X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484090609002

Well Details

Well ID: 0484090609002
Loading map...
Location: 00/09-06-048-09W4/2
Location Alias: 00/09-06-48-09 W4M
Location Alias 2: 00/09-06-048-09 W4/02
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 09
Section: 06
County/Municipality: Municipal District of Wainwright No. 61
Well Name: CVE 9C VIK-KINS 9-6-48-9
Operator Name: Cardinal Energy Ltd.
License Number: 0205218
License Date: 1997-08-21
License Status: Suspension
Spud Date: 1997-09-10
Final Drill Date: 1997-09-13
Well Total Depth: 861.00 m
Surface Hole Latitude: 53.111670
Surface Hole Longitude: -111.306898

For data sources see[1][2]

Well History

Date Event
1997-08-21 Obtained License
1997-09-10 Direction Drilling Operation Performed - Deviate
1997-09-11 Surface Casing Operation Performed
1997-09-13 Finished Drilling
1997-09-13 Well Log Performed
1997-09-13 Well Mode changed to Drilled and Cased
1997-09-14 Production Casing Operation Performed
1997-09-14 Rig Released
1997-09-24 Well Log Performed
1997-11-12 Perforation Treatment Performed - Jet Perforation
1997-11-12 Well Log Performed
1997-11-15 Perforation Treatment Performed - Fractured
2015-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-06-04 Plug Back Performed
2015-06-05 Perforation Treatment Performed - Jet Perforation
2015-07-20 Perforation Treatment Performed - Fractured
2015-08-06 Well Began Production
2015-08-06 Well Fluid changed to Crude Oil
2015-08-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-09-10 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-12 Perforation 799.00 801.00 13
1997-11-15 Fracture 799.00 801.00 0
2015-06-04 Packing Device Capped w/Cement 793.00 796.00 0
2015-06-05 Perforation 770.00 772.00 17
2015-07-20 Fracture 770.00 772.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3527 0.0 0.0 0.0
2016 8712 0.0 0.0 0.0
2017 5736 0.0 0.0 0.0
2018 5608 0.0 0.0 0.0
2019 5378 0.0 0.0 0.0
2020 526 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-04 No Incident Encountered 0.00 0.00
2015-07-09 No Incident Encountered 0.00 0.00
2015-07-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References