X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484112107002

Well Details

Well ID: 0484112107002
Loading map...
Location: 00/07-21-048-11W4/2
Location Alias: 00/07-21-48-11 W4M
Location Alias 2: 00/07-21-048-11 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 11
Section: 21
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 7-21-48-11
Operator Name: Pine Cliff Energy Ltd.
License Number: 0047836
License Date: 1973-10-26
License Status: Issued
Spud Date: 1973-10-30
Final Drill Date: 1973-11-04
Well Total Depth: 845.80 m
Surface Hole Latitude: 53.152215
Surface Hole Longitude: -111.549796

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-10-26 Obtained License
1973-11-04 Finished Drilling
1973-11-04 Well Mode changed to Drilled and Cased
1973-11-07 Drill Stem Test Performed
1973-11-10 Production Casing Operation Performed
1974-03-04 Perforation Treatment Performed - Jet Perforation
1974-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-08 Perforation Treatment Performed - Jet Perforation
1974-03-09 Perforation Treatment Performed - Cement Squeeze
1974-03-13 Perforation Treatment Performed - Jet Perforation
1974-03-20 Perforation Treatment Performed - Jet Perforation
1974-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1974-03-26 Perforation Treatment Performed - Jet Perforation
1987-07-03 Perforation Treatment Performed - Jet Perforation
1987-07-03 Well Log Performed
2002-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-18 Plug Back Performed
2002-03-19 Perforation Treatment Performed - Jet Perforation
2002-03-19 Well Log Performed
2002-03-25 Well Began Production
2002-03-25 Well Fluid changed to Gas
2002-03-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-03-04 Perforation 797.40 801.00 7
1987-07-03 Perforation 762.30 763.20 13
1987-07-03 Perforation 764.40 765.70 13
2002-03-18 Packing Device Capped w/Cement 746.00 754.00 0
2002-03-19 Perforation 657.70 660.70 20
1974-03-06 Acid Treatment 797.40 801.00 0
1974-03-08 Perforation 804.10 805.30 13
1974-03-09 Cement Squeeze 797.40 805.30 0
1974-03-13 Perforation 794.90 798.00 13
1974-03-20 Perforation 798.90 800.40 13
1974-03-22 Acid Treatment 798.90 800.40 0
1974-03-25 Packing Device Capped w/Cement 791.30 791.30 0
1974-03-26 Perforation 764.40 765.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6628 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8740 0.0 0.0 0.0
2008 8456 0.0 0.0 0.0
2009 8664 0.0 0.0 0.0
2010 8498 0.0 0.0 0.0
2011 8659 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8688 0.0 0.0 0.0
2014 8572 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References