If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0484071306000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.136647,"lon":-110.9001,"icon":""}]} |
Location: 00/06-13-048-07W4/0 | |
Location Alias: 00/06-13-48-07 W4M | |
Location Alias 2: 00/06-13-048-07 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 07 | |
Section: 13 | |
County/Municipality: County of Vermilion River | |
Well Name: CNRL WILDMERE 6-13-48-7 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0061306 | |
License Date: 1976-11-25 | |
License Status: Abandoned | |
Spud Date: 1976-12-06 | |
Final Drill Date: 1976-12-09 | |
Well Total Depth: 710.20 m | |
Surface Hole Latitude: 53.136647 | |
Surface Hole Longitude: -110.900100 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-11-25 | Obtained License |
1976-12-09 | Finished Drilling |
1976-12-09 | Lost Circulation Occurred |
1976-12-10 | Drill Stem Test Performed |
1976-12-11 | Drill Stem Test Performed |
1976-12-12 | Drill Stem Test Performed |
1976-12-13 | Production Casing Operation Performed |
1976-12-13 | Well Mode changed to Drilled and Cased |
1981-05-30 | Perforation Treatment Performed - Jet Perforation |
1982-09-10 | Well Began Production |
1982-09-10 | Well Fluid changed to Gas |
1982-09-10 | Well Mode changed to Flowing |
1983-06-01 | Well Fluid changed to Gas |
1983-06-01 | Well Mode changed to Suspended |
2006-12-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-12-17 | Plug Back Performed |
2006-12-17 | Well Fluid changed to Gas |
2006-12-17 | Well Mode changed to Abandoned Zone |
2008-01-19 | Perforation Treatment Performed - Jet Perforation |
2008-01-19 | Perforation Treatment Performed - Remedial Casing |
2008-01-19 | Well Log Performed |
2008-08-04 | Well Log Performed |
2008-08-08 | Perforation Treatment Performed - Jet Perforation |
2008-08-08 | Well Log Performed |
2008-08-09 | Perforation Treatment Performed - Cement Plug |
2008-08-09 | Perforation Treatment Performed - Remedial Casing |
2008-10-01 | Perforation Treatment Performed - Cement Plug |
2008-10-01 | Perforation Treatment Performed - Jet Perforation |
2008-10-01 | Perforation Treatment Performed - Remedial Casing |
2009-09-24 | Well Log Performed |
2009-10-29 | Perforation Treatment Performed - Jet Perforation |
2009-10-30 | Perforation Treatment Performed - Cement Plug |
2009-10-30 | Perforation Treatment Performed - Remedial Casing |
2010-06-17 | Well Log Performed |
2010-06-25 | Perforation Treatment Performed - Jet Perforation |
2010-06-25 | Well Log Performed |
2010-06-27 | Perforation Treatment Performed - Remedial Casing |
2011-09-25 | Well Log Performed |
2011-09-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-09-26 | Plug Back Performed |
2011-09-27 | Well Abandoned |
2011-09-27 | Well Fluid changed to Gas |
2011-09-27 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1981-05-30 | Perforation | 676.60 | 677.80 | 10 |
2008-10-01 | Remedial Casing Cementing | 227.00 | 228.00 | 0 |
2008-10-01 | Cement Plug | 142.00 | 228.00 | 0 |
2009-10-29 | Perforation | 342.00 | 345.00 | 20 |
2009-10-30 | Remedial Casing Cementing | 342.00 | 345.00 | 0 |
2009-10-30 | Cement Plug | 316.00 | 335.00 | 0 |
2010-06-25 | Perforation | 308.00 | 309.00 | 20 |
2010-06-27 | Remedial Casing Cementing | 308.00 | 309.00 | 0 |
2011-09-26 | Packing Device Capped w/Cement | 212.00 | 220.00 | 0 |
2006-12-17 | Packing Device Capped w/Cement | 666.00 | 674.00 | 0 |
2008-01-19 | Perforation | 227.00 | 228.00 | 17 |
2008-01-19 | Remedial Casing Cementing | 227.00 | 228.00 | 0 |
2008-08-08 | Perforation | 341.00 | 341.30 | 99 |
2008-08-08 | Perforation | 341.00 | 343.00 | 13 |
2008-08-09 | Remedial Casing Cementing | 341.00 | 343.00 | 0 |
2008-08-09 | Cement Plug | 307.00 | 343.00 | 0 |
2008-10-01 | Perforation | 227.00 | 228.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 1842 | 0.0 | 0.0 | 0.0 |
1983 | 2214 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1976-12-09 | Lost Circulation | 710.20 | 710.20 |
For data sources see[6]