X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484092302000

Well Details

Well ID: 0484092302000
Loading map...
Location: 00/02-23-048-09W4/0
Location Alias: 00/02-23-48-09 W4M
Location Alias 2: 00/02-23-048-09 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 09
Section: 23
County/Municipality: County of Minburn No. 27
Well Name: HARVEST 2B2 VIK-KINS 2-23-48-9
Operator Name: Cardinal Energy Ltd.
License Number: 0159093
License Date: 1993-06-11
License Status: Issued
Spud Date: 1993-07-24
Final Drill Date: 1993-07-27
Well Total Depth: 765.50 m
Surface Hole Latitude: 53.147686
Surface Hole Longitude: -111.207670

For data sources see[1][2]

Well History

Date Event
1993-06-11 Obtained License
1993-07-24 Direction Drilling Operation Performed - Deviate
1993-07-25 Surface Casing Operation Performed
1993-07-27 Finished Drilling
1993-07-27 Production Casing Operation Performed
1993-07-27 Well Log Performed
1993-07-27 Well Mode changed to Drilled and Cased
1993-07-28 Rig Released
1993-08-07 Perforation Treatment Performed - Jet Perforation
1993-08-07 Well Log Performed
1993-09-01 Well Began Production
1993-09-01 Well Fluid changed to Crude Oil
1993-09-01 Well Mode changed to Pumping
1993-09-09 Well Log Performed
1997-05-21 Perforation Treatment Performed - Cement Squeeze
1997-05-26 Perforation Treatment Performed - Jet Perforation
1997-05-26 Well Log Performed
2006-06-17 Well Log Performed
2006-06-30 Well Log Performed
2006-08-02 Well Log Performed
2006-08-03 Perforation Treatment Performed - Jet Perforation
2006-09-20 Well Began Injection
2006-09-20 Well Fluid changed to Water
2006-09-20 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-07-24 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-08-07 Perforation 716.50 720.50 13
1997-05-21 Cement Squeeze 716.50 720.50 0
1997-05-26 Perforation 717.00 719.50 13
2006-08-03 Perforation 716.50 720.50 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2829 0.0 0.0 0.0
1994 8576 0.0 0.0 0.0
1995 5095 0.0 0.0 0.0
1996 7729 0.0 0.0 0.0
1997 7090 0.0 0.0 0.0
1998 862 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References