X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484131716002

Well Details

Well ID: 0484131716002
Loading map...
Location: 00/16-17-048-13W4/2
Location Alias: 00/16-17-48-13 W4M
Location Alias 2: 00/16-17-048-13 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 13
Section: 17
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 16-17-48-13
Operator Name: Pine Cliff Energy Ltd.
License Number: 0078854
License Date: 1979-10-26
License Status: Issued
Spud Date: 1979-11-14
Final Drill Date: 1979-11-18
Well Total Depth: 855.00 m
Surface Hole Latitude: 53.143561
Surface Hole Longitude: -111.862734

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-10-26 Obtained License
1979-11-17 Drill Stem Test Performed
1979-11-18 Finished Drilling
1979-11-18 Well Mode changed to Drilled and Cased
1979-11-19 Drill Stem Test Performed
1979-11-19 Production Casing Operation Performed
1980-07-12 Perforation Treatment Performed - Jet Perforation
1980-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-11-10 Perforation Treatment Performed - Cement Squeeze
1983-11-10 Perforation Treatment Performed - Selective Jet Perforations
2001-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-04 Plug Back Performed
2001-08-05 Perforation Treatment Performed - Jet Perforation
2001-08-05 Well Began Production
2001-08-05 Well Fluid changed to Gas
2001-08-05 Well Mode changed to Flowing
2002-01-01 Well Fluid changed to Gas
2002-01-01 Well Mode changed to Suspended
2002-01-18 Perforation Treatment Performed - Jet Perforation
2002-01-18 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-12 Perforation 804.50 805.20 7
1980-07-17 Acid Treatment 804.50 805.20 0
1983-11-10 Selective Jet Perforations 265.00 265.00 0
1983-11-10 Cement Squeeze 265.00 265.00 0
2001-08-04 Packing Device Capped w/Cement 796.00 800.00 0
2001-08-05 Perforation 786.00 787.50 13
2002-01-18 Perforation 773.50 774.50 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1060 0.0 0.0 0.0

For data sources see[5]

References