If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484161109000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.128668,"lon":-112.225743,"icon":""}]} |
Location: 00/09-11-048-16W4/0 | |
Location Alias: 00/09-11-48-16 W4M | |
Location Alias 2: 00/09-11-048-16 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 16 | |
Section: 11 | |
County/Municipality: Beaver County | |
Well Name: SPL BRUCE 9-11-48-16 | |
Operator Name: Spur Petroleum Ltd. | |
License Number: 0297057 | |
License Date: 2003-11-27 | |
License Status: Suspension | |
Spud Date: 2003-12-07 | |
Final Drill Date: 2003-12-09 | |
Well Total Depth: 1024.00 m | |
Surface Hole Latitude: 53.128668 | |
Surface Hole Longitude: -112.225743 |
Date | Event |
---|---|
2003-11-27 | Obtained License |
2003-12-08 | Surface Casing Operation Performed |
2003-12-09 | Finished Drilling |
2003-12-09 | Well Mode changed to Drilled and Cased |
2003-12-10 | Production Casing Operation Performed |
2003-12-10 | Rig Released |
2003-12-10 | Well Log Performed |
2003-12-17 | Well Log Performed |
2003-12-18 | Perforation Treatment Performed - Jet Perforation |
2003-12-18 | Well Log Performed |
2004-01-03 | Well Fluid changed to Gas |
2004-01-03 | Well Mode changed to Testing |
2005-05-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-05-13 | Perforation Treatment Performed - Jet Perforation |
2005-05-13 | Plug Back Performed |
2005-05-13 | Well Fluid changed to Gas |
2005-05-13 | Well Log Performed |
2005-05-13 | Well Mode changed to Abandoned Zone |
2005-07-06 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2003-12-18 | Perforation | 848.50 | 854.00 | 17 |
2005-05-13 | Packing Device Capped w/Cement | 839.00 | 847.00 | 0 |
2005-05-13 | Perforation | 781.00 | 783.00 | 17 |
2005-05-13 | Perforation | 771.00 | 773.00 | 17 |
2005-07-06 | Fracture | 771.00 | 783.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 35 | 0.0 | 0.0 | 0.0 |
For data sources see[5]