If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484130214000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.114304,"lon":-111.801728,"icon":""}]} |
Location: 00/14-02-048-13W4/0 | |
Location Alias: 00/14-02-48-13 W4M | |
Location Alias 2: 00/14-02-048-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 13 | |
Section: 02 | |
County/Municipality: Beaver County | |
Well Name: VOYAGER ET AL VIKING 14-2-48-13 | |
Operator Name: ConocoPhillips Canada Resources Corp. | |
License Number: 0077338 | |
License Date: 1979-08-07 | |
License Status: RecCertified | |
Spud Date: 1979-09-15 | |
Final Drill Date: 1979-09-18 | |
Well Total Depth: 850.00 m | |
Surface Hole Latitude: 53.114304 | |
Surface Hole Longitude: -111.801728 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-08-07 | Obtained License |
1979-09-17 | Drill Stem Test Performed |
1979-09-18 | Finished Drilling |
1979-09-19 | Drill Stem Test Performed |
1979-09-20 | Production Casing Operation Performed |
1979-09-20 | Well Mode changed to Drilled and Cased |
1980-06-19 | Perforation Treatment Performed - Jet Perforation |
1981-02-01 | Well Began Production |
1981-02-01 | Well Fluid changed to Gas |
1981-02-01 | Well Mode changed to Flowing |
1983-01-01 | Well Fluid changed to Gas |
1983-01-01 | Well Mode changed to Suspended |
1987-10-10 | Perforation Treatment Performed - Jet Perforation |
1987-10-10 | Well Log Performed |
1987-10-25 | Well Fluid changed to Gas |
1987-10-25 | Well Mode changed to Flowing |
1987-11-04 | Well Fluid changed to Gas |
1987-11-04 | Well Mode changed to Suspended |
1991-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-12-06 | Plug Back Performed |
1991-12-06 | Well Fluid changed to Gas |
1991-12-06 | Well Mode changed to Abandoned |
1991-12-07 | Perforation Treatment Performed - Jet Perforation |
1991-12-07 | Perforation Treatment Performed - Remedial Casing |
1991-12-07 | Well Log Performed |
1991-12-08 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-06-19 | Perforation | 750.30 | 751.50 | 6 |
1987-10-10 | Perforation | 825.00 | 826.50 | 13 |
1991-12-06 | Packing Device Capped w/Cement | 812.00 | 820.00 | 0 |
1991-12-06 | Packing Device Capped w/Cement | 737.00 | 745.00 | 0 |
1991-12-07 | Perforation | 214.00 | 215.00 | 13 |
1991-12-07 | Remedial Casing Cementing | 214.00 | 215.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1981 | 5322 | 0.0 | 0.0 | 0.0 |
1982 | 4275 | 0.0 | 0.0 | 0.0 |
1987 | 204 | 0.0 | 0.0 | 0.0 |
For data sources see[5]