X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0484090302S00

Well Details

Well ID: 0484090302S00
Loading map...
Location: S0/02-03-048-09W4/0
Location Alias: S0/02-03-48-09 W4M
Location Alias 2: S0/02-03-048-09 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 09
Section: 03
County/Municipality: Municipal District of Wainwright No. 61
Well Name: SPL 2-34 HZ VIK-KINS 2-3-48-9
Operator Name: Spur Petroleum Ltd.
License Number: 0435432
License Date: 2011-07-25
License Status: Amended
Spud Date: 2011-08-10
Final Drill Date: 2011-08-14
Well Total Depth: 1855.00 m
Surface Hole Latitude: 53.089997
Surface Hole Longitude: -111.231476

For data sources see[1][2]

Well History

Date Event
2011-07-25 Obtained License
2011-08-10 Surface Casing Operation Performed
2011-08-11 Direction Drilling Operation Performed - Horizontal
2011-08-13 Well Log Performed
2011-08-14 Finished Drilling
2011-08-14 Well Mode changed to Drilled and Cased
2011-08-15 Production Casing Operation Performed
2011-08-15 Rig Released
2011-09-03 Well Log Performed
2011-09-04 Perforation Treatment Performed - Jet Perforation
2011-09-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-25 Well Began Production
2011-10-25 Well Fluid changed to Shale Gas Only
2011-10-25 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-11 230.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-04 Perforation 1835.00 1835.50 20
2011-09-04 Perforation 889.50 890.00 20
2011-09-04 Perforation 791.00 791.50 20
2011-09-04 Perforation 688.00 688.50 20
2011-09-04 Perforation 590.00 590.50 20
2011-09-13 Multi-Stage Fracture 1835.00 1835.50 0
2011-09-13 Multi-Stage Fracture 1736.00 1736.50 0
2011-09-13 Multi-Stage Fracture 1641.00 1641.50 0
2011-09-13 Multi-Stage Fracture 1537.00 1537.50 0
2011-09-13 Multi-Stage Fracture 1440.00 1440.50 0
2011-09-13 Multi-Stage Fracture 1342.00 1342.50 0
2011-09-04 Perforation 1736.00 1736.50 20
2011-09-13 Multi-Stage Fracture 1198.50 1199.00 0
2011-09-13 Multi-Stage Fracture 1090.00 1090.50 0
2011-09-13 Multi-Stage Fracture 993.50 994.00 0
2011-09-13 Multi-Stage Fracture 889.50 890.00 0
2011-09-13 Multi-Stage Fracture 791.00 791.50 0
2011-09-13 Multi-Stage Fracture 688.00 688.50 0
2011-09-13 Multi-Stage Fracture 590.00 590.50 0
2011-09-04 Perforation 1641.00 1641.50 20
2011-09-04 Perforation 1537.00 1537.50 20
2011-09-04 Perforation 1440.00 1440.50 20
2011-09-04 Perforation 1342.00 1342.50 20
2011-09-04 Perforation 1198.50 1199.00 20
2011-09-04 Perforation 1090.00 1090.50 20
2011-09-04 Perforation 993.50 994.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1595 0.0 0.0 0.0
2012 8583 0.0 0.0 0.0
2013 8715 0.0 0.0 0.0
2014 8627 0.0 0.0 0.0
2015 8447 0.0 0.0 0.0
2016 8639 0.0 0.0 0.0
2017 8729 0.0 0.0 0.0
2018 7348 0.0 0.0 0.0
2019 5018 0.0 0.0 0.0
2020 1505 0.0 0.0 0.0

For data sources see[6]

References