If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484131716002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/16-17-048-13W4/2 | |
Location Alias: 00/16-17-48-13 W4M | |
Location Alias 2: 00/16-17-048-13 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 13 | |
Section: 17 | |
County/Municipality: Beaver County | |
Well Name: PINE CLIFF VIK-KINS 16-17-48-13 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0078854 | |
License Date: 1979-10-26 | |
License Status: Issued | |
Spud Date: 1979-11-14 | |
Final Drill Date: 1979-11-18 | |
Well Total Depth: 855.00 m | |
Surface Hole Latitude: 53.143561 | |
Surface Hole Longitude: -111.862734 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-10-26 | Obtained License |
1979-11-17 | Drill Stem Test Performed |
1979-11-18 | Finished Drilling |
1979-11-18 | Well Mode changed to Drilled and Cased |
1979-11-19 | Drill Stem Test Performed |
1979-11-19 | Production Casing Operation Performed |
1980-07-12 | Perforation Treatment Performed - Jet Perforation |
1980-07-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1983-11-10 | Perforation Treatment Performed - Cement Squeeze |
1983-11-10 | Perforation Treatment Performed - Selective Jet Perforations |
2001-08-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-08-04 | Plug Back Performed |
2001-08-05 | Perforation Treatment Performed - Jet Perforation |
2001-08-05 | Well Began Production |
2001-08-05 | Well Fluid changed to Gas |
2001-08-05 | Well Mode changed to Flowing |
2002-01-01 | Well Fluid changed to Gas |
2002-01-01 | Well Mode changed to Suspended |
2002-01-18 | Perforation Treatment Performed - Jet Perforation |
2002-01-18 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-07-12 | Perforation | 804.50 | 805.20 | 7 |
1980-07-17 | Acid Treatment | 804.50 | 805.20 | 0 |
1983-11-10 | Selective Jet Perforations | 265.00 | 265.00 | 0 |
1983-11-10 | Cement Squeeze | 265.00 | 265.00 | 0 |
2001-08-04 | Packing Device Capped w/Cement | 796.00 | 800.00 | 0 |
2001-08-05 | Perforation | 786.00 | 787.50 | 13 |
2002-01-18 | Perforation | 773.50 | 774.50 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 1060 | 0.0 | 0.0 | 0.0 |
For data sources see[5]