340 2,834 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 78.4632 N/A
Frac Sand - Regular Iron Horse Energy Services Crystalline Silica 14808-60-7 100 21.0442 N/A
Tolcide PS75LT Fusion Technologies Inc. Bactericide/Biocide Tetrakis(Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0463 N/A
water 7732-18-5 100 0.0463 N/A
IH-BAP-1 Fusion Technologies Inc. Breaker Ammonium Persulfate 7727-54-0 100 0.0088 N/A
IH-CS-4 Fusion Technologies Inc. Clay Control Non-Whimis Regulated Not Available 100 0.0724 N/A
IH-CBX-5 Fusion Technologies Inc. Crosslinker Boric Acid 10043-35-3 100 0.1014 N/A
Ethylene glycol 107-21-1 100 0.1014 N/A
Potassium Carbonate 584-08-7 100 0.1014 N/A
Potassium Hydroxide 1310-58-3 100 0.1014 N/A
IH-GA-1 Fusion Technologies Inc. Gelling Agent Low toxicity mineral oil 8042-47-5 100 0.2268 N/A
IH-NE-7 Fusion Technologies Inc. Surfactant Methanol 67-56-1 100 0.0592 N/A
Trimethylopropane ethoxylated 52624-57-4 100 0.0592 N/A
water 7732-18-5 100 0.0592 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-08-22 2018-08-23 Surface Water - Runoff 2834

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 1162 0.0 0.0 0.0
2019 8365 0.0 0.0 0.0
2020 2049 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-08-03 No Incident Encountered 0.00 0.00
2018-10-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References