X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484212711000

Well Details

Well ID: 0484212711000
Loading map...
Location: 00/11-27-048-21W4/0
Location Alias: 00/11-27-48-21 W4M
Location Alias 2: 00/11-27-048-21 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 21
Section: 27
County/Municipality: Camrose County
Well Name: CABRE JOARCAM 11-27-48-21
Operator Name: Enerplus Corporation
License Number: 0003875
License Date: 1951-11-30
License Status: RecCertified
Spud Date: 1951-12-03
Final Drill Date: 1951-12-08
Well Total Depth: 988.20 m
Surface Hole Latitude: 53.172893
Surface Hole Longitude: -112.991273

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-11-30 Obtained License
1951-12-08 Finished Drilling
1951-12-08 Perforation Treatment Performed - Open-Hole Completion
1951-12-08 Production Casing Operation Performed
1951-12-08 Well Mode changed to Drilled and Cased
1952-01-22 Well Began Production
1952-01-22 Well Fluid changed to Crude Oil
1952-01-22 Well Mode changed to Pumping
1973-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-04-01 Well Fluid changed to Crude Oil
1989-04-01 Well Mode changed to Suspended
1992-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-22 Perforation Treatment Performed - Jet Perforation
1992-07-22 Plug Back Performed
1992-07-22 Well Log Performed
1992-07-24 Perforation Treatment Performed - Remedial Casing
1992-07-24 Well Fluid changed to Crude Oil
1992-07-24 Well Mode changed to Abandoned
1992-07-30 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-12-08 Open Hole/Barefoot Completion 986.00 988.20 0
1973-06-06 Acid Treatment 986.00 988.20 0
1983-06-01 Acid Treatment 986.00 988.20 0
1992-07-22 Packing Device Capped w/Cement 969.10 977.10 0
1992-07-22 Perforation 160.00 160.50 7
1992-07-24 Remedial Casing Cementing 160.00 160.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4296 0.0 0.0 0.0
1968 8619 0.0 0.0 0.0
1969 7875 0.0 0.0 0.0
1970 7991 0.0 0.0 0.0
1971 8495 0.0 0.0 0.0
1972 8615 0.0 0.0 0.0
1973 8628 0.0 0.0 0.0
1974 6840 0.0 0.0 0.0
1975 8392 0.0 0.0 0.0
1976 8483 0.0 0.0 0.0
1977 8407 0.0 0.0 0.0
1978 6359 0.0 0.0 0.0
1979 8387 0.0 0.0 0.0
1980 7519 0.0 0.0 0.0
1981 1221 0.0 0.0 0.0
1982 4334 0.0 0.0 0.0
1983 6903 0.0 0.0 0.0
1984 7890 0.0 0.0 0.0
1985 8361 0.0 0.0 0.0
1986 7911 0.0 0.0 0.0
1987 8293 0.0 0.0 0.0
1988 8634 0.0 0.0 0.0
1989 2127 0.0 0.0 0.0

For data sources see[5]

References