X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484172506000

Well Details

Well ID: 0484172506000
Loading map...
Location: 00/06-25-048-17W4/0
Location Alias: 00/06-25-48-17 W4M
Location Alias 2: 00/06-25-048-17 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 17
Section: 25
County/Municipality: Beaver County
Well Name: PINE CLIFF BRUCE 6-25-48-17
Operator Name: Pine Cliff Energy Ltd.
License Number: 0042572
License Date: 1972-05-24
License Status: Issued
Spud Date: 1972-06-08
Final Drill Date: 1972-06-14
Well Total Depth: 1021.70 m
Surface Hole Latitude: 53.170136
Surface Hole Longitude: -112.356589

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-05-24 Obtained License
1972-06-13 Drill Stem Test Performed
1972-06-14 Finished Drilling
1972-06-14 Well Mode changed to Drilled and Cased
1972-06-16 Drill Stem Test Performed
1972-06-17 Production Casing Operation Performed
1972-06-24 Perforation Treatment Performed - Jet Perforation
1972-06-30 Perforation Treatment Performed - Acid Wash - No Pressure
1972-06-30 Perforation Treatment Performed - Jet Perforation
1972-07-01 Perforation Treatment Performed - Fractured
1972-09-01 Well Began Production
1972-09-01 Well Fluid changed to Gas
1972-09-01 Well Mode changed to Flowing
1975-07-13 Perforation Treatment Performed - Jet Perforation
1975-07-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-06-24 Perforation 787.60 788.80 13
1972-06-24 Perforation 784.90 786.70 13
1972-06-30 Perforation 784.60 786.70 13
1972-06-30 Perforation 787.30 788.80 13
1972-06-30 Perforation 793.40 795.50 13
1972-06-30 Acid Wash 787.30 795.50 0
1972-07-01 Fracture 787.30 795.50 0
1975-07-13 Perforation 830.00 831.20 7
1975-07-24 Packing Device Capped w/Cement 822.40 826.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 2518 0.0 0.0 0.0
1973 7470 0.0 0.0 0.0
1974 7668 0.0 0.0 0.0
1975 8059 0.0 0.0 0.0
1976 8462 0.0 0.0 0.0
1977 8182 0.0 0.0 0.0
1978 6878 0.0 0.0 0.0
1979 8723 0.0 0.0 0.0
1980 8385 0.0 0.0 0.0
1981 6408 0.0 0.0 0.0
1982 8281 0.0 0.0 0.0
1983 7917 0.0 0.0 0.0
1984 7942 0.0 0.0 0.0
1985 7548 0.0 0.0 0.0
1986 8620 0.0 0.0 0.0
1987 8042 0.0 0.0 0.0
1988 8655 0.0 0.0 0.0
1989 8707 0.0 0.0 0.0
1990 6716 0.0 0.0 0.0
1991 7779 0.0 0.0 0.0
1992 8664 0.0 0.0 0.0
1993 8744 0.0 0.0 0.0
1994 8753 0.0 0.0 0.0
1995 8492 0.0 0.0 0.0
1996 8560 0.0 0.0 0.0
1997 8720 0.0 0.0 0.0
1998 8718 0.0 0.0 0.0
1999 8575 0.0 0.0 0.0
2000 8760 0.0 0.0 0.0
2001 8678 0.0 0.0 0.0
2002 8757 0.0 0.0 0.0
2003 8738 0.0 0.0 0.0
2004 8624 0.0 0.0 0.0
2005 8690 0.0 0.0 0.0
2006 8666 0.0 0.0 0.0
2007 8586 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 8584 0.0 0.0 0.0
2011 8758 0.0 0.0 0.0
2012 8663 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8637 0.0 0.0 0.0
2018 8489 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References