X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484111307002

Well Details

Well ID: 0484111307002
Loading map...
Location: 00/07-13-048-11W4/2
Location Alias: 00/07-13-48-11 W4M
Location Alias 2: 00/07-13-048-11 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 11
Section: 13
County/Municipality: Beaver County
Well Name: PINE CLIFF VIK-KINS 7-13-48-11
Operator Name: Pine Cliff Energy Ltd.
License Number: 0066994
License Date: 1977-11-24
License Status: Issued
Spud Date: 1977-11-25
Final Drill Date: 1977-11-29
Well Total Depth: 868.70 m
Surface Hole Latitude: 53.136288
Surface Hole Longitude: -111.475907

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-24 Obtained License
1977-11-29 Finished Drilling
1977-11-29 Well Mode changed to Drilled and Cased
1977-12-01 Drill Stem Test Performed
1977-12-02 Drill Stem Test Performed
1977-12-03 Production Casing Operation Performed
1978-07-23 Perforation Treatment Performed - Jet Perforation
1979-06-14 Perforation Treatment Performed - Cement Squeeze
1979-06-21 Perforation Treatment Performed - Jet Perforation
1980-01-30 Perforation Treatment Performed - Cement Squeeze
1980-02-01 Perforation Treatment Performed - Jet Perforation
1999-12-15 Perforation Treatment Performed - Jet Perforation
1999-12-15 Perforation Treatment Performed - Remedial Casing
2002-03-20 Well Log Performed
2002-03-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-21 Perforation Treatment Performed - Jet Perforation
2002-03-21 Plug Back Performed
2002-03-21 Well Log Performed
2002-03-25 Well Began Production
2002-03-25 Well Fluid changed to Gas
2002-03-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-23 Perforation 842.50 844.00 13
2002-03-21 Perforation 667.50 670.00 20
2002-03-21 Perforation 377.60 378.60 20
1979-06-14 Cement Squeeze 842.50 844.00 0
1979-06-21 Perforation 842.50 844.00 14
1980-01-30 Cement Squeeze 842.50 844.00 0
1980-02-01 Perforation 833.90 834.80 13
1980-02-01 Perforation 836.40 837.80 13
1999-12-15 Perforation 377.60 378.60 14
1999-12-15 Remedial Casing Cementing 377.60 378.60 0
2002-03-21 Packing Device Capped w/Cement 816.00 824.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 6360 0.0 0.0 0.0
2003 8612 0.0 0.0 0.0
2004 8611 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8659 0.0 0.0 0.0
2007 8523 0.0 0.0 0.0
2008 8557 0.0 0.0 0.0
2009 6327 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8402 0.0 0.0 0.0
2014 8615 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 7739 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 6408 0.0 0.0 0.0
2020 126 0.0 0.0 0.0

For data sources see[5]

References