X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484103208003

Well Details

Well ID: 0484103208003
Loading map...
Location: 00/08-32-048-10W4/3
Location Alias: 00/08-32-48-10 W4M
Location Alias 2: 00/08-32-048-10 W4/03
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 10
Section: 32
County/Municipality: County of Minburn No. 27
Well Name: PINE CLIFF VIK-KINS 8-32-48-10
Operator Name: Pine Cliff Energy Ltd.
License Number: 0286521
License Date: 2003-05-01
License Status: Issued
Spud Date: 2003-05-28
Final Drill Date: 2003-05-29
Well Total Depth: 850.00 m
Surface Hole Latitude: 53.180172
Surface Hole Longitude: -111.424706

For data sources see[1][2]

Well History

Date Event
2003-05-01 Obtained License
2003-05-28 Surface Casing Operation Performed
2003-05-29 Finished Drilling
2003-05-29 Production Casing Operation Performed
2003-05-29 Well Log Performed
2003-05-29 Well Mode changed to Drilled and Cased
2003-05-30 Rig Released
2003-06-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-11 Perforation Treatment Performed - Jet Perforation
2003-06-11 Plug Back Performed
2003-06-11 Well Log Performed
2003-06-13 Perforation Treatment Performed - Jet Perforation
2003-06-13 Well Log Performed
2003-06-16 Perforation Treatment Performed - Fractured
2009-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-06 Plug Back Performed
2009-08-08 Perforation Treatment Performed - Jet Perforation
2009-08-08 Well Log Performed
2009-08-09 Perforation Treatment Performed - Fractured
2010-01-14 Well Began Production
2010-01-14 Well Fluid changed to Gas
2010-01-14 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-06-11 Perforation 733.00 735.00 20
2003-06-11 Packing Device Capped w/Cement 720.00 728.00 0
2003-06-13 Perforation 699.00 704.00 13
2003-06-16 Fracture 699.00 704.00 0
2009-08-06 Packing Device Capped w/Cement 686.00 694.00 0
2009-08-08 Perforation 478.50 481.50 17
2009-08-09 Fracture 478.50 481.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 8439 0.0 0.0 0.0
2011 8754 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References