X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484091701000

Well Details

Well ID: 0484091701000
Loading map...
Location: 00/01-17-048-09W4/0
Location Alias: 00/01-17-48-09 W4M
Location Alias 2: 00/01-17-048-09 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 09
Section: 17
County/Municipality: Municipal District of Wainwright No. 61
Well Name: SPL 4-17 HZ VIK-KINS 1-17-48-9
Operator Name: Spur Petroleum Ltd.
License Number: 0435515
License Date: 2011-07-27
License Status: Issued
Spud Date: 2011-08-25
Final Drill Date: 2011-08-28
Well Total Depth: 1862.00 m
Surface Hole Latitude: 53.135201
Surface Hole Longitude: -111.294659

For data sources see[1][2]

Well History

Date Event
2011-07-27 Obtained License
2011-08-25 Surface Casing Operation Performed
2011-08-26 Direction Drilling Operation Performed - Horizontal
2011-08-26 Well Log Performed
2011-08-28 Finished Drilling
2011-08-28 Production Casing Operation Performed
2011-08-28 Rig Released
2011-08-28 Well Mode changed to Drilled and Cased
2011-09-03 Well Log Performed
2011-09-06 Perforation Treatment Performed - Jet Perforation
2011-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-28 Well Began Production
2011-10-28 Well Fluid changed to Shale Gas Only
2011-10-28 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-26 282.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-06 Perforation 1831.00 1831.50 20
2011-09-06 Perforation 793.50 794.00 20
2011-09-06 Perforation 696.50 697.00 20
2011-09-06 Perforation 601.20 601.70 20
2011-09-15 Multi-Stage Fracture 1831.00 1831.50 0
2011-09-15 Multi-Stage Fracture 1577.00 1577.50 0
2011-09-15 Multi-Stage Fracture 1458.00 1458.50 0
2011-09-15 Multi-Stage Fracture 1360.00 1360.50 0
2011-09-15 Multi-Stage Fracture 1265.00 1265.50 0
2011-09-15 Multi-Stage Fracture 1167.50 1168.00 0
2011-09-15 Multi-Stage Fracture 1072.00 1072.50 0
2011-09-06 Perforation 1577.00 1577.50 20
2011-09-15 Multi-Stage Fracture 975.50 976.00 0
2011-09-15 Multi-Stage Fracture 888.50 889.00 0
2011-09-15 Multi-Stage Fracture 793.50 794.00 0
2011-09-15 Multi-Stage Fracture 696.50 697.00 0
2011-09-15 Multi-Stage Fracture 601.20 601.70 0
2011-09-06 Perforation 1458.00 1458.50 20
2011-09-06 Perforation 1360.00 1360.50 20
2011-09-06 Perforation 1265.00 1265.50 20
2011-09-06 Perforation 1167.50 1168.00 20
2011-09-06 Perforation 1072.00 1072.50 20
2011-09-06 Perforation 975.50 976.00 20
2011-09-06 Perforation 888.50 889.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1451 0.0 0.0 0.0
2012 8699 0.0 0.0 0.0
2013 8293 0.0 0.0 0.0
2014 8733 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8729 0.0 0.0 0.0
2018 7230 0.0 0.0 0.0
2019 5120 0.0 0.0 0.0
2020 1008 0.0 0.0 0.0

For data sources see[6]

References